Flow Split Project Photosfiles.ctctcdn.com/9e121e2a401/92b99c91-a218-4238-80b2-c56b977… ·...

Post on 02-Aug-2020

2 views 0 download

Transcript of Flow Split Project Photosfiles.ctctcdn.com/9e121e2a401/92b99c91-a218-4238-80b2-c56b977… ·...

Aerial  map  of  Flow  Split  Project.  

View  toward  the  spring  runs  from  the  newly-­‐constructed  inlet  to  the  Old  Channel.

View  toward  the  New  Channel.

View  across  the  lake  from  the  Old  Channel  inlet.

Newly  constructed  inlet  for  Flow  Split  Project.  Water  flows  from  Landa  Lake  into  the  Old  Channel.

Flow  of  water  toward  the  Old  Channel  at  about  60  cubic  feet  per  second.

Water  flowing  in  the  Old  Channel.  The  City  of  New  Braunfels  removed  a  small  island  of  sediment  which  had  seJled  in  this  area  of  the  channel.

Invasive  plant  growth  across  the  river  will  be  removed  as  part  of  an  upcoming  bank  stabilizaMon  project.

Downstream  of  the  Old  Channel  inlet,  naMve  aquaMc  vegetaMon  is  growing  well  with  the  improvement  of  the  habitat.