Post on 02-Aug-2020
Aerial map of Flow Split Project.
View toward the spring runs from the newly-‐constructed inlet to the Old Channel.
View toward the New Channel.
View across the lake from the Old Channel inlet.
Newly constructed inlet for Flow Split Project. Water flows from Landa Lake into the Old Channel.
Flow of water toward the Old Channel at about 60 cubic feet per second.
Water flowing in the Old Channel. The City of New Braunfels removed a small island of sediment which had seJled in this area of the channel.
Invasive plant growth across the river will be removed as part of an upcoming bank stabilizaMon project.
Downstream of the Old Channel inlet, naMve aquaMc vegetaMon is growing well with the improvement of the habitat.