- FirstClassPartnerships, Inc. (FCP), a well-respected leader in
transportation planning, was contracted by the Ministry of
Transportation to develop a business case for transit in the
Greater Toronto and Hamilton Area, and a pre-feasibility study on
High Speed Rail from Toronto to London.
- Slide 10
- 17 million intercity trips per year in Toronto London corridor,
and demand keeps growing Today, travel is overwhelmingly by car, on
401 Bus and rail each have only 3% - 5 % In corridors with similar
population, density, car ownership and incomes, High Speed Rail is
commercially viable
- Slide 11
- Slide 12
- Slide 13
- LONDON TORONTO KITCHENER - WATERLOO PEARSON
- Slide 14
- By 2025, it would attract about 6 million passengers per year
About three-quarters of passengers would be diverted, with 20,000
car trips taken off 401 each day Fare revenues would repay most
capital investment with a net cost to government of about $500m
While High Speed Rail would directly serve only London and
Kitchener, GO riders from Guelph, and communities across south
western Ontario would see benefits
- Slide 15
- OptionTrainsInfrastructureIntercity HSR Trains per day London
to Toronto Intercity HSR Riders (2025, millions) Net Present Value
($m) Benefit Cost Ratio (with wider benefits) 1160 km/h LRCTrack
Renewal63 h 200.8(725)1.8 2160 km/h DMUSame82 h 331.1(1,114)1.8
3200 km/h DEMU+ Improvements to Kitchener + Acton- Rockwood bypass
282 h 112.2(1,450)1.9 4200 km/h DEMU+ Kitchener- London Direct Line
281 h 314.6(1,463)2.4 5320 km/h ElectricSame281 h
115.9(555)3.1
- Slide 16
- Intercity High Speed Rail 2 trains per hour all day, 320 km/h +
electrified 71 minutes from London to Union Station, Toronto, and
48 minutes from Kitchener to Union Station, Toronto. Business and
Economy Class Affordable fares competitive with other
transportation options GO Regional Express Rail Regional Express
Rail GTHA Transit Fund To Build Fully Electric Regional Rail
Network 15 minute two-way electric service on all lines within 10
years Will serve Guelph and Kitchener Interim subway relief for
Toronto Pre-feasibility numbers demonstrate that RER investments in
Toronto fundamentally change the numbers and present a strong case
to run HSR to London.
- Slide 17