PRESENTATION OUTLINE

●Background

●Map Development

●Map Results

●FEMA Timeline

●Recommendations

●Action Item

BACKGROUND

• 600 Lakes in Orange County• 12 Major Drainage Basins• 180,000 Acres of Floodplain• 50 Inches of Rainfall• FEMA Map Update

BACKGROUND

• Orange County participates in the National Flood Insurance Program (NFIP)

• Allows citizens to purchase flood insurance in flood prone areas

BACKGROUND

•FEMA requires Orange County to amend the Floodplain Ordinance

BACKGROUND

Community Rating System Upgrade Effective May 2008

●Class 5

●Premium Discount 25 %

●Average Savings Per Policy $ 64

●Total Annual Savings $ 828,306

Communities Participating in the CRS Program - 2008

0

50

100

150

200

250

300

350

400

450

500

10 9 8 7 6 5 4 3 2 1

CRS Class Rating

Nu

mb

er

of

Co

mm

un

itie

s

CRS Ranking

120

274

459

229

81

41

1 1 12

Greater DiscountSmaller Discount

Orange County Orange County (Top 4%)(Top 4%)

Orange County Orange County (Top 4%)(Top 4%)

% Premium Discount00 5 10 15 20 25 30 35 40 45

Nu

mb

er

of

Com

mu

nit

ies

Communities Participating in the CRS Program

BACKGROUND

Annual Flood Insurance Premiums

● Single-Family Homes Average $400-$450 Nationwide

● Orange County Average $383

● With 25% Discount $287

BACKGROUND

Flood Insurance Rate Map Dec. 2000

BACKGROUND

●May 2005 -Kickoff Meeting

●August 2006 -FIS Study Meeting

●September 2006 -Preliminary Maps

●March 6, 2007 -Presentation to BCC

●March 13, 2007 -Preliminary FIS Meeting

●March 13-14, 2007 -FEMA Public Outreach

PRESENTATION OUTLINE

●Background

●Map Development

●Map Results

●FEMA Timeline

●Recommendations

●Action Item

MAP DEVELOPMENT

WekivaRiver

LakeApopka

CypressCreek

ReedyCreek

ShingleCreek

LittleWekiva

HowellBranch

LittleEcon

BoggyCreek

LakeHart

BigEcon St. Johns River

LEGEND

Master Plans Provided to FEMA

Drainage Basins

Topographic Data Provided to FEMA

● New contours were provided to FEMA

● New jurisdictional boundaries provided

MAP DEVELOPMENT

• Street names were corrected

• Computer models were reviewed

• Impacts on citizens were determined

● LIDAR is the acronym for:

−Light Detectionand Ranging

● LIDAR can Measure:

−Distance−Speed−Rotation−Chemical Composition

MAP DEVELOPMENT

MAP DEVELOPMENT

PRESENTATION OUTLINE

●Background

●Map Development

●Map Results

●Issues

●FEMA Timeline

●Recommendations

●Action Item

MAP RESULTS

Summary of Parcels & Structures in Floodplain

Dec 2000 New Map Net Reduction %

Parcels 31,054 28,626 2,428 8

Structures 7,460 3,796 3,664 49

Commission District Dec 2000 New Maps   Dec 2000 New Maps

District 1 8,968 7,381 1,736 555

District 2 3,240 2,869 877 612

District 3 3,652 3,835 1,142 721

District 4 8,892 8,496 2,291 1,299

District 5 5,042 4,831 977 208

District 6 1,260 1,214 410 401

Total 31,054 28,626 7,460 3,796

Dec 2000 Map Verses New Map

MAP RESULTS

Parcels in Floodplain

Structures in Floodplain

MAP RESULTS

•1,549 structures were added to the floodplain due to:

− Changes in 100-year elevations− Better topography− The scale of maps

•Letter of Map Revision(LOMR)

• Structures built in compliance of FEMA

requirements at the

time of construction

maintain the same insurance benefits.

MAP RESULTS

GRANDFATHER CLAUSE

PRESENTATION OUTLINE

●Background

●Map Development

●Map Results

●FEMA Timeline

●Recommendations

●Action Item

FEMA TIMELINE

2.0Public

Meeting

Completed

3.0 BFE Appeal

Period (90 days)

4.0 Letter of

FinalDetermin-

ation

5.0 Compliance

Period

6.0FIRM Map

Effective Date

1.0 Preliminary

FIRM Map

Completed

1.0 Completed

2.0 Completed

3.0 BFE Appeal Period (90 days)– Sep to Nov 2008

4.0 Letter of Final Determination – Jan 2009

5.0 Compliance Period – Jan 2009 to Jul 2009

6.0 FIRM Map Effective Date – Jul 2009

PRESENTATION OUTLINE

●Background

●Map Development

●Map Results

●FEMA Timeline

●Recommendations

●Action Item

RECOMMENDATIONS

● Accept FEMA’s New Floodplain Maps

● Provide Public Outreach to citizens

● Evaluate the County’s floodplain ordinance

RECOMMENDATIONS

Public Information Program

●Post Card Notification

●Web Page−Program Background

−Eligibility for 25%

−LOMR Process

−Contact Information

for Questions

●Info Map

●Orange TV

PRESENTATION OUTLINE

●Background

●Map Development

●Map Results

●FEMA Timeline

●Recommendations

●Action Item

● Accept FEMA’s New Floodplain Maps

● Authorize Staff to Implement Public Information Program

● Authorize Staff to Evaluate the County’s floodplain ordinance

ACTION ITEM