Post on 29-Dec-2015
February 2009Summit Bridge Closure Report
Appoquinimink School District
October 14, 2008
2
October 14, 2008
3
October 14, 2008
4
Affect on Students “Number of Children Impacted”
• Cedar Lane ECC– (118 of 284 students)
• Alfred G. Waters MS– (418 of 777 students)
• Middletown HS (11th/12th Graders)– (211 of 1747 students)
• MHS Twilight Program– (11 students)
• Appoquinimink HS – (240 of 647 students)
October 14, 2008
5
Affect on Students “A Look at the Scope of the Problem”
• Cedar Lane ECC– (5 bus routes, 1 pre-school van route)– (2 midday routes)
• Alfred G. Waters MS– (10 bus routes and 1 special needs route)
• Middletown HS (11th/12th Graders)– (5 regular routes and 1 special needs route)
• MHS Twilight Program– (1 bus route)
• Appoquinimink HS – (5 regular routes and 1 special needs route)
October 14, 2008
6
Affect on Bus Routes“Average Route Time”
Current Feb 09• Cedar Lane ECC 25 min40 min*
• Alfred G. Waters MS 21 min41 min*
• Middletown HS 21 min40 min*
• MHS Twilight Program 67 min87 min*
• Appoquinimink HS 23 min43 min*
*does not include additional time for congestion
October 14, 2008
7
Affect on Bus Routes“Arrival/Departure Time Comparison”
Current Feb 09• Cedar Lane ECC (#80) 8:20a-9:10a 8:00a-9:10a
3:20p-4:13p 3:20p-4:33p
• Waters MS (#87) 6:30a-7:10a 6:10a-7:10a
2:18p-3:03p 2:18p-3:23p
• Middletown HS (#92) 6:20a-7:10a 6:05a-7:10a
2:45p-3:25p 2:45p-3:40p
• Appoquinimink HS (#84) 6:20a-7:10a 6:00a-7:10a
2:37p-3:18p 2:37p-3:38p
October 14, 2008
8
Affect on Bus Routes“Sample Bus Route”
Current Feb 09
Morning:
Waters MS 6:30a-7:10a 6:10a-7:10a
CLECC 8:30a-9:15a 8:10a-9:15a
Afternoon:
Waters MS 2:18p-3:05p 2:18p-3:25p*
*20 minute (CLECC)
CLECC 3:20p-4:10p 3:50p-5:00p
October 14, 2008
9
Options• Continue with current schedule
– Creating lost instruction time, communication, and safety issues
• Adjust pickup and drop-off time for affected routes/schools– Start routes 30 minutes early (AM)– 1 Hour early dismissal (PM) for 1st schedule schools– See objections above
• Adjust the bell timesFirst Schedule– 1-hour delay –affected buses time adjusted 90 minutes– 1-hour early dismissalSecond Schedule– 2-hour delay start– Normal dismissal time
--see objections above
• Closure– ECC: February 9-10 (2 days)– Elem: February 9-11 (3 days)– MS: February 9-11 (3 days)– HS: February 9-12 (4 days)
October 14, 2008
10
Option 4: Close Schools
Early Childhood Centers: Timeframe: February 9-10 (2 days)Kindergarten Registration/Parent Conferences on Feb. 11-12
Elementary Schools: Timeframe: February 9-11 (3 days)Parent Conferences on Feb. 12
Middle Schools: Timeframe: February 9-11 (3 days)Parent Conferences on Feb. 12
High Schools:Timeframe: February 9-12 (4 days)
October 14, 2008
11
Affect on the Student Calendar
–No additional days required.Our schedule includes instructional time over and above the state mandate to accommodate emergencies
–Our students will still be 60-70 hours over the state’s requirement
October 14, 2008
12
Affect on the Teacher Calendar(188-day requirement)
February 9-10: Professional Development
February 11-12: Teacher Conferences and Kindergarten Registration
February 13 (Friday): Staff Development
February 16 (Monday): Presidents Day