Post on 14-Feb-2022
Facilities Advisory Committee Recommendations
for 2014 Fall Requests
Presentation to the Administrative Council
March 3, 2015
Facilities Facts About Clayton State University
Fact Amount
Number of Buildings 24
Number of Acres 186
Number of Classrooms 56
Number of Labs 79
2
Aerial Map of Campus
You Are Here
3
Clayton State UniversityMaster Plan Summary
4
Committee Members
Harun Biswas (Chair)
Jonathan Conner
Myisha Garnes
Nick Kilburg
Bridgette McDonald
Mike Mead
Dennis Miller
Michael Ozment
Scott Stegall
Shannon Thomas
Darren Thomas
Priti Bhatia
Svetlana Soroka
5
Mission
Create a consistent process for the submissions and
review of requests for new or modified workspace
allocations.
Ensure that all requests are reviewed fairly and
objectively.
Attempt to balance the needs of each department
consistent with institutional requirements, priorities, and
the Space Utilization report.
6
Review and Approval Process
1. Facilities Modification and Space Allocation Form – requiring
approvals through Vice President level.
2. PowerPoint presentations to the committee may be required
(format available on the Z: drive).
3. Committee deliberations and recommendations to Vice
President of Business and Operations.
4. Submittal to President’s Cabinet for final approval or
changes.
7
Department Request Requestor
Counselling Psychological Services
Expand waiting area, add counselor office and storage room.
Christine Smith
Public Safety Build out interview room, training room, office and storage room.
Bobby Hamil
IT Install cage or modular wall with a wall to enhance security in L163.
Shannon Thomas
Testing Center Space for large lockers for students. Sharon Long
Continuing Education Cosmetic upgrade of interior at Lucy Huie Hall.
Barton Bond
Fall 2014 9 Requests Submitted
8
Department Request Requestor
Media and Printing Restore lost square footage and centralize all satellite storage at one location.
Paul Bailey
Athletics Convert part of the storage room into concession shop.
Tim Duncan
Auxiliary Services Expand existing service counter and product prep area at Jazzman’s.
Norman Grizzell
Auxiliary Services Reconfigure salad bar into demonstration area and install mobile salad bar.
Norman Grizzell
Fall 20149 Requests Submitted
9
Build out additional rooms for CAPSCAPS
Requested: Recommended:
Expand waiting area, add counselor office and storage room.
Option I - relocate Public Safety storage room from 295A to new built out area for Public Safety (former UHS remainded space) and build a new wall to extend into work room 295.
Option I
10
Build out additional rooms for CAPSCAPS
Requested: Recommended:
Expand waiting area, add counselor office and storage room.
Option II - relocate Public Safety storage room from 295A to new built out area for Public Safety (former UHS remainded space), enclose lobby area to create a conference room, build one office and storage room out of existing conference room.
Option II
11
Build out additional rooms for Public SafetyPublic Safety
Requested: Recommended:
Build out interview room, training room, office and storage room.
Rooms 295A and 210 have to be vacated and relocated into a newly built out space (remainder from UHS).
Current layout
New layoutExisting layout
12
Enhance security in L-163Information Technology
Requested: Recommended:
Install cage or modular wall with a door to enhance security in L163.
This is a necessary measure for inventory security. Committee recommends approval of the project.
13
Space for large lockers in Arbor HallTesting Center
Requested:
Room for large lockers for students while taking tests in Arbor Hall.
Recommended to use room 101 next to auditorium 102.
Recommended:
14
Cosmetic upgrade for Lucy Huie HallContinuing Education
Requested: Recommended:
Cosmetic upgrade of interior at Lucy Huie Hall (classrooms, hallways, restrooms and additional lighting for classrooms).
Committee recommends approval of cosmetic renovation of classrooms and hallway. Need to address moisture intrusion to the floor prior to renovation.
15
Centralize Storage and Operations for Media PrintingMedia Printing
Requested: Recommended:
Restore lost square footage and centralize all satellite storage at one location.
Relocate existing occupants to new locations in order to accommodate requested space. Request is contingent on New Science Building completion and relocation of faculty and staff.
16
Concession ShopAthletics Center
Requested: Recommended:
Convert part of the storage room in Athletics Center into concession shop.
Committee recommends approval.
17
Jazzman’s Café expansion of service areaAuxiliary Services
Requested: Recommended:
Expand existing service counter and product prep area at Jazzman’s.
Committee recommends approval and contacting design Professional for new layout.
18
Dining Services salad bar reconfigurationAuxiliary Services
Requested: Recommended:
Remove existing salad bar and millwork and reconfigure demonstration area and install mobile salad bar. Create more enclosed storage.
Committee recommends feasibility performed for the request prior to approval.
19
Statistics on Submitted Requests
Overall 99 requests submitted between 2010 – Fall 2014.
9 requests submitted Fall 2014.
73 requests completed.
21 in progress or awaiting funds.
2 requests withdrawn by requestors.
For more detailed overview of 2010 – 2013 requests please visit:
http://www.clayton.edu/facilities/planningdesign/facilitiescommittee
20
Current Projects
21
Projects CompletedLibrary Lower Level
22
Projects CompletedArts & Sciences Mechanical System Upgrade (upper level)Replacement
23
Projects CompletedLoch’s Nest
24
Other ProjectsNSB
25
Next Steps & Questions
Submit any comments via e-mail
to AVP Biswas
by March 9, 2015.