The Community of North Shore (Incorporated 1974) was struggling to deal with reports of growing water quality problems in the Stanhope Peninsula area caused by coliform and e-coli bacteria and salt water intrusion. There were many residents who believed that a central water system was urgently needed. However, there were at least as many who believed the problems to be few and far between.
The Stanhope Peninsula had been the subject of previous engineering studies by others. However, in 2009, North Shore Council decided that a more comprehensive study of the water and wastewater needs of the whole community was required.
Following a competitive RFP process, Engineering Technologies Canada Ltd. (ETC) was awarded the contract to conduct a Long -Term Water and Wastewater Servicing Study.
2011 FCM Sustainable Community Award of Excellence
www.engtech.ca
EngineeringTechnologiesCanada Ltd.
�•�Innovative�Wastewater�Management•�Environmental�Engineering•�Soils�and�Site�Evaluations� Toll�free�1-888-747-7645������www.engtech.ca
2009 Engineers PEI Award for Engineering Achievement
Public Consultation KeyETC prepared a Community Profile, which provides background information on existing conditions relevant to the goal of developing a sustainable and cost effective plan for water and wastewater management within the Com-munity. Public consultation and involvement was key throughout the process. Early on, ETC conducted a survey of all residents and property owners to gather information on individual septic systems and wells.
Comprehensive Water and Wastewater Needs AssessmentETC collected, combined and analyzed data sets from North Shore, PEI Geo-graphic Information Services, Septic permits and the PEI Dept. of Provincial Treasury (Property Records Division) among many others to create a compre-hensive database for the subsequent needs assessments.Queries were performed with GIS software using established “needs criteria” developed by ETC. A lot-by-lot analysis was carried out to identify which lots would be sustainable in the long-term with conventional septic systems and which lots were expected to be sustainable with an above-ground septic field, or advanced, on-site treatment system. The analysis also determined which lots would likely require an eventual, off-site (ie. central) sewer solution. Only once the identified water and wastewater needs were accepted by Council and residents, was an analysis of options and solutions undertaken. ETC and its team carried out a technical, regulatory and cost-effectiveness analysis of various conventional and innovative/alternative options.
ETC’s Conclusions and Recommendations�•��There�are�a�very�small�number�of�unresolved�well�and�septic�problems.�
Therefore, a central water or sewer system is not warranted at the present time.•��On-going�monitoring�of�new�development,�and�well�and�septic�problems�is�
recommended to be able to predict when the Community is close to a “tip-ping point” requiring central servicing.
•��Institute�a�Septic�System�Management�Program�to�improve�the�performance�and longevity of septic systems within the Community.
Client Testimonial“ETC successfully delivered the study needed to serve as the framework for the future of this municipality... it is without hesitation, I recommend ETC to other municipalities who are considering undergoing a water and wastewater servicing study”
Sandy�Gallant,�Chairperson,�Community�of�North�Shore
ETC�ProjECT�ProfIlELoNg-TERM WATER ANd WASTEWATER SERvICINg STudyC L I E N T : C o M M u N I T y o F N o R T h S h o R E , P E
BAYSHORE ROAD
STANHOPE BAY ANDBEACH RESORT
PORTAUTHORITY
PEINATIONAL
PARK
STANHOPE GOLFAND
COUNTRY CLUB
COVEHEADBAY
LEGEND
ETC Buildings Layer
(Adapted from PEI Buildings 2003)
Property Lines
Rivers and Streams (PEI GIS Resources, 2008)
2m Contours (PEI GIS Resources, 2008)
ETC Subarea Boundary
North Shore Municipal Limits
Non-Residential Use
Properties Requiring Off-site Sewer Solutions
Due to Lot Size and/or Soil Constraints
Due to Ground Water ConstraintsDue to Wetland and Watercourse Constraints
Properties Accommodating On-site SolutionsAdvanced (I/A) Treatment System
Above Ground Dispersal Field
No Solution RequiredViable with Existing or Future Septics
STANHOPE PENINSULA SUBAREAWASTEWATER NEEDS ASSESSMENT RESULTS
COMMUNITY OF NORTH SHORELONG-TERM WATER AND WASTEWATER
SERVICING STUDY
N
S
W E
0 250 m
CHELSEYBY-THE-SEABY THE BAY
COTTAGES
GULF SHORE PARKWAY
FIVE RENTALCOTTAGE
DEVELOPMENTS
STA
NH
OP
E LA
NE
TWO RENTALCOTTAGE
DEVELOPMENTS
Using Category II (PEI Soil Survey)
�
�
�
��
�
�
�
���
�
�
�
�
�
�
�
��
�
��
�
�
�
�
�
�
��
�
�
�
�
�
��
�
�
�
�
�
�
�
�
�
�
���
���
�
��
�
�
��
�
�
�
��
�
��
�
�
�
�
�
�
�
�
�
�
�
��
�
�
�
�
�
�
���
�
�
�
��
��
�
�
��
�
�
�
�
�
� ��
�
�
N
S
W E
0 1000 m
GULF OFST. LAWRENCE
COVEHEADBAY
LEGEND
� Properties with Site Specific
Septic Permit Lot Categorization (112)
Category I Soils
Category II Soils
Category III Soils
Category V
Environmentally or Otherwise Constrained Areas
Rivers and Watercourses (2008)Wetlands
North Shore Community Limits
SOIL CATEGORYMAPPING
COMMUNITY OF NORTH SHORELONG-TERM WATER AND
WASTEWATER SERVICING STUDY
CATEGORY II
CATEGORY I
File # 09100 G3-04-101 November 3, 2009ADAPTED FROM THE PEI SOIL SURVEY 1988
BRACKLEYBAY
Soil Catergory Mapping�-�Community�of�North�Shore
Stanhope Peninsula Subarea�-�Wastewater�Needs�Assessment�results