Essex County Transportation Services Department

Essex County Highways

2012 Construction Program

Peter Bziuk P. Eng.

Manager Construction Services

Essex County Highways

• 2012 Construction Program Highlights– $14,200,000 expenditure level– Includes approx. $1,100,000 from 2011– Rehabilitation Program– Capacity Improvement Program

Rehabilitation Program

• 25 Planned Projects– 5 Bridges ( 2 Engineering, 3 Construction )– 11 Roads– 5 Maintenance– 4 Culverts ( 2 Engineering, 2 Construction )

Capacity Improvement Program

• County is continuing a multi year capacity improvement program for the network

• County funding is being utilized, Senior level funding is being pursued

• 7 Planned Projects for 2012– 5 Construction, 2 Engineering

Essex County Highways

• Bridge Projects ($2,970,000)– 3 Structure Rehabilitations

• CR 22 @ Duck Creek• CR 10 @ Long Marsh Drain• CR 14 @ Collard Drain

– 1 Structure Rehab / Expansion:• CR 22 @ Puce River

– 2 Pre-engineering for 2013 construction:• CR 14 @ Silver Creek• CR 42 @ Moisson Creek

Essex County Highways

• Culvert / Drainage ( $1,182,000 )– CR 14 @ Maddox Drain culvert replacement

– CR 19 @ East Townline Drain improvements

– CR 34 – Drain Improvement – Kingsville

– 2 – Culvert Engineering projects for 2012

• CR 43 @ Gzowski Drain

• CR 50 @ Beaudoin Drain

Essex County Highways

• Road Projects ($4,940,000)– Recycling/Resurfacing:

• CR 19 Tecumseh/Lakeshore – 2.8 km

• CR 12 Essex – 3.0 km

• CR 20 LaSalle – 3.0 km

• CR 19 Lakeshore – 0.5 km

• CR 18 Kingsville – 1.1 km

• CR 34 Leamington – 5.9 km

• CR 8 Lakeshore/Essex – 2.2 km

• CR 8 Essex – 1.2 km

• CR 3 LaSalle – 1.7 km

• CR 10 Amherstburg – 4.1 km

Essex County Highways• Pavement Preservation ( $250,000 )

– Route and Seal – various locations– Surface Treatment – various locations - 12 km

• Bridge Preservation– 4 deck/expansion joint repairs– Various guiderail repairs / upgrades

• Estimated Quantities– 39,740 tonnes of Hot Mix Asphalt– 99,200 sm. of Pavement Recycling– 17,550 tonnes of Granular A

Essex County Highways

• Capacity Projects ( $3,200,000 )– CR 23/46 – Intersection Improvements – LS– CR 22 Phase 5 - Contract A – LS– CR 19/22 Improvements - Engineering– Various Connecting Link projects with Towns

• CR 19 - Tecumseh

• CR 6 – LaSalle

• CR 20 - Amherstburg

Essex County Highways

• EA’s / Engineering:– CR 19 / CR 22 with MTO Prelim. Design

($200M)– CR 22 – CR 2 to Puce Detailed Design

($18.5M)– CR 42 EA – CoW to CR 25 ($30M)– Lauzon Parkway Extension – MTO/CoW /CoE– Active Transportation Study ($52M)

• Adoption and implementation

Essex County Highways

• Thank you for your interest,

• Thank you for your support in delivering our annual programs,

• Looking forward to another successful construction season.