ES-D&M,DEP-C1-0-4.doc

Post on 15-Dec-2015

217 views 0 download

Transcript of ES-D&M,DEP-C1-0-4.doc

TITLE:

CONCEPT DESIGN AND REVIEW BOARD (DEP & DM &E PROJECTS) MARKING SCHEME FOR UGC/MESMC & WESMC

Procedure No. ES/D&M,DEP/C1/0/4Issue No. 2 Date 05 Mar 03Revision No. DatePage No. 1 of 1Prepared by: DESAuthorized by: Commandant

Project Title:Project Members: Board Members: Dean (Chairman)

Project Advisor / Supervisor One Faculty Member

TOPIC PROJECT ACTIVITY TOTAL MARKS

MARKS AWARDED

Project Advisor GROUP EFFORT Management

Working as TeamMotivationApplication

15Board Members DESIGN PROCESSPLANNING

RESEARCHClarification

SOR

Concepts Initial concept

Design

Project Risk

Cost

Evaluation.

REPORT

Does the project plan fully identify time scales &supporting activities?

Has the group identified the problem?

Have the parameters been adequately specified?

Have sufficient ideas been generated?

Have the drawings been made. (Reference to concept)

Are the designs feasible?

Has Project risk assessment been undertaken?

Have approximate costs been evaluated?

Has the chosen solution been evaluated & compared with the others?Format. (i.a.w JSP101) Spelling.Clear and constructed in a logical & systematic manner?

25

PRESENTATION ContentsManner of DeliveryVisual Aids.Response to questions. 10

Grand Total 50

Name _______________ Signature_________________