Issued by:
Special Officer & Director of Ports
Kerala Maritime Society
4th
& 5th
floorDirectorate of Ports
New Corporation Building
Palayam
Thiruvananthapuram-33
Consultant:
M/s. Ajit Associates
IIIrd floor, Puthuran PlazaKPCC Junction, M.G.Road
Kochi
Phone: 0484-4072000, Fax: 0484-4032517
8/19/2019 Document 5 Technical Specifications for HVAC
2/71
Technical Specification for HVAC Page 2 of 71
1.0 /
F (F / ) ,
, ,
.
32 .
. E C
D / D , 10% 100%
P . I C C
.E
. I
.
.
I BM C /
PC.
. C
5 D. C 43 D. C. DB,
10 D. C 15 D. C DB. I
/ I C, ( )
.
M
, .
16
. C
.
, F , ,
. ,A , , , ,
, , . .
A O 415 +/ 10%, 50 H, 3 P, 4
AC 230 , 50H P .
/ C / . O
0 C 50 C.
8/19/2019 Document 5 Technical Specifications for HVAC
3/71
Technical Specification for HVAC Page 3 of 71
50 BA 1M .
AI 575.
,
.
M .
.
.
M C,
C I .
.
O .
.
O
C C.
1.1
C :
C A .
.
C 400 .
C . P
/
. , ,
, IP 55 P.
A . E ,
. "A C" (B F) A C C
F (25) .
.
B , ,
.
,
M M M. O "D
L" . I &
, .
E E . C , /
& .
G H JAEG 97021995. H H E L
P D 5%.
8/19/2019 Document 5 Technical Specifications for HVAC
4/71
Technical Specification for HVAC Page 4 of 71
1.2
• High pressure switch
• Low pressure switch
• Fan motor safety thermostat
• Fan driver overload protector
• Over current relay
• Inverter Overload Protector
• Fusible Plug
• Crank case heater
• Fuses
• Over current protector
• Unit shall be supplied with
•
Installation manual
• Operation Manual
• Connection Pipes
• Clamps
1.3
C .
.
.
.
. . I
. GI, .
8/19/2019 Document 5 Technical Specifications for HVAC
5/71
Technical Specification for HVAC Page 5 of 71
1.4 ( )
& .
288 . ,
750 . G P. , P .
42 B (A), 1.5
. &
(288 ).
.
N M . ,
& . &
, / "B ".
O M I M P
D / C / / / C/ /
/ I .
1.5 : ( )
L C I PC
. E D C , , ,
, , 20 HDPE . .
1.6
E M C. M A C F
P . M
C, C, F,
. M P ,
. .
P C E E
0.5 C PID A.
I , . A
D F . P
.
C FL .
I . C
. ON / OFF , ,
C, , .
8/19/2019 Document 5 Technical Specifications for HVAC
6/71
Technical Specification for HVAC Page 6 of 71
1.7 /
C .
, .
1 D C . 72
&
& / .
& " "
. I
500 M.
1.8
C "B Q". C C
O / OFF , M
. I C BM .
.
F
C M 64 G (128 )
M
A
I 1000C C F D .
1.9
The Entire Condensing unit and Evaporating unit should be Factory assembled and tested .The units
should come with an initial charge of refrigerant R410A or eco-friendly gas from the factory.
Refrigerant Piping Distance Limits
To be capable of refrigerant piping runs up to 150m between the condensing unit and fan coil units with
50m level differences without any oil traps or double risers. The Oil Equalizing line should be inside the
Condensing unit, to avoid ‘inverted’ oil traps at site. The level difference between fan coil units
connected to the same refrigerant circuit can be extended to 15m.
8/19/2019 Document 5 Technical Specifications for HVAC
7/71
Technical Specification for HVAC Page 7 of 71
1.10
The Indoor units shall be Hi-Wall / Cassette / Ducted type as per the aesthetic requirements of the client.
All indoor units should be provided with Cordless Remote controllers for ease of operation.
Minimum static required for IDUS:
HI-static-14mm-19mm
Medium static-5-7mm
Lowstatic-5mm
Electronic Expansion Valve:
Each indoor unit should be fitted with a pre filter, electronic expansion valve, which controls the
refrigerant flow in response to the load variations in the room. The electronic expansion valve is to be
controlled via a computerized control sensing the return air temperature, refrigerant inlet and outlet
temperatures. During the cooling operation the electronic expansion valve controls the refrigerant
superheat degree at the evaporator.
Direct driven of the DIDW multi-blade type, statically and dynamically balanced to ensure low noise and
vibration free operation.
To be direct expansion, constructed from copper tubes expanded into aluminium fins to form a
mechanical bond.
The indoor units should be provided with auto swing of the supply air louvers for cassette and under
ceiling type fan coil units. The louvers should be capable of providing continuous swing operation or to
be fixed in any direction required.
Include in the fan coil unit a printed circuit board complete with, address switches for a variety of
operation controls, emergency operation switch and fault/operation indication LED’s. Thermally protect
fan motors.
The fan coil unit casing (ceiling mounted units) to be fully insulated and sealed to prevent condensation.
8/19/2019 Document 5 Technical Specifications for HVAC
8/71
Technical Specification for HVAC Page 8 of 71
1.11 :
The Drain connection of each Fan coil unit to the main Header should be of 25mm Dia. The Header Pipe
should be of 40mm Dia. The Drain Pipe should be of Hard PVC, whereas the connection of the Fan coil
unit to the Hard PVC Pipe should be with flexible braided pipe. The Drain piping should be insulatedwith 13 mm thick tubular Nitrile Rubber Electrometric insulation.
1.12 :In case of individual and group control, set the addresses of each fan coil unit to minimize commissioning
time. In case of centralized control, set the addresses by the remote controller.
1.13
To be fully weatherproofed, factory assembled and pre-wired with all necessary electronic and refrigerant
controls. Construct the casing from mild steel panels coated with a baked enamel finish. Provide thecondenser coil fins with a corrosion resistant finish.
Larger Condensing Units: Incorporate 2 compressors in condensing units above 5HP with at least one
Rotary inverter / Inverter scroll type. The condensing unit preferably shall be of 3Rows condenser coils
for higher capacities.
Modular design: Allow for side-by-side installation, by the modular design of the condensing units.
Fan Motor Speed Control: The condensing unit fan motors to have at least two-speed operation to
maintain constant head pressure control in all ambient temperatures and modes of operation. The
condenser fan louvers shall be of self adjusting type for smooth air flow.
1.14
Provide highly efficient inverter rotary / inverter scroll type compressors with electronic controls, capable
of loading and unloading to follow the variations on cooling or heating loads, using the latest axial
compliant sealing technology. The microprocessor panel should incorporate control for precise
monitoring of status of the system. The system should not with electromagnetic interference & conversion
losses. Suitable resonance filters shall be incorporated to prevent electromagnetic interferences &
conversion loses. Each module should have variable speed compressors to ensure precise operation at
lower loads.
1.15
Construct the heat exchanger from seamless copper tubes mechanically bonded to aluminium fins to form
a cross fin coil. Treat the aluminium fins with an anti-corrosion film.
8/19/2019 Document 5 Technical Specifications for HVAC
9/71
Technical Specification for HVAC Page 9 of 71
1.16
Complete the refrigeration circuit of the condensing unit with refrigeration compressors, motors, fans,
condenser coils, electronic expansion valve, sight glass, solenoid valves, 4 way valve, distribution
headers, capillaries, filters, shut down valves, service ports, receivers and accumulators and all othercomponents which are essential for safe and satisfactory operation. The unit should have arrangement for
adjusting the condenser area as per indoor load requirement.
1.17 Equip the unit with an oil recovery system to ensure stable operation for systems with long refrigerant
piping. Operate the oil recovery system after the first hour of operation and then every consecutive 4
hours of operation. Also fit high efficiency oil separators to the discharge side of the compressor together
with factory fitted oil equalization system.
1.18 Fit the condensing unit printed circuit board (PCB) with selection switches, emergency operation
switches and service mode switches, together with LED indications for operation / fault indication.
1.19 Use computerized control to maintain a correct form of temperature. For the fan coil units incorporate an
on/off switch, fan speed selector, thermostat setting and liquid crystal display which indicates temperature
setting; operational mode, malfunction codes etc.
Fan coil control:
Accomplish by the use of individual controllers for each fan coil unit.
Fault Diagnosis:
Equip the system with a diagnostic function for quick and easy maintenance and service.
1.20
i) Product Data: Submit manufacturer's technical data for air distribution equipment, including capacity
ratings, fan performance curves with operating point clearly indicated, gages and finishes of
materials, dimensions, weights, furnished accessories, and installation and instructions.
ii) Wiring Diagrams: Submit the manufacturer's electrical requirements for power supply wiring to theunits.
iii) Operation and Maintenance Data: Submit maintenance and lubrication instructions, motor and drive
replacement instructions, and spare parts list for each unit.
8/19/2019 Document 5 Technical Specifications for HVAC
10/71
Technical Specification for HVAC Page 10 of 71
1.21 ,
A.Transportation, handling and storage of materials shall be in accordance with manufacturer's
recommendations regarding transportation, handling and storage of materials.
B. Deliver materials to the site in manufacturer's original factory wrappings and containers, clearly
labeled for identification of manufacturer, brand name and contents. Store materials off ground in
original undamaged packages and containers, inside well-ventilated area protected from weather,
moisture, soiling, extreme temperatures, and humidity. Follow manufacturer's instructions regarding
transportation, handling and storage of materials.
1.22 Materials shall be provided of standard products of specialist manufacturers who have long experience
of manufacturing and installing control equipment specified in this section. The system shall be
installed by competent personnel, regularly employed by the Controls manufacturer with full
responsibility for proper operation of the Controls including debugging and proper calibration ofeach component in the entire system. Supplier shall have in-place support facility within 30 km of
the site with technical staff, spare parts inventory and all necessary test and diagnostic equipment.
Submit a written guarantee signed by manufacturer, contractor, and installer agreeing to replace
partitions which fail in material or workmanship within a period of 2 year from the date of substantial
handing over.
1.23 Upon completion of all work and all tests, the Suppliers shall furnish necessary operators, labor and
helpers for operating the entire installation for a period of fifteen (15) working days of twelve (12) hours
each, to enable the Owner’s staff to get acquainted with the operation of the system. During this period,
the contractor shall train the Owner’s personnel in the operation, adjustment and maintenance of all
equipment installed
1.24 2
CO2 A
F F & A. A
, , , , . P
' '
.
1.25
M, A Q
. M ; D .
, D . D
,
8/19/2019 Document 5 Technical Specifications for HVAC
11/71
Technical Specification for HVAC Page 11 of 71
AB . A B
J B, M. A
, M. J B
.
M C D O PD, 5.7 , C,
320 240 LCD, , .
O AD, , 4 20 LCD .
M K,
. P L , L , A
L, B L G*, A *, H* *
. 256 MB AM, M P, F M,
L B *, B 010, O NO D C
24 AC/DC 3 A, , C D L, 2.0
B, 232, E L , PC, N*. A
, .
I , M,
25 (8M) . I , ,
(25 8 M) M D. LCD . C8D. P 12 (AC/DC) 3A, A 110/12 (220/12)
. M L
C . F ,
24 3 M .
, , , , . A
M OH (
H ).
8/19/2019 Document 5 Technical Specifications for HVAC
12/71
Technical Specification for HVAC Page 12 of 71
TECHNICAL SPECIFICATION FOR HVAC
CONSTRUCTION OF MARITIME SOCIETY AT NEENDAKARA,
KOLLAM
1 SCOPE
The scope of this section comprises the supply of VRF units and associated works conforming to
these specifications and in accordance with the Schedule of Quantities and detailed BOQ.
LIST OF BUREAU OF INDIAN STANDARDS CODES
IS: 277-1992 galvanized steel sheet (Plain & Corrugated wire for fencing.
IS: 554 – 1985 (Reaffirmed 1996) Dimensions for pipe threads where pressure tight joints are
required on the threads.
IS: 655-1963 (Reaffirmed 1991) Metal air ducts
IS: 659-1964 (Reaffirmed 1991) Air Conditioning (Safety Code)
IS: 660-1963 (Reaffirmed 1991) Mechanical Refrigeration (Safety Code)
IS: 732-1989 Code of practice for electrical wiring
IS: 1239 (Part – I) – 1990 Mild steel tube
IS: 1239 (Part –II) – 1992 Mild steel Tubular and other wrought steel pipe fittings
IS: 1255-1983 Code of Practice for installation and maintenance of Power Cables up to and
including 33KV rating (Second Revision)
IS : 1554 – 1988 (Part – I) PVC insulated (Heavy Duty) electric cables for working voltages up to
and including 1100 volts
IS: 2379 – 1990 Colour code for the identification of pipelines.
IS: 2551 – 1982 Danger notice plate
IS: 3043 – 1987 Code of practice for earthing
IS: 3103 – 1975 (Reaffirmed 1999) Code of practice for Industrial Ventilation
IS: 3837 – 1976 (Reaffirmed 1990) Accessories for rigid steel conduit for electrical wiring
IS: 4736-1986 (Reaffirmed 1998) Hot-dip zinc coatings on steel tubes
8/19/2019 Document 5 Technical Specifications for HVAC
13/71
Technical Specification for HVAC Page 13 of 71
IS: 4894 – 1987 Centrifugal Fan.
IS: 5133-1969 (Part-I) (Reaffirmed 1990) Boxes for the enclosure of electrical accessories.
IS: 5312 (Part–I)–1984 (Reaffirmed 1990) Swing-check type reflux non return valves for water
works
IS: 5424-1989 (Reaffirmed 1994) Rubber mats for electrical purposes.
IS: 5578 & 11353-1985 Marking and identification of conductors
IS: 6392-1971 (Reaffirmed 1988) Steel pipe flanges.
IS: 13947-1993 (Part – V) Control Circuit Devices
BS: EN: 779-1993 Filters
ASHRAE Hand Books American Society of Heating
Refrigeration & Air conditioning
ASHRAE Indoor air quality Standard 62-1982
Submittals
i) Product Data: Submit manufacturer's technical data for air distribution equipment, including capacity
ratings, fan performance curves with operating point clearly indicated, gages and finishes of
materials, dimensions, weights, furnished accessories, and installation and instructions.
ii) Wiring Diagrams: Submit the manufacturer's electrical requirements for power supply wiring to the
units.
iii) Operation and Maintenance Data: Submit maintenance and lubrication instructions, motor and drive
replacement instructions, and spare parts list for each unit.
Transportation, Handling and Storage
A.Transportation, handling and storage of materials shall be in accordance with manufacturer's
recommendations regarding transportation, handling and storage of materials.
B. Deliver materials to the site in manufacturer's original factory wrappings and containers, clearly
labeled for identification of manufacturer, brand name and contents. Store materials off ground in
original undamaged packages and containers, inside well-ventilated area protected from weather,
moisture, soiling, extreme temperatures, and humidity. Follow manufacturer's instructions regarding
transportation, handling and storage of materials.
8/19/2019 Document 5 Technical Specifications for HVAC
14/71
Technical Specification for HVAC Page 14 of 71
C. The material should not damage before doing the commissioning and handing over and any damage
will lead to the replacement of the same.
Warranty
Materials shall be provided of standard products of specialist manufacturers who have long experience of
manufacturing and installing control equipment specified in this section. The system shall be installed by
competent personnel, regularly employed by the Controls manufacturer with full responsibility for proper
operation of the Controls including debugging and proper calibration of each component in the entire
system. Supplier shall have in-place support facility within 30 km of the site with technical staff, spare
parts inventory and all necessary test and diagnostic equipment. Submit a written guarantee signed by
manufacturer, contractor, and installer agreeing to replace partitions which fail in material or workmanship
within a period of 2 year from the date of substantial handing over.
On site training
Upon completion of all work and all tests, the Suppliers shall furnish necessary operators, labor and
helpers for operating the entire installation for a period of fifteen (15) working days of twelve (12) hourseach, to enable the Owner’s staff to get acquainted with the operation of the system. During this period,
the contractor shall train the Owner’s personnel in the operation, adjustment and maintenance of all
equipment installed
2 Design Conditions and Criteria
2.1 General
The Engineering Services for this project shall be installed in accordance with this specification
and the tender drawings.
2.2 Environmental Conditions
The mechanical installations within the building shall be designed to maintain the internal
conditions detailed below with a range of external conditions varying as per the Kerala climate.
All selected equipment shall be suitable for installation in coastal locations and shall have a
minimum life expectancy of 50 years. All services and equipment shall be designed to operate in
the ambient temperature.
Internal Conditions:
Summer ºC db – 23, Max RH – 60, NC - 30Winter ºC db – 21, Min RH – 50, NC - 30
3. Mechanical Engineering Specification (Material, Equipment andWorkmanship)
8/19/2019 Document 5 Technical Specifications for HVAC
15/71
Technical Specification for HVAC Page 15 of 71
3.1 Standards & Methods of Fixing
3.1.1 Generally
Materials, products and systems shall comply with the following:
This Specification;
1 Government Rules;2 EEC Regulations and Directives;3 Local Authority's Byelaws and Regulations;
4 Water Supply Authority's requirements;5 Model Water Byelaws;6 Electricity Supply Authority's requirements;7 Gas Supply Authority's requirements;
8 Building Control Officer's requirements;9 Fire Prevention Officer's requirements;10 Any other Special Licensing Authority's requirements;11 Appropriate British Standard Specification and Codes of Practice;
12 IEE Regulations for Electrical Installations 16th Edition;13 The Electricity at Work Regulations (1989).14 The Health & Safety at Work Regulations (1992).
15 The Fire Precautions (Places of Work) Regulations (1992).16 Appropriate Health & Safety Executive Guidance Notes;17 Ministry of Housing, Electricity and Water (MHEW)18 Loss Prevention Council (FOC) Rules 29th Edition;
19 CIBSE Guides and associated technical documents;20 American Society of Heating, Refrigerating and Air conditioning(ASHRAE)
21 Plumbing Engineering Services Design Guide (PESDG)22 Any other relevant document or regulation;
Revisions or alterations to the above standards and regulations that are published during theinstallation of the work shall be brought to the attention of the approval authority. Theappropriate instruction may then be issued.
All costs associated with charges made by any authority approving any part of the Contract
Works shall be included.
3.1.2 Suitability of Materials and Products
Materials and products shall be supplied to suit the temperatures and other condition normally
expected to apply during transit, storage and installation periods and after the installation is
completed, and also to withstand any test specified herein or in any document referred to herein.
Materials and products shall not support bacterial life and be proof against attack by insects and
vermin. Animal hair must not be used in acoustic or sound deadening materials.
8/19/2019 Document 5 Technical Specifications for HVAC
16/71
Technical Specification for HVAC Page 16 of 71
3.1.3 Standardisation
Equipment shall be standardised throughout the installation where possible.
3.1.4 Labels
All identification labels, duty labels, instruction and safety labels for electrical equipment and cables
shall be in English and other languages where specified.
3.1.5 Electrical Interference
All equipment offered for use anywhere on the project shall comply with BS EN 55014:1993
3.1.6 Minimum LP Rating Yet to be drafted.
3.1.7 Methods of Fixing
General
The size of bolt or screw used must be the largest permitted by the diameter of the hole in theequipment to be fixed.
All bolt or screw holes provided in equipment shall be used and each fixing must be secure.
All screws and bolts shall be sheradised. For fixing in block and concrete, holes of correct size
for screws or bolts shall be neatly drilled with tungsten carbide tipped twist drills to a depth
(excluding plaster thickness) equal to the length of plug to be used. The plug length must be
correct for the screw. Fixings shall not be made between joints in block work.
Unless otherwise specified all fixing screws in block work and concrete shall be 38mm long.
Conduit boxes shall be fixed by two roundhead screws. Countersunk screws shall only be used
where countersunk holes are provided, otherwise the wood screws shall be roundhead and set
screws shall be cheese head. Where holes have to be drilled for fixing, No 10 wood screws shall
be the minimum size used.
3.1.8 Lightweight and Heavyweight
Dependent upon size of fixing holes provided in the equipment, all fixings in block work and
concrete shall be by woodscrews and suitable plugs or mild steel bolts of the grouted type or by
one of the various type of expanding raw bolts. Fixing to timber shall be by means of
woodscrews or coach screws.
3.1.9 Fixing of Metalwork
Fixings to light gauge metal inaccessible at the back shall be by means of shake proof self
8/19/2019 Document 5 Technical Specifications for HVAC
17/71
Technical Specification for HVAC Page 17 of 71
tapping screws or raw plug spring or gravity toggles. Fixings to supporting metalwork shall
generally be made via proprietary fixings with clamp connections. Drilling of metalwork shall
be avoided wherever possible and shall only be carried out following approval. No fixings shall
be made to structural steelwork without approval.
4.1 Pipe work Installations
4.1.1 Standards
The pipe work installations shall conform to the following British Standard Specifications:
BS EN 12540:2000
Electroplated coatings of nickel and chromium.
BS 1710: 1984
Identification of pipelines and services.
BS 5306
Fire extinguishing installations and equipment on premises.
BS 6700 : 1997 BS EN 8062:2005
Design, installation, testing and maintenance of services supplying water for domestic use within
buildings and their cartilages.
4.1.2 General
The pipe work installations shall follow the detail set out on the tender drawings making due
allowance for the diagrammatic nature of the drawings and taking account of their requirements
of this specification. Pipe runs shall be installed in accordance with best accepted practice and
shall be arranged to present a neat appearance and shall be parallel with each other and with the
building structure except where falls are required to facilitate draining or venting.
4.1.3 Spacing of Pipes
Pipes shall be spaced, in relation to one another and to the building structure, to allow for the
required thickness of thermal insulation as specified elsewhere. The combined insulation of two
or more pipes in one composite casing will in no case be permitted.
4.1.4 Sleeves and Plates
8/19/2019 Document 5 Technical Specifications for HVAC
18/71
Technical Specification for HVAC Page 18 of 71
Where pipes pass through elements of the building structure, i.e. walls, floors, partitions, false
ceilings etc, they shall in all cases be enclosed concentrically within purpose made sleeves cut
from pipe of the same material one or two sizes larger as may be required to provide reasonable
clearance. Such sleeves shall be cut square at the ends, clean and flush with the finished wall
surfaces and extending 6mm above and below floor and ceiling surfaces. Sleeves shall in nocase be used as pipe supports, a free annular space being always provided for. The annular space
is to be packed with approved mineral fibre where it is necessary to maintain a fire stop.
Where pipes and tubes pass through the finishes of walls, floors, ceilings, partitions and false
ceilings of occupied rooms, they shall be fitted with a heavy chromium plated gunmetal masking
plate. Such plates shall be split on the diameter, be a snug fit to the pipe concerned and be
provided with counter sunk holes for wood screws. The fixing of such plates shall include
drilling and plugging to the wall and finally screwing on with substantial wood screws having
chromium plated raised counter sunk heads. Pipe joints shall not be made within the thickness of
walls, floors and other elements of the building structure.
4.1.5 Gradients
All pipe work shall be installed to gradients to allow for drainage and/or release of air, according
to the service concerned. Gradients shall be, generally, as follows:
(a) Refrigerant circulating pipes shall rise in direction of flow to predetermined high points.
(b) Condensate drains shall fall at a rate of not less than 1:120.
(c) Drains from tundishes shall fall to vertical drops at a rate of not less than 1: 250.
(d) Gas piping shall be laid to drain to low points where pockets with plugged ends shall be
fitted.
4.1.6 Cleanliness
Care shall be taken to avoid dirt entering pipe work during erection and all open ends must be
protected before and during installation with proprietary plastic or metal caps or plugs. Piping
shall be thoroughly cleaned prior to erection.
4.1.7 Chromium Plating
Copper pipe work for chromium plating shall be fully fabricated with all bends, soldered joints,
etc completed, clean and free from blemishes and then plated in accordance with the British
Standard.
8/19/2019 Document 5 Technical Specifications for HVAC
19/71
Technical Specification for HVAC Page 19 of 71
4.1.8 Electrolytic Action
A fitting of nonconductive, inert material is to be inserted to separate copper pipe work from any
galvanised or zinc coated steel.
4.1.9 Pipeline Identification
Identification of pipeline services and direction of flow shall be provided in accordance with the
British Standard and shall be applied after protective and/or decorative painting is complete.
Additionally in plant rooms, tank rooms, services and roof voids, pipe work shall be Colour
banded within 200mm of all connections to equipment.
Colour coding shall be provided as follows:
At 8m intervals on straight runs;
At all changes of direction;
Within 300mm of all valves;Within 300mm of all equipment items;At all junction points and branch (unless end of branch is visible from junction) and;
All lines passing through walls and floors where lines are accessible and not visible from an
identified main.
Direction of flow arrows and graphical symbols (where applicable) shall be stencilled in black on
a regular white background.
Closed circuit pipes shall be labelled 'FLOW' and 'RETURN' as applicable.
Letters and symbols shall be pipe nominal bore or 50mm in height whichever is the lesser.
Symbols shall conform to the legend on the record drawings and plant room charts.
The banding shall be achieved by use of purpose design plastic tapes.
The width of bands shall be at least 76mm wide and be placed at 3 meter intervals for voids,
ducts and false ceilings and in plant rooms around the whole circumference of the service and at
all other points where the service cannot be readily identified.
4.1.10 Pipes Passing through Walls EtcWhere pipe work passes through external walls, roofs and basement walls into the ground or into
trenches or ducts, the supply and fixing of weathering collars, sealing rings or frames and puddle
flanges as applicable shall be included to approved details. This is in addition to sleeving
requirements. The contractor shall provide and locate all sleeves and inserts required before the
floors and walls are built, or shall be responsible for the cost of cutting and patching required
where sleeves and inserts were not installed, or where incorrectly located.
8/19/2019 Document 5 Technical Specifications for HVAC
20/71
Technical Specification for HVAC Page 20 of 71
Sleeves shall be provided for all mechanical piping passing through concrete floor slabs and concretewalls, masonry, tiles and gypsum wall construction.
Sleeves shall not be provided for piping running imbedded in concrete slabs or insulatingconcrete slabs on grade. Where pipe motion due to expansion and contractor will occur, makesleeves of sufficient diameter to permit free movement of pipe. Where sleeves pass insulatedpipes, the sleeves shall be large enough to pass the pipe and insulation. Check floor and wallconstruction finished to determine proper length of sleeves for various locations make actuallength to suit the following:
(a) Terminate sleeves flush with walls, partitions, and ceilings
(b) In areas where pipes are concealed, as in shaft, terminate sleeves flush with floor© In areas where pipes are exposed extend sleeves 6mm above finished floor, except inrooms having floor drains. Sleeves shall be extended 18mm above floor.
All sleeves shall be constructed of galvanised steel pipes unless otherwise indicated in the
drawings.
4.1.11 Excavation and Backfilling
Underground Refrigerant supply piping shall be installed with the crown not less than 0.75m
below ground level. Excavations for pipe trenches shall be to straight lines and to correct depths
for the pipe and beds. The trench bottom shall be only of sufficient width to allow adequate
working space for pipe installers and where necessary, timbering to trenches shall be provided.
Excavated trenches shall not be opened too far in advance of pipe laying and shall not cause any
unnecessary obstruction of the site.
All pipes, cables, ducts, drains, mains and other services exposed by the excavations shall be
effectively supported and protected from damage. Should rock outcrops be discovered during the
course of excavation the Engineer shall be advised as soon as possible and work shall cease at
the location until the Engineer advises any modification which may be required to the pipe runs.
Backfilling with granular material shall be carried out over the barrels and between joints, prior
to pressure testing. After pressure testing, joints shall be covered with granular material to 50mm
above the crown of the pipe. The granular material shall be broken stone or gravel to pass 10mm
sieve and be retained on 5mm sieve well tamped.
As soon as possible after the position of pipe and granular material the trench shall be filled and
the next 300mm hand tamped with selected stone free excavated material placed in two equal
layers, fill in over to ground level with machine compacted excavated material and remove
surplus soil. Where pipes pass below roads and other asphalted or paved areas subject to motor
vehicle passage, cement pipe ducts with polypropylene sockets shall be provided.
8/19/2019 Document 5 Technical Specifications for HVAC
21/71
Technical Specification for HVAC Page 21 of 71
5.1 Piping and Joints
5.1.1 Standards
The piping and joints shall conform to the following British Standard Specifications:
BS 864 –2 : 1987 BS EN 1254 1998
Capillary and compression fittings for copper tubes.
BS 1724 : 1990
Bronze welding by gas.
BS 1044 : 1999
Specification for filler metals for brazing.
BS en 1057 : 1996
Copper tubes for gas.
5.1.2 General
All piping and tubing used in the construction of the various plants described in this specification
shall be straight, cleanly finished, round in cross section without cracks, surface flaws,
laminations/ and other defects and shall be free from scale in the case of ferrous material. Wherepipes are cut they shall be reamed to remove burrs.
5.1.3 Copper Tubes Half Hard Temper
(i) Light gauge copper tubes shall be half hard temper.
The tube shall be cleaned to remove any film or carbonised layer and must be acceptable to the
local Authority. Table Z tube may be used only in straight lengths.
(ii) Tubes shall have ends cut square to the axis and be suitable for connection by means of
compression or capillary fittings or welding.5.1.4 Copper Tubes Capillary Joints
Light gauge copper tubes, jointed with capillary type fittings shall be cut to the required length
with a purpose made copper tube cutter, the cut end then being filed true and smooth and the
outer periphery of the tube adjacent to the end cleaned with fine steel wool or fine sandpaper.
The fitting shall have an integral solder ring and the joint shall be made up by the application of
the correct flux and the flow of solder by capillary action along the annular space between the
8/19/2019 Document 5 Technical Specifications for HVAC
22/71
Technical Specification for HVAC Page 22 of 71
outside of the tube end and the inside of the socket of the fitting.
5.1.5 Copper Tubes Manipulative Compression Joints
Compression fittings may only be used where specified or following the engineer's approval.
Light gauge copper tubes jointed with manipulative compression fittings shall be cut to the
required length with a purpose made copper tube cutter, the cut end then being filed true and
smooth and all swarf, filings and dross then being carefully removed. The clean end shall then be
carefully expanded to the correct included angle with a drift provided by the manufacturer of the
fitting used, care being taken that the coned end so formed is not hardened. The joint shall be
made up by compressing the expanded portion of tube between the loose friction ring and loose
ferrule provided as part of the fitting.
5.1.6 Copper Tubes Non-Manipulative Compression Joints
Compression Fittings may only be used where specified or Following the Engineer's Approval.
Light gauge copper tubes jointed with no manipulative compression fittings shall be cut to the
required length with a purpose made copper tube cutter, The cut end then being filed true and
smooth, all swarf, filings and dross removed and the end cleaned with fine steel wool. The joint
shall be made by ensuring that the end is inserted into the threaded ring and olive and then
inserted fully into the fitting and tightened in accordance with the manufacturers' instructions.
5.1.7 Copper Tubes Welded Joints
Copper pipe work up to 200mm diameter with wall thickness up to 4.5mm shall be brazed in
accordance with the recommendations in HVCA Code of Practice TR/3, as modified below.
Joint designs, brazing procedures, brazer certification and production joint quality shall comply
with the requirements as interpreted by an approved testing body.
Brazing procedures shall include auxiliary heating for pipe diameters 75mm and larger, for solid
copper flanges, and in other circumstances where exposure, weather, wall thickness, etc, indicate sound
joints will not be otherwise assured.
Brazers shall hold a valid certificate of competency issued by an approved testing body. The
HVCA TR/3 standard test piece will be the accepted test of competency. Brazers without valid
certificates and those without relevant brazing work experience within the proceeding 3 months
shall undertake the TR/3 test, witnessed and certified by an approved body before commencing
work.
Brazers shall permanently identify each of their joints with their own marker, which will
withstand site conditions without damaging system or component performance. Methods of
marking shall be approved.
8/19/2019 Document 5 Technical Specifications for HVAC
23/71
Technical Specification for HVAC Page 23 of 71
A sample joint prepared by each brazer shall be subjected to visual and destructive testing, to the
satisfaction of the approved testing body. The sample joint shall be representative of the
thickness and diameter of the joints and the conditions of the site. 10% of production joints shall
be nondestructively tested by the approved test body in accordance with TR/3. Rectification
work on faulty joints shall be performed by different brazers. Brazers with failure ratesconsidered excessive by the approved test body shall be taken off the works.
.
5.2 Pipe Fittings
5.2.1 Standards
The piping fittings shall conform to the following British Standard Specifications:
BS EN 1057:1996
5.2.2 General
The equipment described in this section comprises all bends, springs, sweeps, elbows and other
changes in direction, all tees, oblique branches, swept branches and other junctions, all
reductions and enlargements in pipe bore, expansion loops, anchors etc.
The following general particulars shall apply to such fittings, irrespective of material and grade
as detailed in subsequent clauses, except where alternative particulars are specifically stated:
(a) Changes in Direction
All changes in direction shall be proportioned such that the ratio between the centre line radius of
the bend and the inside diameter of the pipe is not less than 1.5 to 1. Shorter radius bends shall
only be subject to specific approval where long radius bends will not fit or are not manufactured.
(b) Junctions
All branches from, and junctions to, a main pipe shall, except where otherwise detailed in the
drawings, be swept in with a radius or provided with an oblique approach in order to give a lead in thedirection of flow.
(c) Reductions and Enlargements
All reductions and enlargements in pipe bore shall be of the eccentric type where desirable for
venting or draining, and shall be proportioned to provide an easy transition. The included angle
shall be 10° where space permits and generally not in excess of 30°.
8/19/2019 Document 5 Technical Specifications for HVAC
24/71
Technical Specification for HVAC Page 24 of 71
5.2.3 Copper Capillary Fittings
Copper capillary type fittings shall be manufactured from copper or a suitable corrosion resisting
copper alloy as either castings, hot pressings or drawings, the material being non dezincifiable.
5.2.4 Copper Compression Fittings
Compression fittings may only be used where specified or following the engineer's approval.
Copper compression type fittings shall be manipulative fittings, type B. Such fittings shall be
manufactured from copper or a suitable corrosion resisting copper alloy as either castings, hot
pressings or drawings, the material being non dezincifiable. Each fitting shall consist of a body
having ends profiled to form a conical seating in the interior with threads or lugs on the exterior,
machined central ferrules having a double tape in cross section, machined conical friction rings
and coupling nuts or flanges.
5.2.5 Copper Pulled Bends
Where light gauge copper tubes are pulled on the site to form bends, springs, cranks and off sets,
the material used shall be as the piping standard. Tubes having nominal bores of up to 28mm
may be bent cold but larger sizes up to 42mm shall be annealed before manipulation.
Tubes shall be loaded prior to bending with springs. Where bending machines are used these
shall have smooth clean guides and formers, any scored or damaged tools being rejected. Bends
must not show any flattening, rippling or constriction of the tube bore.
5.2.6 Copper Junctions
Where junctions to copper mains are formed by autogenous or bronze welding on the site, such
work shall be carried out in accordance with the detail previously set down. Branches shall not
be welded into a main at any angle less than 60° and reinforcement by way of plates, collars or
shoes shall be provided. In general, branches shall take the form of a section of a pulled bend
welded into a hole cut in the main, the profile of both bend section and hole having been set out
to avoid excessive overlap and protrusion into main or branch. The main shall be cut and
swaged to form a raised cup and the spigot end of the bend section fitted thereto. Copper weld
junctions are to be used only with specific approval.
6 Pipe work Supports, Fixings and Anchors
6.1 General
8/19/2019 Document 5 Technical Specifications for HVAC
25/71
Technical Specification for HVAC Page 25 of 71
All supports, fixings, brackets, clips and accessories shall be included except where otherwise
stated.
6.2 Fixings
Fixings shall be of the type suitable for the structural member to which attachment is being made
and shall be approved.
Drilling for fixing to masonry and concrete utilising expanding bolts or self drilling fixing shall
be included. Where fixings are to be built in detailed drawings showing the necessary holes and
pockets shall be included. Alternatively where prior approval has been obtained the
requirements for holes and pockets can be marked up on site, and to be cut out. Use may be
made of tab or proprietary insert incorporated in the structure providing this is coordinated with
and not detrimental to the use of the fixings by others. The setting out of fixings shall be
included.
6.3 Brackets and Clips
The brackets and supports are to take the form of drop rods, cantilever Brackets, mild steel
channels supported by drop rods, ladder racks supported by drop rods, wall fixings or a
combination of these according to the number, size and location of the services to be supported.
Large scale detail drawings of brackets and shall be approved for approval before fabrication
commences.
The contact of dissimilar metals in brackets and piping is to be rigorously avoided. Drop rods
and bracket members will normally be of mild steel which shall be cleaned, degreased, primed
and painted with two coats of aluminium paint prior to erection. Pipe clips, rollers, U bolts, etc.
shall be a material appropriate to the pipe and shall, where necessary, be insulated from the
bracket and fixing bolts and nuts, by plastic linings and inserts.
Brackets shall provide for the specified gradients on all horizontal pipes and must carry the
provision for expansion, anchors, rollers etc. specified elsewhere.
Pipe brackets immediately above or below occupied spaces are to incorporate antivibration
isolation in the angle or channel supports or in the drop rods.
Drop rods shall normally be threaded at the lower end to allow for vertical adjustment and the
upper end shall be terminated to suit the structural fixing.
Pipes supported directly on mild sections shall be fixed with wrought iron ‘U’ bolts at each
support. The 'U' bolt shall be a clearance fit over the pipe, threaded at the end and secured to the
mild steel section with washers and locknuts on each side.
8/19/2019 Document 5 Technical Specifications for HVAC
26/71
Technical Specification for HVAC Page 26 of 71
Pipes which are thermally insulated with a vapour seal must be thermally isolated from the
bracket by inserting hardwood blocks or by Pipe support insert of Armaflex of the same outside
diameter as the overall diameter of the insulated pipe between the pipe and the bracket and under
the clamping 'U' bolt or mild steel strap.
6.4 Positions and Spacing of Brackets
Pipe work shall be supported on either side of changes of direction and pipeline mounted
equipment, and at centers not exceeding those shown in the following tables:
COPPER PIPES (TABLE X) PIPES
Pipe Dia Horizontal Vertical
(mm) (mm) (mm)
15 1200 1200
22 1500 2400
28 1800 240035 2100 300042 2400 300054 2700 3000
67 3000 360076 3000 3600108 3000 3600159 and over 3700 4200
UPVC PIPES (CLASSES D & E)
Pipe Bore Horizontal Vertical
(mm) (mm) (mm)
10 700 1500
13 900 180019 1000 210025 1000 210032 1200 2500
38 1200 250050 1300 2700
80 1600 2700
100 1800 2700150 and over 2200 3000
8/19/2019 Document 5 Technical Specifications for HVAC
27/71
Technical Specification for HVAC Page 27 of 71
Where two or more pipes are supported on a common bracket, the bracket spacing shall be that for the
smallest pipe concerned.
Vertical pipes shall be supported at the base or at anchor points to withstand the total weight of the riser.
Branches from risers shall not be used as means of support for the riser.
Supports in ducts, trenches and voids shall be so spaced to allow access to any pipe or joint without
disturbing the remainder.
7.0 Thermal Insulation
7.01 RELATED INSTRUCTIONS
1 Comply with requirements of Section 15010, Mechanical General Requirements.7.02 WORK INCLUDED
1 Work under this contract shall include but is not limited to the following.
2 The following services shall be provided with insulation as specified, Include other services
also if specifically stated elsewhere in the documents.
1 AC supply, return & Fresh air ducts.
2 Refrigeration piping.
3 Condensate water piping.
7.03 SUBMITTALS1 Submit detailed list of material for each service stating manufacture, ’K’ value, density, finish,
flame spread and smoke ratings, permeability, materials, finishes, cements and adhesives.
7.04 QUALITY ASSURANCE
1 Provide insulation of equipment, piping and ductwork as described or noted. Insulation, jackets
and adhesives shall be incombustible, in compliance with local Building Code; installed to
manufacturer’s standards, and to approval. Wheat pastes shall NOT be used. Products containing
asbestos shall not be used. Make suitable approved openings in insulation for inspection outletsand equipment nameplates.
2 Third Party Supervision Testing: Verification testing by a nationally recognized independent
testing organization that will conduct sampling of the product through to simulated end use
testing.
3 To allow for expansion and contraction of sheet and roll insulation, leave a ½. wide uncoated
border at the butt-edge seams on the surface to be insulated and the insulation surface. Overlap
8/19/2019 Document 5 Technical Specifications for HVAC
28/71
Technical Specification for HVAC Page 28 of 71
the insulation ¼. at the butt-edge and compress the edges into place. Apply adhesive to the butt-
edge of the insulation.
4 Consultant reserves right to demand test samples to composite insulation systems for fire
hazard test rating.
5 Where wire is specified to secure insulation, it shall be stainless steel wire, 1.3 mm gauge, deadsoft annealed type.
6 Material shall be delivered in non broken, factory furnished packaging and stored in a clean,
dry indoor space that provides protection against the weather.
7 Insulation shall be applied by qualified personnel skilled in this trade.
8 Progressive testing of the systems to be insulated shall have been completed, inspected and
approved by the Owner’s representative before the insulation is applied.
9 Insulation shall not be applied until all surfaces are clean, dry, and free of dirt, grease, frost,
moisture, and other extraneous elements.
10 Work shall be performed at the temperatures recommended by the product manufacturer.
7.05 MATERIALS
1 Acceptable Manufacturers: These specifications are based on products and data of Kaim - flex
and designate the type and quality of work intended under this section. Products of other
manufacturers, proposed as equivalent, must be submitted for written approval by the Engineer.
Supporting technical data, samples, published specifications and the like must be submitted for
comparison. The contractor should warrant that proposed substitutions, if accepted, shall provide
performance equal to the materials specified herein. Also refer section 1.11 for alternative
material as fiberglass or pre insulated ductwork. The contractor may propose manufacturer’s pre-
insulated copper pipes with internally profile to entrap air and provide a thermal barrier for hot
water piping.
2 Insulation materials shall be a flexible, closed-cell elastomeric insulation in tubular or sheet
form: AP Armaflex, AP Armaflex W, AP Armaflex SS, or kaim-flex. This product meets the
requirements as defined in ASTM C534, specification for preformed elastomeric cellular thermal
insulation in sheet and tubular form.
3 Materials shall have a flame spread rating of 25 or less and a smoke-developed rating of 50 or
less when tested in accordance with ASTM E84, latest revision. Sheet material with a thickness
greater than 1. shall have a flame spread rating of 25 or less and a smoke developed rating of 100
or less when tested in accordance with ASTM E84, latest revision. In addition, the product, when
tested, shall not melt or drip flaming particles, the flame shall not be progressive and all
materials shall pass simulated end-use fire tests.
4 Materials shall have a minimum thermal conductivity of 0.27 Btu-in/h-ft2 - ºF at a 75ºF mean
temperature when tested in accordance with ASTM C177 or ASTM C518.
8/19/2019 Document 5 Technical Specifications for HVAC
29/71
Technical Specification for HVAC Page 29 of 71
5 Materials shall have a minimum water vapor transmission of 0.08 perm-inches when tested in
accordance with ASTM E96, Procedure A, latest revision.
6 The material shall be manufactured under an independent third party supervision testing
program covering the properties of fire performance, thermal conductivity and water vapor
transmission.7 For high temperature and nonhalogen:
1. Insulation material shall be a flexible, closed-cell elastomeric insulation in tubular or sheet
form: HT Armaflex or NH Armaflex.
2. Materials shall have a flame spread rating of 30 or less and a smoke developed rating of 200 or
less when tested in accordance with ASTM E84, latest revision. In addition, the product, when
tested, shall not melt or drip flaming particles, and the flame shall not be progressive.
3. HT Armaflex shall have a minimum thermal conductivity of 0.30 Btu-in/h-ft2 - ºF at a 75ºF
mean temperature when tested in accordance with ASTM C177 or ASTM C518, latest revisions.
NH Armaflex shall have a minimum thermal conductivity of 0.275 Btu-in/ h-ft2 - ºF at a 75oF
temperature when tested in accordance with ASTM C177 or ASTM C518, latest revision.
4. HT Armaflex and NH Armaflex shall have a minimum water vapor transmission of 0.05
perm-inches when tested in accordance with ASTM E 96, Procedure A, latest revision.
8 Adhesive shall be the insulation manufacturer’s recommended contact adhesive. Armaflex 520
Adhesive or Armaflex HT 525 Adhesive.9 Insulation finish shall be the insulation manufacturer’s recommended finish: WP Armflex Finish.
10 Accessories such as adhesives, matches and cements shall have the same properties as listed
above and shall not detract from any of the system ratings as specified above.
7.06 PIPING
1 Install pipe insulation by slitting tubular sections and applying onto piping or tubing.
Alternately, whenever possible, slide unslit sections over the open ends of piping or tubing. All
seams and butt joints shall be adhered and sealed using Armaflex 520 Adhesive. When using AP
Armaflex SS, only the butt joints shall be adhered using Armaflex 520 Adhesive. When using
HT Armaflex for temperatures above 120ºC, Armaflex HT 525 Adhesive shall be used. The
complete insulation shall be covered with glass cloth & vapour barrier coating to avoid the
damages during installation phase.
2 Insulation shall be pushed onto the pipe, never pulled. Stretching of insulation may result in
open seams and joints.
3 All edges shall be clean cut. Rough or jagged edges of the insulation shall not be permitted.
Proper tools such as sharp knives must be used.
8/19/2019 Document 5 Technical Specifications for HVAC
30/71
Technical Specification for HVAC Page 30 of 71
4 On cold piping, insulation shall be adhered directly to the piping at the high end of the run
using a one-inch strip of Armaflex 520 Adhesive on insulation shall be coated with Armaflex
520 Adhesive.
5 Sheet insulation shall be used on all pipes larger than 150 mm insulation shall not be stretched
around the pipe. On pipes larger than 300 mm IPS, adhere insulation directly to the pipe on thelower 1/3 of the pipe.
6 Seams shall be staggered when applying multiple layers of insulation.
7.07 HANGERS
1 Standard and split hangers: Piping supported by ring hangers shall have hangers insulated with
the same insulation thickness as the adjacent pipe. All seams and butt joints shall be sealed with
Armaflex 520Adhesive. When using HT Armaflex above 120oC, Armaflex HT 525 Adhesiveshall be used. Ring hangers may be sleeved using oversized tubular insulation. ON cold piping,
insulation shall extend up the hanger rod a distance equal to four times the insulation thickness.
Insulation tape may be used to a thickness equal to the adjacent insulation thickness.
2 Clevis hangers or other pipe support systems - saddles shall be installed under all insulated
lines at unistrut clamps, clevis hangers, or locations where the insulation may be compressed due
to the weight of the pipe. Cold piping over 40 mm in diameter shall have wooden dowels or
blocks of thickness equal to the insulation and adhered to the insulation between the pipe and the
saddle.
7.08 OUTDOORS EXPOSED PIPING
1 All outdoor exposed piping shall be painted with two coats of WB Armaflex finish. Prior to
applying the finish, the insulation shall be wiped clean with denatured alcohol and finished with
0.6 mm aluminium cladding. The finish shall not be tinted.
2 All outdoor exposed piping shall have the seams located on the lower half of the pipe.
7.09 PIPING INSULATION THICKNESS SCHEDULE
2 Closed cell rubber insulation:
Refrigerant Pipe Insulation
8/19/2019 Document 5 Technical Specifications for HVAC
31/71
Technical Specification for HVAC Page 31 of 71
Condensates drain – Up to 50 mm – 12mmThickness.
Over 50 mm to 100 mm – 20 mm Thickness.
7.11 SQUARE AND RECTANGULAR DUCTWORK
1 Armaflex Sheet Insulation shall be adhered directly to clean, oil-free surfaces with a full
coverage of Armaflex 520 Adhesive. When using HT Armaflex for temperatures above 120oF,
Armaflex HT 525 Adhesive shall be used. AP Armaflex SA shall be adhered directly to clean,
oil-free surfaces. The complete insulation shall be covered with glass cloth & vapour barrier
coating to avoid the damages during installation phase.
2 The duct insulation shall be constructed from the bottom up, with the top insulation sized to
extend over the side insulation. This will form a watershed.
3 Butt-edge seams shall be adhered using Armaflex 520 adhesive or Armaflex HT 525 adhesive
by the compression fit method to allow for expansion/contraction. Leave a 12 mm wide uncoated
border at the butt edge seams on the duct surface and the insulation surface. Overlap the
insulation 8 mm at the butt-edges and compress the edges into place. Apply Armaflex 520
adhesive or Armaflex HT 525 adhesive to the butt-edges of the insulation.
4 Standing metal duct seams shall be insulated with the same insulation thickness as installed on
the duct surface. Seams may be covered using strips of Armaflex sheet insulation or half sections
of tubular pipe insulation with miter-cut ends. Standing seams shall be adhered using Armaflex
520 adhesive or Armaflex HT 525 adhesive.
5 Insulation seams shall be staggered when applying multiple layers of insulation.
6 In lieu of closed cell rubber insulation specified above contractor has option to provide
fiberglass rigid insulation for ducts, chilled water pipes or pre insulated ducts. The contractor to
qualify in tender response the option selected and in case same is not provided it shall be
considered that contractor has opted for closed cell insulation in the bid. The fiberglass insulation
shall be of fine, stable and uniformly textured inorganic glass fiber bonded to non water soluble
fire retardant thermosetting resin. The insulation shall be of rigid board type with foil reinforced
kraft laminate facing. The density of insulation shall be 48 kg/cu mtr and thermal conductivity
not to exceed 0.03W/m deg C at 0 deg C in accordance with ASTM C518. The vapour
permeability shall not exceed 0.02 perm and should confirm to Class 0 fire rating as per building
Piping System Up to
50 mm
Over 50 mm
to 100 mm
Over 100 mm
To 150 mm Over 150 mm
Above 25o F 20 mm 25 mm 25 mm 25 mm
10oF to 25oF 25 mm 25 mm 32 mm 32 mm
10oF to 25oF 25 mm32 mm
32 mm40 mm
40 mm32 mm
40 mm32 mm
8/19/2019 Document 5 Technical Specifications for HVAC
32/71
Technical Specification for HVAC Page 32 of 71
regulations section E15. The thickness of insulation shall be 25 mm for ducts in conditioned area
and 50 mm for ducts in non conditioned or exposed areas. The insulation thickness for chilled
water pipes in conditioned area shall be 25 mm for nominal pipe sizes up to 25 mm dia, 38 mm
for pipe sizes up to 40 mm dia and 50 mm for 50mm & above dia pipes. The thickness of
insulation shall be 50 mm for all pipes in unconditioned areas. The insulation shall be of rigidfiberglass pipe sections with density of insulation not less than 64 kg/ cu. Mtr. All other details
for insulation remains same as stated for duct board insulation. The duct applicable to be
insulated remains same as defined under section 1.15. All the fiber glass insulated ducts &
chilled water pipes are required to be provided with 10 x 10 glass cloth with 2 coats of
antifungal, flame retardant vapour barrier coating. The exposed to weather insulation shall be
provided 2 coats of weather proof anti fungal coating in addition to 0.6 mm aluminum cladding.
The vapour barrier shall be fire retardant and anti fungal type.
7 The contractor may propose pre insulated ducts with phenolic foam insulation but usage of
same shall be limited to FCU supply ducts and in accessible false ceiling areas.
7.12 EXPOSED OUTDOOR DUCT
1 All outdoor exposed ductwork shall be finished using 0.6 mm Aluminum cladding, stucco
finish.
7.13 W B ARMAFLEX FINISH
All outdoor ductwork & other insulated services as stated previously shall be finished with two
coats of WB Armaflex finish applied over a 10 x 10 Leno weave glass cloth 0.6 mm Aluminum
cladding:
1 The surface of the insulation must be clean and dry.
2 Allow adhesive seams on the insulation to set for two hours.
3 Apply thin uniform coat of Childers CHIL-SPRAY® WB CP-56 adhesive. Allow to become
tacky, and apply 10 x 10 Leno weave glass mesh. (CP-56 adhesive may take up to 20 minutes to
become tacky.)
4 Allow adhesive and mesh to dry four hours.
5 Apply WB Armaflex finish over the mesh at a rate of less than 400 square feet per gallon.
Allow to dry four hours.
6. Apply the second coat of WB Armaflex finish at a rate of less than 400 square feet per gallon.
7.14 MASTIC SYSTEM
1 The insulation shall be adhered to the material by using insulation manufacturers
recommended sealant. The contractor to consult the mastic manufacturer for any additional
8/19/2019 Document 5 Technical Specifications for HVAC
33/71
Technical Specification for HVAC Page 33 of 71
recommendations.
1 The surface of the insulation must be clean and dry.
2 Wipe the surface of the Armaflex insulation with a clean cloth.
3 Apply a tack coat of mastic with a uniform thickness at a rate of 50 square feet/gallon bytrowel, glove, large brush, or spray.
DO NOT THIN MASTIC!
4. Blend 10 x 10 Leno weave glass mesh into the first application of mastic, making sure to
overlap the seams of the glass cloth by 2 inches.
5. Apply a finish coat within one hour after the tack coat at a rate of 50 square feet/gallon. The
mastic will dry to the touch in two hours, but complete drying takes 24 to 36 hours.
7.15 DUCTWORK INSULATION THICKNESS SCHEDULE
1 Duct Systems:
Application Conditioned are Un Conditioned are Exposed
Supply air 13 mm 19 mm 25 mm
Return air except in
conditioned area
13 mm 19 mm 25 mm
Fresh air 13 mm 13 mm 25 mm
Exhaust air if used for
energy recovery
13 mm 19 mm 25 mm
7.16 EQUIPMENT INSULATION
1 Armaflex sheet insulation shall be adhered directly to clean, oil-free surfaces with a full
coverage of Armaflex 520 Adhesive or Armaflex HT 525 adhesive. AP Armaflex SA shall be
adhered directly to clean, oil-free surfaces. The make stated or equivalent is indicative of the
quality of insulation material expected.
2 All seams and butt-joints shall be adhered and sealed with Armaflex 520 Adhesive or
Armaflex HT 525 Adhesive.
3 On cold surfaces: All exposed end cuts of insulation shall be coated with Armaflex 520
adhesive or Armaflex HT 525 adhesive.
4 Seams shall be staggered when applying multiple layers of insulation.
7.17 EQUIPMENT INSULATION THICKNESS SCHEDULE
8/19/2019 Document 5 Technical Specifications for HVAC
34/71
Technical Specification for HVAC Page 34 of 71
System
Temperature
AP Armaflex
Thickness
HT Armaflex
Thickness
NH Armaflex
Thickne
Below 0oF 50 mm 50 mm 50 mm 0oF to 20oF 40 mm 40 mm 40 mm
20oF to 40oF 25 mm 25 mm 25 mm
40oF to 55oF 20 mm 20 mm 20 mm
55oF to 100oF 12 mm 12 mm 12 mm
100oF to 120oF 20 mm 20 mm 20 mm
120oF to 140oF 25 mm 25 mm 25 mm
140oF to 160oF 40 mm 40 mm 40 mm
160oF to 180oF 50 mm 50 mm 50 mm
180oF to 250oF-
63 mm -
250oF to 300oF-
75 mm -
7.18 REFRIGERATION PIPING INSULATION
1 All liquid and suction lines shall be insulated continuously from a point 150 mm inside the
display case to the suction service valve at the compressor.
2 All low temperature lines (-12oC and below) shall be insulated with a minimum of 25 mm
thickness.
3 All medium and high temperature lines (above -12oC) shall be insulated with a minimum of 25
mm thickness.
4 All medium and high temperature lines (above -12oC) shall be insulated with a minimum of 20
mm thickness.
5 Heat reclaim lines shall be insulated from the condensing unit to the heat reclaim units with 20
mm thickness.
6 All refrigerant copper lines must be free of extraneous chemicals such as corrosive cleaners or
building materials. Dust prior to the installation of the insulation.7 Refrigerant pipes shall be sealed while slipping on insulation to prevent foreign matter from
entering the tube.
8 Insulation is to be slid onto pipe; longitudinal slitting of the insulation is not allowed except on
mitered sections. Insulation shall be pushed onto pipe, not pulled.
9 Insulation shall be mitered; pre adhered and longitudinally slit to fit over all P-traps, tees and
elbows or bends over 90º.
8/19/2019 Document 5 Technical Specifications for HVAC
35/71
Technical Specification for HVAC Page 35 of 71
10 At the beginning, at every 4 to 6 m, and at the ends of ping runs, the insulation shall be
adhered directly to the copper using a 50 mm strip of adhesive. Insulation should not be adhered
to the pipe at the extreme low points in piping run.
11 Saddles shall be installed under all insulated lines at unistrut clamps, clevis hangers, or
locations where insulation may be compressed. Wood dowels or blocks, of a thickness equal tothe insulation, shall be inserted and completely sealed into the insulation if the excessive
compression of the insulation remains at the saddle locations.
12 Hangers clamped directly to the pipe shall be insulated over the hanger; insulation shall be
fully adhered to the hanger. In addition, hangers with double rods shall be insulated between the
rods. All seams of the insulation shall be sealed with adhesive.
13 All insulation exposed to sunlight or installed outdoors shall be protected with glass cloth &
two coats of WB Armaflex or equivalent finish (vapour barrier) & 0.6 mm Aluminum cladding.
All other piping shall have same finish as exposed except the aluminum cladding.
8.0 Low Velocity Ductwork
8.1 Standard Low Velocity Duct Works
The ductwork shall be manufactured and installed in accordance with Specifications DW 144,
DW 151 and DW 191 published by the Heating and Ventilating Contractors Association except
where amplified or amended below.
Continuously hot dip zinc coated and iron zinc alloy coated steel: wide strip, sheet/plate and slitwide strip.
BS 5588 : Part 9 : 1999
Fire precautions in the design and construction of buildings.
8.2 Specialist Installer
The ductwork and plant interconnections forming part of the air conditioning and ventilation systems
covered by this specification and shown on the drawings shall be manufactured and erected by
specialist workmen employed either directly in a specialist ductwork department by the Tenderer
or by a specialist ductwork firm. The Tenderer shall include the name of the selected ductwork
firm in the Tender details. Any subsequent change to the ducting firm shall be approved.
8.3 General Requirements and Erection
All ductwork shall be constructed and installed to present a rigid installation free from sway,
8/19/2019 Document 5 Technical Specifications for HVAC
36/71
Technical Specification for HVAC Page 36 of 71
drumming and movement. Ductwork shall be truetosize and accurately aligned.
Ductwork sizes indicated are clear internal airway dimensions. Allowance shall be made for
lining and coverings when required.
Takeoffs from the main ductwork shall be conical, bell mouth or shoe type. Duct size squaretakeoffs will not be allowed.
The use of self tapping screws shall be restricted to the completion of site joints in extremely
difficult locations only, with prior agreement of the Engineer.
8.4 Ductwork Drawings
Detailed layout drawings of all ductwork systems shall be prepared based upon the scheme
drawings and the Architect's and Structural Engineer's working drawings and incorporating such
variations as are advised subsequent to the issue of the scheme drawings. The layout drawingsshall clearly show the dimensional relationship between the ductwork and the building fabric and
shall be coordinated with and show space allowances for all other services to be installed.
The coordination shall make adequate allowance for the application of specified thermal
insulation on all surfaces of ducts by ensuring sufficient clearance from the building structure
and other adjacent services.
The drawings shall be at a scale of 1:20 except for extensive distribution systems which may be
at a scale of 1:50 with plant connections, connections to terminal devices and areas of potential
conflict with the building or other services shown at 1:20. The drawings shall be issued for
comment and, where necessary, amended and reissued for approval in accordance with
procedures detailed elsewhere. Ductwork manufacturing details (shop drawings, parts lists, etc)
shall also be submitted for comment before manufacture commences.
8.5 Air Leakage
Not withstanding any other leakage rates specified in this document the supply ductwork and
supply branches to terminal units shall be of the quality that limits the maximum permitted
leakage rate at a test pressure of 700 Pa to 0.21 liters/sec/m sq of surface area (Class C).
Leakage tests shall be carried out on site to demonstrate to the Engineer that the leakage rate
shall not be exceeded.
The Ductwork Leakage Testing Procedures shall be those set out in DW/142 and DW/143
published by the HVCA. Before the commencement of any testing the Contractor shall submit a
method statement including a schedule of the surface areas of each section of the ducting to be
8/19/2019 Document 5 Technical Specifications for HVAC
37/71
Technical Specification for HVAC Page 37 of 71
tested which shall be printed on the working drawing. Each section to be tested shall be clearly
defined on the drawings.
8.6 Ductwork Standards
All other ductwork systems shall be constructed to Class A, low pressure (up to 500 Pa) systemrequirements unless stated otherwise.
3.7 Ductwork Materials
Ductwork shall be manufactured from hot dip galvanized sheet to BS 2989 : 1982 Grade Z2
coating type G275 and mild steel section to the gauges and sections specified in DW 142 except
that ducts with longest side dimensions up to 600mm may be made from 0.5mm thickness sheet.
Cut edges of galvanized sheet and all mild steel sections used in joints, stiffeners or supports,
shall be free from rust and painted one coat of aluminium paint at work and again immediately
prior to erection.
8.8 Seams, Joints And Stiffeners
Longitudinal seams shall be as specified in DW 142 figures 1, 2 or 7. Lateral joints in ducts with
longest side dimension not exceeding 400mm shall be plain slip joints to figure 9 in DW 142.
Lateral joints in ducts with longest side dimension exceeding 400mm but not exceeding 1500mm
shall be angle reinforced slip joints to figure 12 in DW 142. Lateral joints in ducts with longest
side dimension exceeding 1500mm shall be angle flanged joints to figure 33 in DW 142 and
incorporating an approved gasket. Where the specified joint cannot be used due to the close
spacing of the building or other services, internally made joints will be permitted. Such internal
joints may be of the slip or butt strap pattern and where the DW 142 specification calls for
stiffening, this will take the form of internal mild steel flat bar. Such internal joints are to present
a smooth surface to the air flow with the maximum permissible reduction from nominal area
being 3%. The quality of ductwork construction shall be suitable for the particular application
and adequate stiffening shall be applied to prevent the vibration and flexing of ductwork in
operation and to ensure that air leakage is kept to a satisfactorily low level.
8.9 Bends, Tees, Tapers, Etc
Bends and tees are to be constructed with a throat radius equal to one half of the duct dimension
taken in the same plane. Tapers, change sections and offsets are to be constructed with their sideshaving an angle to the axis of the adjacent straight duct no greater than 22.5°. Where these
requirements cannot be achieved due to the constraints of the building structure or other services,
internal splitters are to be used to DW 142 figures 52(b) and 68. Where square bends are
necessary, aerofoil turning vanes shall be employed as DW 142 figure 55. Branches and twin
bends are to be as DW 142 figures 59 and 56 respectively.
8/19/2019 Document 5 Technical Specifications for HVAC
38/71
Technical Specification for HVAC Page 38 of 71
8.10 And Fixings
All ductwork and equipment supports and fixings to the building structure shall be included. The
fixing shall be suitable for the building member to which they are attached and shall be subject to
approval.
Supports are to be constructed and spaced in accordance with Specification DW 142. On all thermally
insulated ducts a thermal bridge between the ductwork and the support is to be avoided. On
circular ducts the supporting strap shall be separated from the ductwork material by a 6mm thick
self-extinguishing grade neoprene spacing gasket fixed to the strap with adhesive. On
rectangular ducts the separation is to be achieved by hardwood blocks between the supporting
member and the ductwork.
8.11 Cleanliness
Cleanliness of ductwork systems shall be carried out in accordance with the Intermediate
Standard of DM/TM2, 1991 "Guide to Good Practice Internal Cleanliness of New DuctworkInstallations" published by the HVCA. All plant and ductwork shall be cleaned thoroughly
internally before it becomes inaccessible due to the progress of building operations.
8.12 Regulating Dampers
Regulating dampers shall be provided where shown on the drawings and wherever necessary for
the proper regulation and balancing of the systems. They shall be 'Air shield' type with aerofoil
section, stainless steel blades in a galvanized double skin casing with totally enclosed gears and
control. In ducts where the air velocity is less than 4 meters/sec and the diameter is less than
300mm or the longest dimension is less than 450mm, single skin damper blades may be used. The
damper shall be capable of locking securely in the required position when system regulation has
been completed. The position of each damper when it is correctly set shall be recorded.
8.13 Non Return/Volume Dampers
Non return dampers shall be provided where shown on the drawings. Non return dampers shall
be of the balanced, tight closure, self operating type. Non return damper blades and frames shall
be fabricated from 2.65mm thick extruded aluminium; blades of reinforced double wall air foil
design with stainless steel side jambs.
8.14 Test Holes \25mm diameter test holes with 50mm diameter covers fixed with two self tapping screws shall
be fixed at suitable agreed test positions adjacent to plant and to all branches. The cover shall
have one hole slotted to allow the cover to hinge sideways. Two test holes will be provided on
ducts up to 225mm wide. On ducts more than 225mm wide they shall be at not more than
100mm centers and 50mm from the side of the duct.
8/19/2019 Document 5 Technical Specifications for HVAC
39/71
Technical Specification for HVAC Page 39 of 71
8.15 Plenum Boxes
Plenum boxes for terminal devices shall be constructed to the same standards as ductwork of
similar dimensions.
8.16 Flexible Plant Connections
Flexible plant connections shall be fitted to the inlet and discharge of all fans and air handling
plants. The flexible connections are to be minimum 75mm long and the duct openings are to be
correctly lined up. Each end of the connection shall be flanged and sandwiched between the
flange on the fan etc, and a substantial mild steel counter flange. All joints shall be sealed and
capable of withstanding the required working pressure.
8.17 Flexible Ducts
Flexible duct connections to terminal devices shall be fitted where indicated on the drawing and
shall comply with clause 25.2 of DW 142 and be fixed with sealant and worm drive clips.
Flexible ducts shall not be used to connect adjoining lengths of sheet metal ductwork. Supply air
flexible ducts shall be preinsulated with a nominal 25mm thickness of fiberglass with reinforced
metallized ylarNeoprene laminate to provide a vapour seal. Flexible ducts which are crushed,
deformed, split or have damaged insulation or vapour seal will be rejected by the Engineer. The
flexible ducts are to be mounted so as to give satisfactory radii on bends, etc and the terminal
devices and duct connections are to be so positioned as to permit this to be achieved to the
Engineers satisfaction. The maximum length of flexible duct shall be no more than 7500mm.
No combustible flexible duct or joint shall be installed in a false floor void or a false ceiling void
or any other void where the presence of combustible material would result in the installation of
smoke barriers over and above those otherwise necessary or which would result in such a void
requiring sprinkler protection which would not otherwise be installed.
Elsewhere Class 0 or Class 1 spread of flame shall apply as required by the Local Authority.
8.18 Of Ductwork
All ductwork shall be identified in accordance with the following clauses of appendix C of DW
142
8.19 Identification of Equipment
All equipment shall be identified in accordance with the reference system used in the "As
Installed" information, and be approved by the Engineer. Labels shall be white/black/white
traffolite and be rivetted or self adhesive fixed to equipment items.
8.20 Duct Mounted Sensors, Control Items, Damper Linkages, Etc
All duct mounted sensors, thermostats, damper linkages, damper actuators and associated duct
8/19/2019 Document 5 Technical Specifications for HVAC
40/71
Technical Specification for HVAC Page 40 of 71
mounted control items shall be fitted on site.
8.21 Ducts Passing Through Walls, Etc
Where ductwork passes through external walls, roofs and basement walls into the ground or into
trenches or ducts, the supply and fixing of weathering collars, sealing rings or frames and puddle
flanges as applicable shall be included. All details shall be approved prior to installation.
9.0 Refrigeration Equipment
9.1 Standards
The refrigeration equipment and cooling towers shall comply with the following British
Standards:
BS EN 60085: 2004
Method for determining the thermal classification of electrical insulation.
BS EN 12449: 1999
Tubes for general purposes.
BS EN 102442: 2001
Requirements for refrigeration safety.
BS 4485 : Part 3 : 1988
Code of practice for thermal and functional desk.
BS EN 15151: 2000
Flanges and their joints. Bolting
BS EN 1092 –2: 1997
Flanges and their joints
9.2 Refrigeration Machines
9.3 Split System Air Conditioning Units
General
The contractor shall supply, install, test and commission split system air conditioners, as shown
on drawings and as specified in the following section. Each split unit shall be guaranteed by the
manufacturer to produce a capacity not less than the specified capacity at specified conditions. The
Split Units shall be suitable for continuously operating at 520C ambient temperature.
8/19/2019 Document 5 Technical Specifications for HVAC
41/71
Technical Specification for HVAC Page 41 of 71
Condensing unit
Each condensing unit shall be complete with compressor and motor assembly, air cooled
condenser fan with motor, internal piping, control panel, switches, and internal wiring all
enclosed in a weatherproof enclosure suitable for prevailing ambient conditions. The unit shall
operate satisfactorily with a voltage variation of at least + 10% from the specified voltage.
The units shall be specially designed for Middle East High Ambient temperature and desert
conditions. The casing shall be constructed out of coated, galvanized sheet steel, protected by
stratashield special paint cycle to provide long term resistance to weather. The casing shall
comply with ASTMB117:1000 hour salt spray test.
The compressor shall be hermetic reciprocating type suitable for operation on R22 refrigerant
with high EER (Energy Efficiency Ratio).
The condenser coil shall be air cooled type with aluminium fins mechanically bonded to copper
tubes and necessary refrigerant connections. The copper tubes shall not be less than 12mm OD.
The condenser fans shall be propeller type vertical or horizontal discharge direct driven complete
with motor. The air quantity and area of condenser coil shall be adequate for satisfactory
operation up to ambient temperature of 520C. The condensing unit shall be equipped with HP &
LP switches as a standard.
Indoor Fan Coil Unit
The indoor unit shall be matched with the condensing unit. Unit shall comprise cooling coil, fansection, filter, outer casing and accessories. The cooling coil shall have copper tubes of not lessthan 10mm OD and continuous aluminium fins. The fins shall be mechanically bonded to the
tubes.
The fan section shall consist of forward curved fan complete with scroll, shaft and self aligning
bearings and fan motor mounted on flexible supports.
The unit shall have automatically controlled discharge air louvers with up and down swing
motion for uniform air distribution. Further, it shall be possible to set the louver’s position from
the remote control according to the user’s choice.
The unit shall have hinged front grille for easy access to filter and unit.
Filters shall be cleanable type low velocity design. The unit shall have provision of auto fan
s