where Design has a new Dimension

Designer Shades

Have they not observed all things that Allah hath created, how their shadows incline to the right and to the left, making prostration unto Allah, and they are lowly? Surat An-Naĥl (The Bee) , Ayah 48

Ramcon is a contracting and engineering resource entity.

Registered with Pakistan Engineering Council in Category C-3.

We have prequalification with various department such as NHA, CDA, CWO, SCO, PCB

in civil work categories. We are also providing services in a few defense related

authorities.

We are pioneers in Tensile Fabric Structures in Pakistan. First

designed built membrane structure built in F-9 Park was a

mosque followed by other projects.

We are supported by:

Ramcon is a quality conscious organization and we believe

in quality products & on time job accomplishment.

Mehler

Tex-nologies Germany Covertex China Gale Pacific

Australia

Registration With The Income Tax Registration With

Pakistan Engineering Council

EXECUTED PROJECTS

MOSQUE Structure ,F-9 Park

Project: Prayer Space 1400 sq ft.

Material: Mehler, Typ3, Mehatop F.

Supported Fabrication : Covertex China.

Design Concept: The canopy top is angled

towards QIBLAH depicting the holy perception of

a prayer space & providing shade with respect

to the solar study.

Execution Phase

Client: Tollink Pakistan

Project: CDA IJP Toll Plaza

The 3500 square feet toll

plaza welcomes thousands of

people entering into the city.

IJP Toll Plaza

Toll Plaza Rawat

Client: Tollink Pakistan

Client: Capital Development Authority Islamabad

Material: Mehler, Typ3, Mehatop F

Fabrication Support: Covertex China

Location: Rawal Lake Promenade

Mosque ,Promenade

Ring Road Project

Ring Road Project, Rawal Pindi

LMKR Project, Shade Structure for Swimming Pool

Client:

CDA Islamabad

Project:

Food Court.

Material: Mehler, Type3,

Mehatop F

Fabrication Support:

Covertex China

Location:

Rawal Lake Promenade

Food Court, Promenade, Rawal lake

Installation of the

Structure

Final Form

CARPORTS

Residential Carport in Westridge Rawalpindi

Structure for Dr. Aslam’s Residence ,Rawalpindi

NPL (Nishaat Power Limited) , Lahore Consultants : SRDW

NPL (Nishaat Power Limited) , Lahore Consultants : SRDW

Foreign Office, Islamabad

Entrance Khyber Teaching Hospital,(Khyber Medical College) , Khyber Pakhtoonkhwa

Swimming Pool, Jacaranda Club, DHA Islamabad

Façade Elevation

Side Pool Covers

Juice Bar at Jacaranda Club

Façade Elevation

Execution

Fijji’s Grill , Entrance Shade Structure, Blue Area

Nadia Textile, Lahore

Installation Phase

Nespak Era Shade Structure for Walkways, Islamabad

Beacon House Entrance & Car Park Shade, Lahore

Umbrellas for Gloria Jeans

FWO Car Parking

CWE , Muzaffarabad ,Azad Kashmir

Consultant : Nespak Era

Client: CWE (China Water & Electrical Works)

PROPOSED PROJECTS

New Airport Car parking

Proposed Prayer Space at Rawat Toll Plaza,

Islamabad

Ashiana Restaurant, Shakarparian, Islamabad

Islamabad Airport Shade Structures

Ashiana Restaurant, Shakarparian, Islamabad

Swimming Pool , ACES

Marriage Halls

Bar b que Area, Grand Hayyat Hotel, Near Convention Centre

Proposed Motorized Retractable Shade for Ashra Mobashara Mosque Rawalpindi

Proposed Pedestrian Bridge for NHA M2

Mess GIK I NSTITUTE, Project Dugout

Proposed Prayer Space at Rawat Toll Plaza,

Islamabad

Proposed Prayer Space at Rawat Toll Plaza,

Islamabad

DGKC Entry Gates

Proposed Prayer Space at Rawat Toll Plaza,

Islamabad

Shade Structure for Cafeteria on the Landscape Company’s Office, KARACHI

Proposed Prayer Space at Rawat Toll Plaza,

Islamabad

Shade Structure on Courtyard, Girls College , Jhelum

Proposed Structure for Marquee for TOPI RAKH in Ayub Park , Rawalpindi

Service Procedure

we

Follow

Client Name:

Consultant: Ali Umar

Our Rep: Imtiaz Ahmed

' 12 2012

8/1 2012

8/20 9/8 9/27 10/16 11/4 11/23 ' 12

Handover 9/12/12

Checking QC Approval 2/12/12

Installation 10/10/12

Site Logistics 5/10/12

Fabrication 25/8/12

Procurement 5/8/12

Design 1/8/12

Handover 9/12/12 - 11/12/12

Checking QC Approval 2/12/12 - 5/12/12

Construction 10/10/12 - 1/12/12

Site Logistics/ Delivery to site 5/10/12 - 9/10/12

Purchase of Steel/ Fabrication 25/8/12 - 11/9/12

Order Fabrics from abroad + store 5/8/12 - 3/10/12

Design Review + Working Drawings 1/8/12 - 20/8/12

Mob Date: 08/01/2012

Expected date of Completion:

12/09/2012

TIMELINE FOR CLIENT

SOLAR STUDY

SITE ANALYSIS

GRAPHICAL PRESENTATIONS

Sun

Wind

Views

FABRICATION PHASE (Workshop)

EXECUTION PHASE (Site)

THANK YOU !!