DESIGN-BUILD OF

THE INDIAN RIVER INLET

CABLE STAYED BRIDGE

Douglass Robb, P.E.IRIB Project ManagerDelDOT Winter WorkshopFebruary 18, 2010

2 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Presentation Overview

Bridge History

Design-Build Proposal

Design Considerations/Challenges

Bridge Features

Questions

3 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge HistoryBridge History (5th Replacement in 75 Years)

1. 1934 Timber bridge – washed away

2. 1938 Concrete and steel swing span, ice flow & extreme tides destroyed

3. 1952 Concrete and steel swing span

4. 1965 Existing steel girder bridge (Widened in 1976)

5. 2008 New Construction Begins

4 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge History

Courtesy of Mr. Jay Erwin Jr

5 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Looking EastScour Hole, 100’+/-

Piers

Stone Armor

Remnants of 1952 Piers

2004 Bathymetric Survey

6 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge History

Is the Bridge Safe to Drive On?

7 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge History

8 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

Who Are We Getting?

9 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

IBT

S&ME

Maunsell

Urban Engineering

RWDI

Contractor:

Designer:

Design/Construction QC:

Sub-consultants:

Freyssinet Inc

Interlock

Aldridge Electric

Sub contractors:

NXL

Sub-consultants:

Who Are We Getting?

10 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

What Are We Getting?

11 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

Lowest Price Proposal Just Under $150M budget

Highest Technical Proposal Score 3 Excellent Proposals

Earliest Proposed Completion Date April 30th, 2011 Open to Traffic (8 months early)

What Are We Getting?

12 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

13 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design-Build Proposal

14 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Bridge Hydraulics and Scour

15 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Bridge Hydraulics and Scour

No foundations in the inlet

Located within Hurricane Zone

Storm surge still estimated 5 feet +/- over F.G.

Coastal Storm Surge Modeling (SWAN)

Coastal Wave Action Modeling (ADCIRC)

100-YR and 500-YR Return Intervals Considered

30 ft and 35 ft scour depths estimated in RFP• Attempted to minimize risk to Proposers

16 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Why Design For Scour?

17 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

18 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

19 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

20 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

21 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

22 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

23 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

24 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

25 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

26 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis

27 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis

Site Specific Wind Profile Developed

RWDI Wind Tunnel Testing Just Recently Completed, Over 50% of Pylon Piles Driven

Initial Design Assumptions and Preliminary Results Validated

28 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis - Sectional Model

29 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis - Aeroelastic Model

30 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind Analysis - Aeroelastic Model

31 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Wind and Weather

32 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

33 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Geotechnical

34 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Geotechnical – Soil Profile

35 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Design Considerations

Geotechnical – Pile Installation Method

36 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Piles

Footings/Substructure

Pylons

Falsework

Superstructure

Form Traveler

Cable Stay System

37 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Pile Details and Pile Driving

38 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Pile Details

39 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

40 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

41 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

42 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

43 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

44 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

45 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

46 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

47 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

48 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

49 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

50 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

51 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

52 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

53 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

54 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

55 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

56 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

57 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Footings and Substructure

58 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

59 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

60 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

61 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

62 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

63 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

64 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

65 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

66 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

67 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

68 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

69 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Pylons

70 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

71 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

72 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

73 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

74 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

75 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

76 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

77 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

78 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

79 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

80 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

81 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

82 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Falsework

83 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

84 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

85 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

86 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

87 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

88 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

89 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

90 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

91 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Superstructure

92 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Typical Section for the ApproachesAASHTO 69” Bulb-T Girders

Bridge Features

93 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

CIP Concrete Edge Girders & Precast and CIP Transverse Floor Beams

Bridge Features

94 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

95 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

96 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

97 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

98 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

99 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

100 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

101 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Form Traveler

102 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

103 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

104 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

105 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

Cable Stay System

106 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

107 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Strands 0.62” Diameter Coextruded HDPE Sheathing Wax Filled

External HDPE Stay Pipe (Blue)

Strands are non bonded and parallel

Strands are individually stressed

Benefits: High fatigue resistance Good geometry control High grade corrosion protection Stays are easy to replace

Bridge Features

108 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Bridge Features

109 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Erect stay pipe and master strand

Bridge Features

110 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager

Conclusion

NTP Issued September 15, 2008

Design is Approximately 95% Complete

Construction is Approximately 40% Complete

Phase II Roadway Work Begins Late Summer 2010

Traffic on Bridge by Spring 2011

Project To Be Completed by Summer 2011

Existing Bridge Demo Late 2011 (Separate Contract)

111 www.irib.deldot.govIndian River Inlet Bridge Design-BuildWinter Workshop - February 18, 2010Doug Robb, DelDOT Project Manager