Delivering South Australia’s transport future, now!

Post on 09-Apr-2017

627 views 1 download

Transcript of Delivering South Australia’s transport future, now!

Delivering South Australia’s

transport Future now

Rod HookChief Executive

Department of Planning, Transport and Infrastructure

SEVEN YEARS AGO:

DPTI Capital Program

0

200

400

600

800

1000

1200

1400

ACTUALS ACTUALS ACTUALS ACTUALS ACTUALS ACTUALS ACTUALS ACTUALS ACTUALS ACTUALS BUDGET BUDGET BUDGET BUDGET BUDGET

01-02 02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-13 13-14 14-15 15-16

$ m

illio

n

Year

28/05/2012

north south corridor – south road superway

Southern Expressway

Duplication

Bedford

Park

Adelaide

Old

Noarlunga

Electrified Rail

• Main corridor Noarlunga/Seaford

Seaford Rail Extension

• 5.7km of broad gauge dual track including:

• Stations and Park and Ride facilities at Seaford & Seaford Meadows

• 1.2km elevated bridge over the Onkaparinga River and River Road

• Rail bridge over Old Honeypot Road

• Road bridges over the track at Goldsmith Drive, Seaford Road and Lynton Terrace

Seaford

Seaford

Safer Roads

Regional Infrastructure:

Corridors and Utility Hubs

Source: Consultation paper on RESIC recommendations

to the SA Government (February 2012)

Proposed City Tram Loop

Bus Lanes –A Step Towards a Vibrant City

Closure of median openings preventing U-

turns and right turns

Bus Lanes City Precinct – Towards a Vibrant City

Bicycle LanesPainted lanes - past Protected lanes - future

Thank you