For all the effort we endure in designing high availability systems, concurrently maintainable infrastructures, and all the other “mission critical” details we add to a facility design, one element remains and that is the location.
Geographical Influences and Environmental Risks• Seismic activity • Volcanoes • Flood Plain
And don’t forget...• Architectural features and constraints • Equipment ingress and egress • Water supply
• The building is a single point of failure for all apps and data inside it • You can’t pick up the building and move it
These should be at least 8 miles (13km) away from the data center:• Minor Airports (propeller and light
aircraft only• Military bases
These should be at least 2 miles (3.2km) away:
These should be at least 1 mile (1.6 km) away:• Self storage facilities• High-voltage power
distribution lines• Water storage towers
• Major highways• Inland harbors/
canals
• Railways• Lakes , Dams,
reservoirs
These should be at least 5 miles (8km) away:• Major Airports• Conventional fossil fuel
power plants• Other smokestick
industry operations
These should be at least 3 miles (5km) away:• Embassies• Research Laboratories• Weather or other radar
installations
Bob’s tips!• Adjacent tall buildings• Man holes• Subways
Good things to have nearby:• Fire station• Police station• Hospital emergency room