Post on 21-Aug-2020
-
-
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=60'
60 1200
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
11/22/2017
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\PDU_MSH_PP_012_003_PLN-01.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PRELIMINARY CONCEPT
REALIGNMENT OF ROUTE 6TOWN OF BOLTON
CONCEPTUAL DRAWINGEXISTING CONDITIONS
83
CO
OR
DIN
AT
E
GRID
AD
CO
NN
EC
TIC
UT
ROUTE 44 EASTBOUND
HOP RIVER STATE PARK TRAIL
HOP RIV
ER STATE P
AR
K TR
AIL
NOTC
H
RO
AD EXTENSIO
NN
OT
CH
RO
AD
ROUTE 6 EASTBOUND
ROUTE 6/
44 E
ASTBOUND
BRIDGE NO. 00484
BRIDGE NO. 04137
R=528', ACCEPTABLE FOR 40 MPH
EXISTING ROUTE 6 CURVE
NOTCH ROAD
SIGHT LINES FOR
OBSTRUCTING
ROCK OUTCROPPING
WARNING SIGN
INTERSECTION
FLASHING "T"
PP_012_003
PLN-01AND NOTCH ROAD,CONST. OF SHARED USE PATH
QUARRY
APARTMENTS
EXISTING CONDITIONS
TOWN OF BOLTON
THE HOP RIVE TRAIL TO QUARRY ROAD
SHARED USE PATH CONNECTING
AND THE CONSTRUCTION OF A
REALIGNMENT OF ROUTE 6 AND NOTCH ROAD
PROPOSED PROJECT 12-003 (PP_012_003)
-
-
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=60'
60 1200
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
11/22/2017
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\PDU_MSH_PP_012_003_PLN-02a.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PRELIMINARY CONCEPT
REALIGNMENT OF ROUTE 6TOWN OF BOLTON
CONCEPTUAL DRAWINGALL PROPOSED WORK
NO
TC
H
RO
AD
ROUTE 6 EASTBOUND
ROUTE 44 EASTBOUND
NOTC
H
RO
AD EXTENSIO
N
ROUTE 6/
44 E
ASTBOUND
HOP RIV
ER STATE P
AR
K TR
AIL
HOP RIVER STATE PARK TRAIL
CUTBACK ROCK OUTCROPPING
BRIDGE NO. 00484
TO BE REMOVED
ROUTE 6 EASTBOUND
TO BE REMOVED
BRIDGE NO. 04137
PP_012_003
PLN-02
DECEMBER 2017
AND NOTCH ROAD,CONST. OF SHARED USE PATH
FILL
CUT
BITUMINIOUS CONCRETE DRIVE
BITUMINIOUS TO BE REMOVED
LEGEND
PROPOSED MILL AND FILL
BRIDGE TO BE REMOVED
FORMER RAILROAD RIGHT-OF-WAY
EXISTING STRUCTURE
RELOCATION OF NOTCH ROAD
REALIGNMENT OF ROUTE 6 AND
PROPOSED PROJECT 12-003 (PP_012_003)
#118
SNET
10+00
11+00
12+00
13+0014+00
15+00 16+00 17+0018+00
19+00
20+0021+00
22+0023+00
24+0025+00 26+00 27+00
28+00
29+00
PLN-03MLW
GAM TOWN OF BOLTON
PLAN SHEET
SHARED USE PATH
54" VERTICAL BARRIERRESTRIPE ROADWAY
2" MILL AND FILLFULL DEPTH RECONSTRUCTION
SHIFT ROADWAY INTO MEDIAN
RETAINING WALL
54" VERTICAL BARRIER
(POSSIBLE - DEPENDING ON SLOPE)
RETAINING WALL
EXISTING DRIVE
CONNECTION TO
20+0021+00
22+0023+00
24+0025+00 26+00 27+00
28+00
29+00
MA
TC
H
MA
RK
SE
E S
HE
ET PL
N - 3
26+00
20+0021+00
22+0023+00
24+0025+00 27+00
28+00
29+00
54" VERTICAL BARRIERSHARED USE PATH
FULL DEPTH RECONSTRUCTION
SHIFT ROADWAY INTO MEDIAN
RESTRIPE ROADWAY
2" MILL AND FILL
54" VERTICAL BARRIER SPLIT RAIL FENCE
MA
TC
H
MA
RK - 1
MA
TC
H
MA
RK - 1
REALIGNMENT OF ROUTE 6PP_012_003
AND NOTCH ROAD,CONST. OF SHARED USE PATH
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
11/22/2017
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\PDU_MSH_PP_012_003_PLN-03.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PRELIMINARY CONCEPT
DECEMBER 2017
FENCE
SPLIT RAIL
TUNNEL
EXISTING RAIL
METAL BEAM RAILMETAL BEAM RAIL
METAL BEAM RAILMETAL BEAM RAIL
RECONSTRUCTION
FULL DEPTH
SHIFT ROADWAY
SHARED-USE PATH
14+00
10+00
11+00
12+00
13+00
15+00 16+00 17+0018+00
19+00
(HOP RIVER TRAIL TO QUARRY ROAD)
CONSTRUCTION OF A SHARED-USE PATH
PROPOSED PROJECT 12-003 (PP_012_003)
29+0030+00
31+00 32+00
33+00
34+00
35+00
36+00
30+0031+00 32+00
33+00
34+00
3+000
3+612
3
MLW
PLN-04
TOWN OF BOLTON
30+00
31+00 32+00
33+00
34+00
35+00
36+0036
+1236
+12
SHARED USE PATH
AND IMPROVE SIGHTLINE
SHORTEN CROSSING
NARROW LANES TO
RESTRIPE ROADWAY
2" MILL AND FILL
SLIP RAMP TO ACCEPT ON-ROAD BICYCLESSHARED USE PATH
SPLIT RAIL FENCE
FULL DEPTH RECONSTRUCTIONSHIFT ROADWAY
54" VERTICAL BARRIER
CROSS ROUTE 44 EASTBOUND
CROSS ROUTES 44 WESTBOUND
MA
TC
H
MA
RK
SE
E S
HE
ET P
LN - 2
MA
TC
H
MA
RK
SE
E S
HE
ET P
LN - 2
PLAN SHEET
SHARED USE PATH
54" VERTICAL BARRIER
FULL DEPTH RECONSTRUCTIONSHIFT ROADWAY
TO ACCOMIDATE SHARED USE PATHSHIFT ROADWAY
RESTRIPE ROADWAY
2" MILL AND FILL
TO INCREASE SHOULDER WIDTHSHIFT LANES
ALTERNATE 1
ALTERNATE 2
PP_012_003
PEDESTRIAN MODIFICATIONSACCOMIDATE SIGNAL AND RECONFIGURE ISLAND TO
GUIDERAIL
GUIDERAIL
SPLIT RAIL FENCE
ALT 1 AND ALT 2
REALIGNMENT OF ROUTE 6
CONST. OF SHARED USE PATH AND NOTCH ROAD,
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
11/22/2017
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\PDU_MSH_PP_012_003_PLN-03.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
PRELIMINARY CONCEPT