Post on 17-Sep-2019
U
A
T
D
O
B
A
U
A
T
S
A
T
U
M
A
R
E
SATMAREL
Tronson I - Camin existent Satmarel (AD1) -
Racord GA Gelu (N28)
Tronson I - Camin existent Satmarel (AD1) -
Racord GA Gelu (N28)
Tronson I - Camin existent Satmarel (AD1) -
Racord GA Gelu (N28)
UAT SATU MARE
Supratraversare rau Homorodul Vechi (SPR1), pentruconducta de aductiune din PEID, PE100, De 315 mm
termoizolata, L = 23.5 m
Subtraversare podet (SV1) cu foraj orizontaldirijat, pentru conducta de aductiune apa potabiladin PEID, PE100, De315 mm in tub de protectie
din OL Dn508x7,9mm, L=6,0 m
Subtraversare podet (SV2) cu foraj orizontaldirijat, pentru conducta de aductiune apa
potabila din PEID, PE100, De315 mm in tubde protectie din OL Dn508x7,9mm, L=5,0 m
Subtraversare drum (SDA1) prin sapaturadeschisa, pentru conducta de aductiune apa
potabila din PEID, PE100, De315 mm in tub deprotectie din OL Dn508x7,9mm, L=14,50 m
Cu1
Cu3
Cu4
Cu7
CVG1
CA2
Ht1
CG5
CVG3
CG4
CVA1
CA1
CG1
CVG2
CG2
CG3
CA3
Ht2
P
E
I
D
P
N
1
6
D
e
3
1
5
m
m
PE
ID
P
N16 D
e315 m
m
PE
ID
P
N16 D
e315 m
m
P
E
I
D
P
N
1
6
D
e
3
1
5
m
m
Subtraversare viroaga (SV3) prin sapatura deschisa, pentru conductade aductiune apa potabila din PEID, PE100, De315 mm in tub de
protectie din OL Dn508x7,9mm, L=7,0 m
VA1
Tronson I - Camin existent Satmarel (AD1) -
Racord GA Gelu (N28)
P
E
I
D
P
N
1
6
D
e
3
1
5
m
m
AD1
AD1'
AD1''
D
J
1
9
4
.
2
D
J
1
9
4
.2
D
J
1
9
4
.2
D
J
1
9
4
.
2
D
J
1
9
4
.
2
N15
LEGENDA SITUATIA PROIECTATA:
LEGENDA SITUATIA EXISTENTA:
Limita UAT
Camin cu robinet de sectionare si golireCVG
Camin de aerisire CACamin cu robinet de sectionare si aerisireCVA
Camin masurare a debitelorCMDCamin uscatCu
Camin cu robinet de sectionare CVCamin de golire CG
Subtraversari
Camin de observatieCco
Conducta de aductiune apa bruta / potabila - extindereImprejmuire
VA Ventil de aerisire-dezaerisire
Supratraversari
Nod de delimitare Strazi / Tronsoane N275
Linie de racordare cuSM - CL2.1 - SF - SS - AC - PG - 002
SM-CL2.1-SF-SS-AC-PG-001
SCHEMA PLANSELOR
SM-CL2.1-SF-SS-AC-PG-002
SM-CL2.1-SF-SS-AC-PG-003SM-CL2.1-SF-SS-AC-PG-004
SM-CL2.1-SF-SS-AC-PG-005
SM-CL2.1-SF-SS-AC-PG-006
SM-CL2.1-SF-SS-AC-PG-007
SM-CL2.1-SF-SS-AC-PG-008
SM-CL2.1-SF-SS-AC-PG-009
SM-CL2.1-SF-SS-AC-PG-010
REGIONAL DEVELOPMENT PROJECT OF WATER AND WASTEWATER INFRASTRUCTUREIN SATU MARE COUNTY / NORTH - WEST REGION, IN 2014 - 2020
Proiect:Project:
Beneficiary:Beneficiar:
Designer:Proiectant:
REGIONAL DE DEZVOLTARE A INFRASTRUCTURII DE APASI APA UZATA DIN JUDETUL SATU MARE / REGIUNEA NORD - VEST, IN PERIOADA 2014 - 2020
S.C. APASERV SATU MARE S.A.
ROMAIR CONSULTING S.R.L.
Designed / ProiectatDrawn / DesenatProject Manager / Sef proiect imprumutarea documentatiei fara aprobarea
It is prohibited to copy, multiply or print thisdocument without written approval of ROMAIR
scrisa a ROMAIR CONSULTING
Scale / Scara: Date / Data: Phase / Faza:1:5000 Feasibility Study
Cod proiect / Project code:
513-13-16/04.2015
CONSULTINGEste interzisa copierea, multiplicarea si
Revision no./Date / Revizia nr./Data : Object of the revision / Obiectul reviziei: Signature / Semnatura:
Large Infrastructure Operational Programme 2014 - 2020Programul Operational Infrastructura Mare 2014 - 2020
Corp 3 parter,Corp 3 etaj 1, si birourile 3, 4, 5 si 6 din Corp 5 etaj 3
Drawing No. / Nr.desen:
SM-CL2.1-SF-SS-AC-PG-001
R1
r Iunie/June2018
ing. Emilia Timofte
ing. Emilia Timofte
ing. Alexandru Pavel