PROJECTS PORTFOLIO
Project Title : EPC For Upgrade of Wellhead Control and Safety Systems for Thamama ‘C’ OGD-0 & OGD-1 Gas Producers
Client Name & Address : Abu Dhabi Company of Onshore Oil Operations –ADCO, Abu Dhabi
Contact Name & Designation : Mr. Ali Cherad, Project Manager
Telephone & Fax No. : +971-2-6043590, +971-2-669767
Location : Abu Dhabi, UAE
Owner : ADCO – Abu Dhabi
Description of Works : Upgrade of 30 Nos. of wellhead control system and safety system. Main scope of work includes:
Demolition of some of the existing facilities
Relocation of some of the existing facilities
Engineering, Procurement and Construction of following:
HIPPS system
Wellhead control system
Instrument Packages including Fire and Gas instruments
Piping
Civil
Testing and Pre-commissioning
Commissioning Assistance
Man-hours : 1.5 million
Peak Labour Force : 350
Contract Award Date : August 28, 2006
Project Commencement Date : August 28, 2006
Completion Date : April 2008
Contract Value : USD 34.25 Million
PROJECTS PORTFOLIO
Project Title : Zamzama Gas Field Development Phase-2
Client Name & Address : BHP Billiton Petroleum Pty Ltd.
180 Lonsdale Street, Melbourne VIC 3000 Australia
Contact Name & Designation : Mr. Ather Siddiqui – Project Director
Telephone & Fax No. : +613 9652 6313 Fax: +613 9652 6134
Owner / Operators : BHP Petroleum
Location : Dadu (Sindh)
Description of Works : Electro-mechanical works, tanks structure fabrication & erection, machinery equipment erection.
Major Quantities : Steel Structure Fabrication/Erection : 450 Tons
Equipment Installation : 1,200 Tons
Piping : 53,000 ID
Painting : 12,000 Sq.M
Insulation : 2,300 Sq.M
Cross Country Pipeline (6” dia) : 30 km
Installation of Electrical Equipment :
Cable Installation :
Cable Termination :
Testing & Commissioning :
Man-hours : 1.0 million
Contract Award Date : August 28, 2006
Project Commencement Date : August 29, 2006
Completion Date : October 2007
Contract Value : US$ 9.65 Million
PROJECTS PORTFOLIO
Project Title : Thamama C, F, Units 6 & 7 Gas Wells Tie-InClient Name & Address : National Petroleum Construction Company (NPCC),
P.O. Box 2058, Abu Dhabi, UAE
Contact Name & Designation : Mr. Divakaran Nair, Project Manager
Telephone & Fax No. : +971-2-554 9000 Fax: +971-2-554 9111
Owner : ADCO
Location : UAE
Description of Works : Construction of flow lines from Bb 562 & Bb 563 to TH, C, Area 10, including associated civil works.
Contract Award Date : April 28, 2004
Project Commencement Date : April 2004
Completion Date : May 2005
Contract Value : US$ 2.02 million
PROJECTS PORTFOLIO
Project Title : 80 mmscfd Rehmat Gas Field DevelopmentClient Name & Address : Petronas Carigali (Pte) Ltd.
Contact Name & Designation : Mr. Abdul Malik Jaffer, Project Manager
Telephone & Fax No. :
Location : Sindh, Pakistan
Consultant / Designer : Presson-Descon
Owner / End User : Petronas Carigali (Pte) Ltd.
Description of Works : Engineering, Procurement, Fabrication, Construction and Commissioning of Gas Processing Facilities including raw gas flow lines, Inlet Separation, Amine Sweetening, Silica Gel based Water and Hydrocarbon Dew Point Control, Acid Gas Incineration, Hot Oil Heater and all Plant Utilities.
Contract Award Date : April 2004
Project Commencement Date : April 2004
Completion Date : April 2005
Contract Value : US$ 38 million
PROJECTS PORTFOLIO
Project Title : 50 mmscfd Gurguri Gas PlantClient Name & Address : MOL Pakistan Oil & Gas Co. B.V.
Contact Name & Designation : Jawed Sarwar, Country Manager
Telephone & Fax No. : +92-51-2827177 Fax: +92-51-2820113
Location : NWFP, Pakistan
Consultant / Designer : Presson-Descon
Owner / End User : MOL Pakistan
Description of Works : Engineering, Procurement, Fabrication, Construction and Commissioning of Gas Processing Facilities including raw gas flow lines, Inlet Separation, Turbo Expander, Glycol based Dehydration and Complete Plant Utilities.
Contract Award Date : April 2004
Project Commencement Date : April 2004
Completion Date : January 2005
Contract Value : US$ 12 million
PROJECTS PORTFOLIO
Project Title : Ethane Recovery MaximizationClient Name & Address : Fluor Corporation – P. O. Box 46858, Abu DhabiContact Name & Designation : Mr. Mike Sahakian – Project ManagerTelephone & Fax No. : +971-2-631 6900 Fax: +971-2-631 1660Owner : GASCOLocation : Habshan, UAE
Description of Works : Complete civil, mechanical, electrical and instrumentation works. This includes, erection of stationary / rotary equipments, piping fabrication / erection, steel structure fabrication construction. Civil foundation, painting, insulation, fire proofing, electrical / instrumentation works and Tie-Ins.
Major Quantities : Excavation : 2,500 Cu.MConcrete : 700 Cu.MPaving : 700 Cu.MEquipment : 675 TonsPiping : 18,500 dia InchSupports : 21 TonsInsulation : 4,000 Sq.MPainting : 15,000 Sq.MCables : 26,500 MCable Trays : 2,750 MSupports : 10,500 Kgs.
Man-hours (Direct) : 0.30 millionPeak Labour Force : 200
Contract Award Date : July 2003Project Commencement Date : July 2003Completion Date : November 2004Contract Value : US$ 7.4 million
PROJECTS PORTFOLIO
Project Title : Zamzama Gas Field Development – Phase-1Client Name & Address : BHP Billiton Petroleum Pty Ltd.
600 Bourke St., Melbourne VIC 3000, Australia
Contact Name & Designation : Mr. Ather Siddqui - Project Manager
Telephone & Fax No. : +92-51-264795, 264796 Fax: +92-51-252985
Location : Zamzama / Dadu
Owners / Operators : BHP Petroleum
Consultant / Designer : Kvaerner – Australia and NESPAK – Pakistan
Description of Works : Plant site earth works, roads, drainage & fencing. Construction of aerodrome 1600m length.
Construction of accommodation, substation, plant room, air-conditioning workshop & visitor center buildings.
Supply & installation of reinforced concrete pipe drain. Supply, fabrication & installation of small bore carbon steel pipe drains & construction of precast sleepers.
Major Quantities : Earthworks : 210,000 Cu.MAsphaltic Concrete : 100,000 Sq.m R.C.C : 3,000 Cu.MRebar : 341 TonsForm Work : 7,500 Sq.m
Man-hours : 0.5 millionPeak Labour Force : 280
Contract Award Date : April 2002Project Commencement Date : April 2002Completion Date : October 15, 2003Contract Value : US$ 4.23 million
PROJECTS PORTFOLIO
Project Title : Sawan Gas Field Development Project, Phase I & IIClient Name & Address : Clough Engineering Limited – Australia
Contact Name & Designation : Mr. Russell Waugh – Project Manager
Telephone & Fax No. : +61-8-9281 9000 Fax: +61-8-9485 2326
Location : Khairpur, Sind
Owner : OMV Pakistan (Pvt.) Limited
Description of Works : Electrical and Instrumentation Installation.
Major Quantities : Electrical Panel (all kinds) : 180 Nos.
Transformers : 07 Nos.
Cable Trays : 16,775 M
Lighting Fixture : 342 Nos.
Earthing and Cathodic Protection : 3,642 Nos.
Cable Laying : 156,512 M
Cable Termination : 1,896 Nos.
Cable Laying and Termination : 166,900 M
Instrument Panels and Cabinets : 243 Nos.
Field Instrumentation (Installation) : 315 Nos.
Field Instrumentation : 164 Nos.(Calibration & Test)
Man-hours : 0.215 millionPeak Labour Force : 270
Contract Award Date : October 20, 2002
Project Commencement Date : December 2002
Completion Date : September 30, 2003
Contract Value : US$ 0.84 million
PROJECTS PORTFOLIO
Project Title : Sawan Gas Field Development Project, Phase I & IIClient Name & Address : Clough Engineering Limited – Australia
Contact Name & Designation : Mr. Russell Waugh – Project Manager
Telephone & Fax No. : +61-8-9281 9000 Fax: +61-8-9485 2326
Location : Khairpur, Sind, Pakistan
Owner : OMV Pakistan (Pvt.) Limited
Description of Works : Equipment, piping and steel structure works for 2x175 mmscfd green-field gas processing plant comprising of 2 trains phase 1 & phase II. Installation of CO2 / H2S Absorber and stripper columns, vessels drums, exchanger’s, filters, incinerators, scrubbers, receivers, package units, vent stack internals installation, furnaces, tanks, pumps, fans and allied piping and structure.
Major Quantities : Piping Erection : 56,916 dia inch
Structure Erection : 486 Tons
Equipment Erection : 3,532 Tons
Touch up Painting : 9,250 Sq.m
Man-hours : 0.5 millionPeak Labour Force : 500
Contract Award Date : September 10, 2002
Project Commencement Date : September 2002
Completion Date : October 20, 2003
Contract Value : US$ 2.84 million
PROJECTS PORTFOLIO
Project Title : Sui Gas Compression Project Phase 3Client Name & Address : Foster Wheeler Energy Limited, Procurement Group,
Shinfield Park, Reading, Berkshire, RG2 9 FW, UK
Contact Name & Designation : Mr. D. Stoker – Project Manager
Telephone & Fax No. : +44 (0) 118 913 1234 Fax: +44 (0) 118 913 2333
Location : Sui, Balochistan
Owner : Pakistan Petroleum Limited
Description of Works : Mechanical, Electrical & Instrumentation (including Minor Civil) Works.
Mechanical- Installation of six interstage knock out drums, six heat
exchangers, support for the installation of six HP compressor casings, painting and erection of steel cooler and piping insulation.
E&I- Electrical supplies and control stations for two new 15
KW airfin exchangers motor per train, electrical supplies to two electric trace heating circuit for 14” line. Addition of lighting and small power in airfin, knock out drum, compressor H P casing and new oil overhead tank structure area for trains A-F,. installation of substation cable between MCC’s and 24 V and 110 V marshalling cabinets. Testing and commissioning of all equipment.
Civil- Construction of minor foundations, repair of existing
foundations for pipe supports and platforms, installation holding down bolts for minor platforms, ladders and pipe supports.
Man-hours : 0.16 million
Peak Labour Force : 275
Contract Award Date : September 2002
Project Commencement Date : October 2002
Completion Date : September 30, 2003
Contract Value : US$ 1.27 million
PROJECTS PORTFOLIO
Project Title : Mazarani Gas Field DevelopmentClient Name & Address : Pakistan Petroleum Limited
6th Floor, PIDC House, Dr. Ziauddin Ahmed Road Karachi
Contact Name & Designation : Mr. Maqsood Toor - Project Manager
Telephone & Fax No. : +92-21-5681366 Fax: +92-21-5682125
Operator : Pakistan Petroleum Limited
Location : 100 KM West of Larkana, Sindh
Description of Works : Engineering, Procurement, Construction and Commissioning (EPCC).
Basic design, detail engineering, procurement, manufacturing, construction, installation and commissioning of 12 mmscfd gas processing plant comprising of slug catcher, gas compression system, amine sweetening plant, gas dehydration plant, gas metering system, flare system, power generation and other offsite facilities.
Major Quantities : Excavation : 5,130 Cu.MConcrete : 700 Cu.MEquipment : 285 TonsFab. & Erec .of Tanks : 105 TonsFab. & Erec. of Piping : 10,000 dia. InchStructure : 75 TonsInsulation : 820 Sq.MPainting : 5,010 Sq.MPanels : 17 Nos.Trays / Conduits : 1,030 MCable Laying : 48,210 MField Instruments : 416 Nos.Tubing / Piping : 225 MSupports : 10 Tons
Man-hours (Direct) : 0.25 million
Peak Labour Force : 255
Contract Award Date : May 2002
Completion Date : February 2003Contract Value : US$ 5.5 million
PROJECTS PORTFOLIO
Project Title : Bhit Gas Field DevelopmentClient Name & Address : LASMO Oil Pakistan Limited
Contact Name & Designation : Mr. M. White - Contracts Manager
Telephone & Fax No. : +92-21-5879951 Fax: +92-21-5838490
Location : Bhit, Sehwan (Sind), Pakistan
Operators : LASMO Oil Pakistan Limited
Consultant / Designer : Snamprogetti / Aquater
Description of Works : Site Preparation, Main Civil Works and Electrification.
Major Quantities
: Grading & Compaction: 550,000 Sq.MEarthwork : 235,000 Cu.MConcrete : 16,600 Cu.MRebar : 834 TonsFormwork : 28,300 Sq.MUnderground Piping : 8,500 MWater Proofing : 38,000 Sq.MAsphalt Concrete : 32,500 Sq.MFencing : 7,000 MPower Cables : 10,000 MLighting Fixtures : 300 Nos.Panels, DB’s, UPS : 25 Nos.
Man-hours : 1.3 millionPeak Labour Force : 570
Contract Award Date : March 2001Completion Date : January 2003Contract Value : US$ 5.8 million
PROJECTS PORTFOLIO
Project Title : Bhit Gas Field DevelopmentClient Name & Address : LASMO Oil Pakistan Limited – 5th Floor, the Forum,
Khayaban-e-Jami, Clifton, Karachi
Contact Name & Designation : Mr. M. White - Contracts Manager
Telephone & Fax No. : +92-21-5879951 Fax: +92-21-5838490
Location : Bhit, Sehwan (Sind), Pakistan
Operators : LASMO Oil Pakistan Limited
Consultant / Designer : Snamprogetti / Aquater
Description of Works : Pipeline construction comprising of civil, mechanical and E&I works including cathodic protection and fiber optic cable installation for Bhit Gas Field Gathering System between the well-head facilities and the main process plant.
Major Quantities : Trench Excavation : 46,300 Cu.M
Right of Way : 45,000 Cu.M
Backfilling : 16,200 Cu.M
Gathering Line 24” dia : 22,150 M
Flow Lines (07 Nos. 10” dia) : 6,500 M
Water Line 4” dia : 1,550 M
Fiber Optic Cable Laying : 28,600 M
Flow Line Tie-Ins : 07 Nos. of Wells
Man-hours : 0.9 million
Peak Labour Force : 680
Contract Award Date : December 2001
Project Commencement Date : January 2002
Completion Date : January 2003
Contract Value : US$ 3.0 million
PROJECTS PORTFOLIO
Project Title : Kadanwari Upgrade & Miano Gas Field DevelopmentClient Name & Address : OMV Pakistan (Pvt.) Limited
6th Floor, UBL Building, Jinnah Avenue, Islamabad
Contact Name & Designation : Mr. David Morgan - Project Manager
Telephone & Fax No. : Tel: +92-51-273620-31 Fax: +92-51-273643-4
Operator : OMV Pakistan (Pvt.) Limited
Location : 25 KM from Kadanwari
Description of Works : Engineering, Procurement, Construction and Commissioning (EPCC).
Development of 3 welhead areas, namely Khipro-1, Miano-2 & Miano-5, upgradation of existing Kadanwari Plant by installation of new Reception facilities and Pre-treatment units alongwith their integration with the existing plant receiving 200 mmscfd of Miano Sales Gas Through 45 km long carbon steel pipelines.
34.5 km, 16” dia. Pipeline (API 5Lx52, 16.0 mm wall thickness)
10.5 km, 12” dia. Pipeline (API 5Lx52, 14.0 mm wall thickness)
Man-hours (Direct) : 1.56 million
Peak Labour Force : 450
Contract Award Date : April 1999
Completion Date : December 2001
Contract Value : US$ 17 million
PROJECTS PORTFOLIO
Project Title : GASCO Ruwais Facilities Up-gradation ProjectClient Name & Address : Technip, France
Contact Name & Designation : Mr. Jean – Christophe Huges, Subcontracts Manager
Telephone & Fax No. : +971-2 - 343778 Fax: +971-2-331264
Location : Ruwais, UAE
Owner : GASCO, UAE
Consultant / Designer : Technip, France
Description of Works : Civil and Mechanical works including Shutdowns.
Entire civil and mechanical works including design / construction of substation, revamping of existing Train-I & II, fabrication / erection of piping pipe supports equipment, structure, painting, insulation fire proofing, assembling and installation of stack etc including complete installation of SRU (Sulphur Recovery Unit).
Major Quantities : Earthwork : 59,500 Cu.MConcrete : 9,500 Cu.MRebar : 384 TonsFire Proofing : 9,400 Sq.MRoads : 15,800 Sq.MEquipment : 1,800 TonsPiping : 1,900 TonsPipe Support : 100 TonsSteel Structure : 1,470 TonsPainting : 32,630 Sq.MInsulation : 17,090 Sq.MTotal Shutdowns : 04 Nos. Shutdown # 1 & 2 : 14 Days EachShutdown # 3 & 4 : 05 Days Each
Man-hours : 2.0 millionPeak Labour Force : 700
Contract Award Date : May 2000Project Commencement Date : June 2000Completion Date : December 2001Contract Value : US$ 17.6 million
PROJECTS PORTFOLIO
Project Title : Borouge Petrochemicals Project – Polyethylene PlantClient Name & Address : Tecnimont S.p.A – Milan, Italy
Contact Name & Designation : Mr. F. Chiruttini – Construction Manager
Telephone & Fax No. : +390-2-6313-9535 Fax No. +390-2-6313-9244
Location : Ruwais, Abu Dhabi
Owner : Abu Dhabi Polymers Company Limited (Borouge)
Description of Works : Mechanical erection of equipment & steel structure. Piping works including fabrication, supply & erection of pipe supports. Instruments Installation and Painting.
Major Quantities : Equipment : 4,905 Tons
Pipe supports : 225 Tons
Piping fabrication : 110,000 dia inch
Piping erection : 66,200 M
Steel structure : 2,600 Tons
Erection of aluminum silos : 905 Tons
Painting : 22,500 Sq.M
Man-hours : 2.4 million
Peak Labour Force : 980
Contract Award Date : May 2000
Project Commencement Date : May 2000
Completion Date : October 2001
Contract Value : US$ 13 million
PROJECTS PORTFOLIO
Project Title : 70 mmscfd Zamzama Gas Field Facilities - EWTClient Name & Address : BHP Petroleum (Pakistan) Pty Ltd. – 4 Nazimuddin
Road, F-8/1, Islamabad, Pakistan
Contact Name & Designation : Mr. Ather Siddqui - Project Manager
Telephone & Fax No. : +92-51-264795, 264796 Fax: +92-51-252985
Location : Zamzama / Dadu
Owners / Operators : BHP Petroleum
Consultant / Designer : Kvaerner - Australia for Process Plant & Worley - Australia for Pipeline
Description of Works : Electro-mechanical construction, plant commissioning, sales gas pipeline and the gas gathering flowline system.
The pipeline and flowline system comprised of:
12” diameter, 10.3 mm and 12.7 mm wall thickness, carbon steel sales gas pipeline, designed for 900 # class system, with total length of about 9 km.
8” diameter, 8.2 mm wall thickness, weldable 12% chromium steel flowline, designed for 1500 # class system, with total length of about 3.5 km.
The pipeline and flowline crossed one large canal, forty-two waterways and one major and six minor road crossings along the Right of Way that also had quite a few bends of various angles.
Major Quantities : Equipment : 445 Tons(Electro-mechanical works) Steel Structure : 65 Tons
Pipe Fabrication : 50 TonsPiping Erection : 100 TonsPainting/Blasting : 3,200 Sq.mInsulation : 400 Sq.m
Man-hours : 0.20 millionPeak Labour Force : 320
Contract Award Date : September 27, 2000Project Commencement Date : October 02, 2000Completion Date : March 2001Contract Value : US$ 1.30 million
PROJECTS PORTFOLIO
Project Title : 826 mmscfd ASAB Gas Development (AGD)Client Name & Address : Snamprogetti, Italy / Hyundai, Korea
Contact Name & Designation : Mr. K. J. Yoo - Project Manager
Telephone & Fax No. : +971-2-317748 Fax: +971-2-317898
Location : ASAB, UAE.
Description of Works : Mechanical and electrical erection comprising of:
Major Quantities : Structural erection : 5,118 Tons
Equipment erection : 8,600 Tons
Boiler erection : 1,416 Tons
Tanks erection : 1,800 Tons
Piping : 5,500 Tons
Pipe supports : 400 Tons
Painting : 208,000 Sq.M
Insulation : 34,000 Sq.M
Cable laying : 1,225,000 M
Cable termination : 35,000 Nos.
Cable trays : 100,000 M
Conduit : 26,000 M
Lighting : 2,100 Nos.
Earthing accessories : 1,721 Nos.
Man-hours (Direct) : 2.50 million
Peak Labour Force : 980
Contract Award Date : July 1998
Project Commencement Date : August 1998
Completion Date : August 2000
Contract Value : US$ 24.4 million
PROJECTS PORTFOLIO
Project Title : 180 mmscfd Kadanwari Gas FieldOwner : Lasmo Oil Pakistan.
Client Name & Address : Foster Wheeler - Foster Wheeler House Station Road Reading Berkshire RG1 1LX,U.K
Contact Name & Designation : Mr. Roland Davies, Project Manager (Foster Wheeler UK)
Telephone & Fax no. : +92-21-572767 Fax: +92-21-570056 (Karachi)
Description of Works : Complete Electro-mechanical Erection, Preparation of Fabrication Drawings and Piping Isometrics, Structural Steel Work, Process & Utility Piping, Fabrication, Erection, Insulation, Painting and Fire Proofing.
Major Quantities : Rotary Equipment : 500 Tons
Stationary Equipment : 1,900 Tons
Steel Structure : 500 Tons
Piping : 2500 Tons
Pipe Support : 220 Tons
Painting : 30,000 Sq.M
Insulation : 4,000 Sq.M
Tanks : 200 Tons
Total man-hours : 1.2 million
Peak labour force : 900
Contract Award Date : March 1994
Project Commencement Date : July 1994
Completion Date : September 1995
Contract Value : US$ 8.8 million
PROJECTS PORTFOLIO
Project Title : 195 mmscfd Qadirpur Gas FieldClient Name & Address : Oil & Gas Development Corporation (OGDC)
Contact Name & Designation : Dr. M. Rafique Sheikh - Actg. General Manager (Process)
Telephone & Fax no. : +92-51-8500259 Fax: +92-51-858939 (Islamabad)
Description of Works : Engineering, Fabrication & Complete Civil and Electro-mechanical Construction.
Major Quantities : Earthworks : 142,068 Cu.M
Concrete : 12,970 Cu.M
Rebar : 1,120 Tons
Rotary Equipment : 500 Tons
Stationary Equipment : 1,700 Tons
Piping : 2,000 Tons
Pipe Support : 50 Tons
Painting : 31,000 Sq.M
Steel Structure : 700 Tons
Total man-hours : 2.7 million
Peak labour force : 1,200
Contract Award Date : April 1994
Project Commencement Date : April 1994
Completion Date : August 1995
Contract Value : US$ 10.6 million