Post on 30-Nov-2014
description
COST BENEFIT ANALYSIS OF URBAN TREE MANAGEMENT
IN GOIANIA
Ricardo Magno Senior Project Manager
ricardo.magno@prbambiental.com.br
Population
1.3 million
.5 million
Precipitation
Goiânia
London
Death Valley
950 000 trees in the streets
and…
328 different species
+500 trees fell down in 2011
Street Tree Master Plan
• Duration of 10-20 years• Sample inventory:• 38 874 seedlings• 5% tree removal
• operational procedures • 13 pg of testimonials (?!)
http://www.goiania.go.gov.br/shtml/amma/pdau.shtml
Project Analysis
Project
Risk
EconomicalFinancial Economical
Determine Program
Objectives
Enumerate Alternatives
Recognize Constrains
Methodology
• Research & Development (R&D) and overhead power lines upgrades (20%)
• Tree trimming residue compost (1%)• Air conditioning energy savings (8%)• Real estate added value (62%)• Eradicate tree fall (8%)
Benefits
• Seedlings plantation (30%)• Tree removal (35%)• Stump grinding and sidewalk reconstruction
(35%)• Seedling irrigation (0%)
Costs
Discount rate
USA
0.75%1996 2012
1
Effect of the discount rate
30
0.78
+20 years
rate: 20%
4.46rate: 10%
Cost Benefit
R$ 52 000 000
R$ 30 000 000
Benefit–cost ratio
1.71
>1
<1
More information
Parameter Value MeaningCost Benefit rate 1.7 Benefits are generated
Net Present Value R$ 22 000 000 Add value
Total Cost R$ 30 000 000 Investment
Payback 0 Time to pay the project
Execution 10 years
Thank You!
Ricardo Magno Santos AntunesProject Manager
+55 (31) 3201-1234+55 (31) 9866-7825
ricardo.magno@prbambiental.com.brwww.prbambiental.com.br