Comment List

Post on 23-Nov-2015

33 views 12 download

description

Ok. thanks

Transcript of Comment List

Comment List

Comment ListComment List ReportDate :28-Apr-2014 21:07:41Class NumberFacility NameHull NumberBuilderProject No.SubmitterReviewerReview Activity CategoryReview Activity GroupReference NoDrawing NoDrawing TitleRevisionComment NumberComment TextComment Action TypeReviewed DateComment StatusDate ClosedReview Comment / Customer ResponseReceived Date'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides TelecomT1067286'MLK-011-300-TA-0902-0014-001Overall Telecommunication System Block Diagram'02AE-001From your submission we note those junction boxes are provided at hull and top column area and at field area (as clouded). Please confirm that junction boxes that provided suitable to be used in hazardous area. Also when the selection of equipment has been finalized, a list/booklet identifying all the equipment in the hazardous area, with their method of protection, rating, manufacturers name, model number and evidence of certificate is to be submitted for our review. Please refer to 4-3-3/1.5 of ABS MODU Rules. Please confirm compliance.Technical19-Aug-13OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDElectricalTopsides Telecom'MLK-011-300-TA-0902-0014-001Overall Telecommunication System Block Diagram'02AE-001Responded by Srinivas Bhat: All requisition of electrical equipment used in hazardous areas are certified to the applicable hazardous level. The Schedule of Electrical Equipment for Hazardous Area will be developed at the end of the project and will be submitted for ABS review. Further, Ex-certificates for all Ex-type Electrical Equipment used in hazardous area will be submitted for ABS review once received from Vendor.TechnicalOpenCustomer Response23-Apr-14'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides TelecomT1107090'MLK-011-300-TA-7704-0001Telecommunication Design Basis'02AE-002Internal communications is required for a period of 18 hours during emergency. Please refer to 4-3-2/5.3.4 of ABS MODU Rules. From your submission we note that PAGA system is only provided with 3 hours of UPS power. Please resolve.Technical19-Nov-13Closed2-Jan-14ABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDElectricalTopsides Telecom'MLK-011-300-TA-7704-0001Telecommunication Design Basis'02AE-002The PAGA System will be connected to both main and emergency generator (at least 18 hours capacity). In view of this, battery (UPS) back-up for 18 hours is not required.TechnicalClosed2-Jan-14Customer Response19-Dec-13'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides TelecomT1125173'MLK-011-300-TA-7704-0001Telecommunication Design Basis'02AE-002Noted your confirmation. The comment is closed.Technical2-Jan-14Closed2-Jan-14ABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDBhaskar, Mrs. SinduElectricalTopsides InstrumentT1125234'MLK-011-300-IN-4010-0001Typical Earthing of Panels and Cables'02CE-003Size of earth-continuity conductors are to be as per 4-3-3/Table 2 of ABS MODU Rules.Please confirm compliance.Technical2-Jan-14Closed11-Feb-14ABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDBhaskar, Mrs. SinduElectricalTopsides InstrumentT1143639'MLK-011-300-IN-4010-0001Typical Earthing of Panels and Cables'02CE-003Noted your submissions.Comment closed.Technical11-Feb-14Closed11-Feb-14ABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDBhaskar, Mrs. SinduElectricalTopsides InstrumentT1125234'MLK-011-300-IN-4010-0001Typical Earthing of Panels and Cables'02CE-004All earthing conductors are to be of copper or other corrosion-resistant material.Please refer to 4-3-3/7.5 of ABS MODU Rules.Please confirm compliance. Compliance to the same is to be verified to the satisfaction of the attending Surveyor.Surveyor2-Jan-14Closed11-Feb-14ABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDBhaskar, Mrs. SinduElectricalTopsides InstrumentT1143639'MLK-011-300-IN-4010-0001Typical Earthing of Panels and Cables'02CE-004Noted your submissions.Comment closed.Technical11-Feb-14Closed11-Feb-14ABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides TelecomT1125173'MLK-011-300-TA-0602-0001-001Telecom Location Layout for Living Quarters Level 1'02AE-005The public address and general alarm system is also to cover the embarkation stations in accordance with the intent of regulation 10.16.1 of IMO MODU code. In this regard please confirm that the public address and general alarm is audible to the embarkation area in level 1 through the speakers installed near the external staircase. Compliance to the same shall be verified to the satisfaction of the attending Surveyor.Surveyor2-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDElectricalTopsides Telecom'MLK-011-300-TA-0602-0001-001Telecom Location Layout for Living Quarters Level 1'02AE-005Speakers for A & B had been considered for the embarkation area in level 1 as shown in attached Telecom Location Layout for Main Deck, MLK-011-300-TA-0602-0009-001.SurveyorOpenCustomer Response4-Feb-14'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides TelecomT1142552'MLK-011-300-TA-0602-0001-001Telecom Location Layout for Living Quarters Level 1'02AE-005Noted your submission. Compliance to the same shall be verified to the satisfaction of the attending Surveyor.Surveyor7-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDWong, Wai YewElectricalTopsides HVAC & PlumbingT1126506'MLK-011-300-MH-1380-0001Calculation Note for HVAC'04AE-006Mechanical exhaust ventilation is to be provided with fan intake at the top of the battery room. Fans are to be of non-sparking construction in accordance with 4-3-3/9.7 and capable of completely changing the air in the battery room in not more than two minutes. Openings for air inlet to be provided near the floor in accordance with 4-3-3/3.7.3 of ABS MODU Rules. Please resolve.Technical14-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDElectricalTopsides HVAC & Plumbing'MLK-011-300-MH-1380-0001Calculation Note for HVAC'04AE-0061. Mechanical exhaust ventilation has been provided with fan intake at the top of the battery room. Refer Drawing nos. MLK-011-300-MH-4180-0009-003_TS-PROD DECK_SHT 1 rev. 4 (Refer attached drawings) & MLK-011-300-MH-4180-0009-004_TS-PROD DECK_SHT 2, rev. 3. 2. Exhaust Fans (Tag no. EF-8501 A/B) shall be suitable for Zone 1, Group IIC, Class T3 in accordance with 4-3-3/9.7, refer HVAC Data Sheets Rev. 03A (MLK-011-300-MH-2180-0001). 3. Battery room have treated supply air which is coming from AHU (Tag no. 8502A/B) and 100% exhaust air. Selected Room Airflow is based on HAP Cooling Load calculation @ 12 ACH & Equipment Heat Dissipation (as per lesser ventilation rates) refer Calculation Note HVAC Appendix 5 (Exhaust air calculation sheet), Appendix 9 & item 8.5.1. (Page 16 - Refer attached calculation), which is higher than low hydrogen emission type batteries & ASHRAE 62-1-2010 as specified in with 4-3-3/3.7.3 ABS MODU Rules. 4. Openings for air inlet has been provided near the floor in accordance with 4-3-3/3.7.3 of ABS MODU Rules, refer Drawing nos. MLK-011-300-MH-4180-0009-003_TS-PROD DECK_SHT 1 rev 4.TechnicalOpenCustomer Response20-Mar-14'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDWong, Wai YewElectricalTopsides HVAC & PlumbingT1166202'MLK-011-300-MH-1380-0001Calculation Note for HVAC'04AE-006Noted that 12ACH is provided for battery room whereas 30ACH is required in accordance with 4-3-3/3.7.3 of ABS MODU Rules. Please comply.Technical21-Mar-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDElectricalTopsides HVAC & Plumbing'MLK-011-300-MH-1380-0001Calculation Note for HVAC'04AE-0061) Battery room airflow calculation is based on a lesser ventilation rate as specified in with 4-3-3/3.7.3 ABS MODU Rules. 2) Battery room calculated supply air flow is 3067L/S as per Project Specification, IP Model code of safe practice part 15, IS: 12332 & HAP cooling load calculation @12ACH, which is not more than two minutes air change and higher than DEP31.76.10.10 section 3.6.2 & as per Battery type vented Ni-Cd batteries ALCAD Vantex L requirement. (Refer attached DEP31.76.10.10 section 3.6.2 & Batterys Vendor data 01 & 02) 3) We ensure that adequate ventilation air shall be available to maintain the flammable gases within the battery room to a level below the lower explosive limit (L.E.L.) at the maximum battery charging current(Refer attached Battery Vendors data 01 & 02). 4) Please note that Supply air inlet has been provided near the floor and Exhaust intake at the top of room (Refer HVAC Equipment And Ducting Layout - Topsides - Production Deck (Sheet 1 Of 2)DWG# MLK-011-300-MH-4180-0009-003.TechnicalOpenCustomer Response24-Apr-14'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDWong, Wai YewElectricalTopsides HVAC & PlumbingT1185203'MLK-011-300-MH-1380-0001Calculation Note for HVAC'04AE-006Response noted. Calculation is to be documented and submitted to substantiate that adequate ventilation is available to maintain the flammable gases within the battery room to a level below the lower explosive limit (L.E.L) at the maximum battery charging current in accordance with 4-3-3/3.7.3 of ABS MODU Rules.Technical26-Apr-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1013400V MCC Single Line Diagram, MCC-302E-06'02AE-009Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-009Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-009Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1015400V MCC Single Line Diagram, MCC-302E-09'02AE-009Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1113Single Line Diagram for Auxiliary Distribution Board'02AE-009Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1113Single Line Diagram for Auxiliary Distribution Board'02AE-009Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1013400V MCC Single Line Diagram, MCC-302E-06'02AE-010Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules. We find no details in your submission regarding the same. For example for exhaust fan workshop (circuit: P01-EF-8502B, 400V MCC single line diagram MCC-302E-07, sheet 4 of 8), liquid fuel pump motor with VSD (circuit: P01-PM6-752X, 400V MCC single line diagram MCC-302E-06, sheet 3 of 11), etc.) Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-010Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules. We find no details in your submission regarding the same. For example for exhaust fan workshop (circuit: P01-EF-8502B, 400V MCC single line diagram MCC-302E-07, sheet 4 of 8), liquid fuel pump motor with VSD (circuit: P01-PM6-752X, 400V MCC single line diagram MCC-302E-06, sheet 3 of 11), etc.) Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-010Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules. We find no details in your submission regarding the same. For example for exhaust fan workshop (circuit: P01-EF-8502B, 400V MCC single line diagram MCC-302E-07, sheet 4 of 8), liquid fuel pump motor with VSD (circuit: P01-PM6-752X, 400V MCC single line diagram MCC-302E-06, sheet 3 of 11), etc.) Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1015400V MCC Single Line Diagram, MCC-302E-09'02AE-010Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules. We find no details in your submission regarding the same. For example for exhaust fan workshop (circuit: P01-EF-8502B, 400V MCC single line diagram MCC-302E-07, sheet 4 of 8), liquid fuel pump motor with VSD (circuit: P01-PM6-752X, 400V MCC single line diagram MCC-302E-06, sheet 3 of 11), etc.) Please clarify and resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1013400V MCC Single Line Diagram, MCC-302E-06'02AE-011Under voltage protection is to be provided for motors having power rating exceeding 0.5kW (0.7hp) to prevent undesired restarting upon restoration of the normal voltage, after a stoppage due to a low voltage condition or voltage failure. Please refer to 4-3-2/9.13.5 of ABS MODU rules. Please confirm compliance, as we find no details regarding the same in your submission. Please resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-011Under voltage protection is to be provided for motors having power rating exceeding 0.5kW (0.7hp) to prevent undesired restarting upon restoration of the normal voltage, after a stoppage due to a low voltage condition or voltage failure. Please refer to 4-3-2/9.13.5 of ABS MODU rules. Please confirm compliance, as we find no details regarding the same in your submission. Please resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-011Under voltage protection is to be provided for motors having power rating exceeding 0.5kW (0.7hp) to prevent undesired restarting upon restoration of the normal voltage, after a stoppage due to a low voltage condition or voltage failure. Please refer to 4-3-2/9.13.5 of ABS MODU rules. Please confirm compliance, as we find no details regarding the same in your submission. Please resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1015400V MCC Single Line Diagram, MCC-302E-09'02AE-011Under voltage protection is to be provided for motors having power rating exceeding 0.5kW (0.7hp) to prevent undesired restarting upon restoration of the normal voltage, after a stoppage due to a low voltage condition or voltage failure. Please refer to 4-3-2/9.13.5 of ABS MODU rules. Please confirm compliance, as we find no details regarding the same in your submission. Please resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1013400V MCC Single Line Diagram, MCC-302E-06'02AE-012Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules. Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-012Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules. Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-012Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules. Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1015400V MCC Single Line Diagram, MCC-302E-09'02AE-012Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules. Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-013Please clarify that the following electrical equipments are certified safe type (or suitable) for the intended locations, - exhaust fan - battery room (P01-EF-8501B,400V MCC single line diagram MCC-302E- 07, sheet 4 of 8) - exhaust fan - laboratory room (P01-EF-8503B,400V MCC single line diagram MCC- 302E-07, sheet 4 of 8) - exhaust fan - laboratory room (P01-EF-8504B,400V MCC single line diagram MCC- 302E-07, sheet 4 of 8). Please refer to 4-3-3/9.1.2 of ABS MODU rules. Please resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1136273'MLK-011-300-EA-2384-1014400V MCC Single Line Diagram, MCC-302E-07'02AE-013Please clarify that the following electrical equipments are certified safe type (or suitable) for the intended locations, - exhaust fan - battery room (P01-EF-8501B,400V MCC single line diagram MCC-302E- 07, sheet 4 of 8) - exhaust fan - laboratory room (P01-EF-8503B,400V MCC single line diagram MCC- 302E-07, sheet 4 of 8) - exhaust fan - laboratory room (P01-EF-8504B,400V MCC single line diagram MCC- 302E-07, sheet 4 of 8). Please refer to 4-3-3/9.1.2 of ABS MODU rules. Please resolve.Technical30-Jan-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides TelecomT1142552'MLK-011-300-TA-0902-0003-001CCTV System Block Diagram'03AE-014Cables in hazardous areas are to be armored or mineral-insulated metal-sheathed. Please refer to 4-3-3/9.1.4 of ABS MODU rules. Please confirm Compliance. Compliance to the same shall be verified to the satisfaction of the attending Surveyor.Surveyor7-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides TelecomT1142552'MLK-011-300-TA-0902-0003-001CCTV System Block Diagram'03AE-015Please confirm that the ex-type certificates for all the ex-type electrical equipments (like, Ex junction box, explosion proof CCTV pan/tilt/zoom camera) used in the hazardous areas will be submitted for our review. Please refer to 4-3-3/1.5 of ABS MODU rules. Please clarify and resolve.Technical7-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDElectricalTopsides Telecom'MLK-011-300-TA-0902-0003-001CCTV System Block Diagram'03AE-015Responded by Srinivas Bhat: All requisition of electrical equipment (Ex junction box, explosion proof CCTV PTZ Cameras) used in hazardous areas are certified to the applicable hazardous level. The Schedule of Electrical Equipment for Hazardous Area will be developed at the end of the project and will be submitted for ABS review. Further, Ex-certificates for all Ex-type Electrical Equipment used in hazardous area will be submitted for ABS review once received from Vendor.TechnicalOpenCustomer Response23-Apr-14'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10036.6KV VSD Single Line Diagram'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10036.6KV VSD Single Line Diagram'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1010400V Switchboard Single Line Diagram, SB-302E-02'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1010400V Switchboard Single Line Diagram, SB-302E-02'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1011400V Switchboard Single Line Diagram, SB-302E-03'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1011400V Switchboard Single Line Diagram, SB-302E-03'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1020400V Switchboard Single Line Diagram,SB-306E-04'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1020400V Switchboard Single Line Diagram,SB-306E-04'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1021400V MCC Single Line Diagram, MCC-302E-01'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1021400V MCC Single Line Diagram, MCC-302E-01'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1051400/230V AC Instrument UPS Single Line Diagram, UPS-307V-01'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1052400/230V AC Instrument UPS Single Line Diagram, UPS-307V-02'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1053400/230V AC Telecom UPS Single Line Diagram, UPS-307V-11'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1054400/230V AC Telecom UPS Single Line Diagram, UPS-307V-12'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1055110V DC UPS Single Line Diagram UP-308W-01/02'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1056Navigational Aids Single Line Diagram'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1057Heat Tracing Panel Single Line Diagram'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1057Heat Tracing Panel Single Line Diagram'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5090Living Quarters - SLD for Kitchen Dist.Board'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5091Living Quarters - SLD for Utility Distribution Board'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5091Living Quarters - SLD for Utility Distribution Board'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5110Living Quarters - SLD for Normal Lighting Dist.Board Level 1'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5110Living Quarters - SLD for Normal Lighting Dist.Board Level 1'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5213Living Quarters - SLD for Emergency Dist.Board'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5213Living Quarters - SLD for Emergency Dist.Board'02AE-016Please be advised that the single line diagram is to show the type and size of cables and also the trip setting and rating of the circuit protection devices. Please refer to 4-3-2/1.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details on the type and size of cables and circuit breakers trip setting in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10036.6KV VSD Single Line Diagram'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10036.6KV VSD Single Line Diagram'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1021400V MCC Single Line Diagram, MCC-302E-01'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1021400V MCC Single Line Diagram, MCC-302E-01'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-017All motor controllers are to be indicated with Under Voltage Protection and / or Under Voltage Release (UVP and/or UVR) as applicable. Please refer to 4-3-2/9.13.5 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details regarding the same in your submission. Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10026.6KV Switchgear Single Line Diagram, SB-302D-01'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10036.6KV VSD Single Line Diagram'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-10036.6KV VSD Single Line Diagram'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1021400V MCC Single Line Diagram, MCC-302E-01'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1021400V MCC Single Line Diagram, MCC-302E-01'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-018Running protection is to be provided for all motors and set between 100% and 125% of its rated full load current. Please refer to 4-3-2/9.13.4 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Compliance of the same shall be verified to the satisfaction of attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1022400V MCC Single Line Diagram, MCC-306E-02'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5001Living Quarters 400V MCC Single Line Diagram, MCC-302E-8'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-5002Living Quarters 400V MCC Single Line Diagram, MCC-306E-4'02AE-019Please clarify that emergency stop provision is provided for all electrical ventilation systems, machinery driving forced and induced draft fans, electric motor pressurization fans, oil fuel transfer pumps, oil fuel unit pumps and other similar fuel pumps, so that they may be manually stopped in the event of a fire arising in the space in which they are located. Please refer to 4-3-2/19 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). We find no details in your submission regarding the same. For example, Liquid fuel pump motor with VSD (cir: P01-PM6-754X, 400V MCC single line diagram, sheet 3 of 13), Ventilation system motor A (cir: P01-PM3-756XA, 400V MCC single line diagram, sheet 4 of 13).Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1051400/230V AC Instrument UPS Single Line Diagram, UPS-307V-01'02AE-020An acceptable means, such as reverse current protection, is to be provided for preventing a failed component in the battery charger or uninterruptible power system (UPS) unit from discharging the battery. Please refer to 6-1-7/9.17.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please confirm compliance with regard to the following equipments, - instrument UPS panel A - instrument UPS panel B - telecom UPS panel A - telecom UPS panel B - 110VDC UPSs - nav-aids central control panel; As we find no details regarding the same in your submission.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1052400/230V AC Instrument UPS Single Line Diagram, UPS-307V-02'02AE-020An acceptable means, such as reverse current protection, is to be provided for preventing a failed component in the battery charger or uninterruptible power system (UPS) unit from discharging the battery. Please refer to 6-1-7/9.17.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please confirm compliance with regard to the following equipments, - instrument UPS panel A - instrument UPS panel B - telecom UPS panel A - telecom UPS panel B - 110VDC UPSs - nav-aids central control panel; As we find no details regarding the same in your submission.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1053400/230V AC Telecom UPS Single Line Diagram, UPS-307V-11'02AE-020An acceptable means, such as reverse current protection, is to be provided for preventing a failed component in the battery charger or uninterruptible power system (UPS) unit from discharging the battery. Please refer to 6-1-7/9.17.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please confirm compliance with regard to the following equipments, - instrument UPS panel A - instrument UPS panel B - telecom UPS panel A - telecom UPS panel B - 110VDC UPSs - nav-aids central control panel; As we find no details regarding the same in your submission.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1054400/230V AC Telecom UPS Single Line Diagram, UPS-307V-12'02AE-020An acceptable means, such as reverse current protection, is to be provided for preventing a failed component in the battery charger or uninterruptible power system (UPS) unit from discharging the battery. Please refer to 6-1-7/9.17.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please confirm compliance with regard to the following equipments, - instrument UPS panel A - instrument UPS panel B - telecom UPS panel A - telecom UPS panel B - 110VDC UPSs - nav-aids central control panel; As we find no details regarding the same in your submission.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1055110V DC UPS Single Line Diagram UP-308W-01/02'02AE-020An acceptable means, such as reverse current protection, is to be provided for preventing a failed component in the battery charger or uninterruptible power system (UPS) unit from discharging the battery. Please refer to 6-1-7/9.17.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please confirm compliance with regard to the following equipments, - instrument UPS panel A - instrument UPS panel B - telecom UPS panel A - telecom UPS panel B - 110VDC UPSs - nav-aids central control panel; As we find no details regarding the same in your submission.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1056Navigational Aids Single Line Diagram'02AE-020An acceptable means, such as reverse current protection, is to be provided for preventing a failed component in the battery charger or uninterruptible power system (UPS) unit from discharging the battery. Please refer to 6-1-7/9.17.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please confirm compliance with regard to the following equipments, - instrument UPS panel A - instrument UPS panel B - telecom UPS panel A - telecom UPS panel B - 110VDC UPSs - nav-aids central control panel; As we find no details regarding the same in your submission.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1056Navigational Aids Single Line Diagram'02AE-021Please provide the details on the type of navigation lights supplied from the nav-aids central control panel to verify compliance against 4-3-2/13.3 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please clarify and resolve.Technical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-022Please clarify that the following electrical equipment is certified safe type (or suitable) for the intended locations, - hazardous open drain caisson pump motor (cir: P01-PM-7406, 400V MCC single line diagram, sheet 7 of 11). Please refer to 4-3-3/9.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please resolveTechnical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-2384-1024400V MCC Single Line Diagram, MCC-306E-03'02AE-022Please clarify that the following electrical equipment is certified safe type (or suitable) for the intended locations, - hazardous open drain caisson pump motor (cir: P01-PM-7406, 400V MCC single line diagram, sheet 7 of 11). Please refer to 4-3-3/9.1.2 of ABS MODU rules (as referred from 5B-2-6/3 of ABS Floating Production Installation guide). Please resolveTechnical10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-4010-1005Electrical Earthing Layout - Battery/VSD Room'02AE-023Earthing of electrical equipments are to be in accordance with 4-3-3/7 of ABS MODU rules. (as referred from 5B-2-6/3 of ABS Floating Production Installation guide) Please confirm compliance. Compliance to the same shall be verified to the satisfaction of the attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDVinod, Reshma C.ElectricalTopsides ElectricalT1143638'MLK-011-300-EA-4010-1005Electrical Earthing Layout - Battery/VSD Room'02AE-023Earthing of electrical equipments are to be in accordance with 4-3-3/7 of ABS MODU rules. (as referred from 5B-2-6/3 of ABS Floating Production Installation guide) Please confirm compliance. Compliance to the same shall be verified to the satisfaction of the attending Surveyor.Surveyor10-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142653'MLK-011-300-EA-4329-1001Electrical Load List'04CE-024Please ensure that the fire water pump is to be continuously connected during the emergency operation and not in back-up mode. Please refer to 4-3-2/1.7 of ABS MODU Rules.Technical19-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1001Installation Details Cable Ladder/Tray'02CE-025Please confirm that cables will be limited to two banks in cable tray. Please refer to 4-3-4/Table 2, Note 2 of ABS MODU Rules. Also please confirm that cables that are bunched of 7 to 12 will be applied with a reduction factor of 0.85 as per 4-3-3/5.11.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1001Installation Details Cable Ladder/Tray'02CE-025Please confirm that cables will be limited to two banks in cable tray. Please refer to 4-3-4/Table 2, Note 2 of ABS MODU Rules. Also please confirm that cables that are bunched of 7 to 12 will be applied with a reduction factor of 0.85 as per 4-3-3/5.11.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1003Installation Details Electrical Power'02CE-025Please confirm that cables will be limited to two banks in cable tray. Please refer to 4-3-4/Table 2, Note 2 of ABS MODU Rules. Also please confirm that cables that are bunched of 7 to 12 will be applied with a reduction factor of 0.85 as per 4-3-3/5.11.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1003Installation Details Electrical Power'02CE-025Please confirm that cables will be limited to two banks in cable tray. Please refer to 4-3-4/Table 2, Note 2 of ABS MODU Rules. Also please confirm that cables that are bunched of 7 to 12 will be applied with a reduction factor of 0.85 as per 4-3-3/5.11.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1001Installation Details Cable Ladder/Tray'02CE-026Please confirm if metal strips are used to fix the cables in place. Please refer to 7-1-5/5.9.1 as referred from 4-3-3/5.9.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1001Installation Details Cable Ladder/Tray'02CE-026Please confirm if metal strips are used to fix the cables in place. Please refer to 7-1-5/5.9.1 as referred from 4-3-3/5.9.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1003Installation Details Electrical Power'02CE-026Please confirm if metal strips are used to fix the cables in place. Please refer to 7-1-5/5.9.1 as referred from 4-3-3/5.9.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1003Installation Details Electrical Power'02CE-026Please confirm if metal strips are used to fix the cables in place. Please refer to 7-1-5/5.9.1 as referred from 4-3-3/5.9.1 of ABS MODU Rules.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1001Installation Details Cable Ladder/Tray'02CE-027Deck and bulkhead penetrations are to be in accordance with 4-3-3/5.13 of ABS MODU Rules. The penetrations through watertight & fire tight bulkheads or decks are to be made through approved stuffing tubes, transit devices or pourable materials to maintain the watertight, fire tight or smoke-tight integrity of the bulkheads or decks. The type approval or testing laboratory certification for each type of penetrations is to be submitted for our review.Technical20-Feb-14OpenABS Comment'YY250628MALIKAI TLPTBAMALAYSIA MARINE & HEAVY ENGINEERING2938504TECHNIP GEOPRODUCTION(M) SDN BHDAppalanaidu, MaheshnaiduElectricalTopsides ElectricalT1142658'MLK-011-300-EA-4323-1001Installation Details Cable Ladder/Tray'02CE-027Deck and bulkhead penetrations are to be in accordance with 4-3-3/5.13 of ABS MODU Rules. The penetrations through watertight & fire tig