PROJECT BRIEF V6.1
1. DOCUMENT INFORMATION
Project Name: Prepared By: Document Version No:
Title: Document Version Date:
Reviewed By: Review Date:
1.1 DOCUMENT VERSION HISTORY
VersionNumber
VersionDate Revised By Description Filename
Document Created
1.2 APPROVALS
This document requires the following approvals. Signed approval forms should be filed appropriately in the project filing system
Name Title Action* Date Version
* Action Types: Approve, Review, Inform, File, Action Required, Attend Meeting, Other (please specify)
1.3 DISTRIBUTION LIST
Name Title OrganisationDavid Morrison System Development Manager Monash University
CIDMU_Project Brief V6 Page 1 of 11 Last Updated: 22/3/2013
2. TABLE OF CONTENTS
1. DOCUMENT INFORMATION................................................................................................................... 1
1.1 DOCUMENT VERSION HISTORY.......................................................................................................................11.2 APPROVALS.................................................................................................................................................11.3 DISTRIBUTION LIST.......................................................................................................................................1
2. TABLE OF CONTENTS............................................................................................................................. 2
3. INTRODUCTION..................................................................................................................................... 3
3.1 PURPOSE....................................................................................................................................................33.2 INTENDED AUDIENCE....................................................................................................................................3
4. PROJECT DEFINITION............................................................................................................................. 3
4.1 BACKGROUND..............................................................................................................................................34.2 PROJECT OBJECTIVES.....................................................................................................................................34.3 DATA COLLECTION........................................................................................................................................34.4 SYSTEM BUILD.............................................................................................................................................44.5 SYSTEM FUNCTIONALITY.................................................................................................................................54.6 INTEGRATION...............................................................................................................................................54.7 MIGRATION.................................................................................................................................................54.8 AVAILABILITY...............................................................................................................................................54.9 CAPACITY....................................................................................................................................................54.10 SUPPORT..................................................................................................................................................5
5. BUSINESS CASE...................................................................................................................................... 6
5.1 EXECUTIVE SUMMARY...................................................................................................................................65.2 BUSINESS JUSTIFICATION................................................................................................................................65.3 PROJECT OUTCOMES.....................................................................................................................................65.4 PROJECT RISK..............................................................................................................................................65.5 CONSTRAINTS..............................................................................................................................................65.6 TIME..........................................................................................................................................................65.7 BUDGET.....................................................................................................................................................75.8 INTERESTED PARTIES.....................................................................................................................................7
6. PROJECT MANAGEMENT TEAM STRUCTURE..........................................................................................8
6.1 ROLE DESCRIPTIONS......................................................................................................................................8EXECUTIVE............................................................................................................................................................8SENIOR SUPPLIER...................................................................................................................................................8STUDY PROJECT MANAGER......................................................................................................................................8BUSINESS ANALYST.................................................................................................................................................8SCRUMMASTER.....................................................................................................................................................8CHAMPION USER....................................................................................................................................................86.2 ROLES AND RESPONSIBILITIES..........................................................................................................................9
8. REFERENCES........................................................................................................................................ 10
CIDMU_Project Brief V6 Page 2 of 11 Last Updated: 22/3/2013
3. INTRODUCTION
3.1 PURPOSE
The purpose of this document is to enable CIDMU to provide project cost estimation.
3.2 INTENDED AUDIENCE
The audience of this document is CIDMU Development Manager, and CIDMU Technical Lead.
4. PROJECT DEFINITION
4.1 BACKGROUND
CLIENT to COMPLETE - (Please provide a short description of the project)
4.2 PROJECT OBJECTIVES
CLIENT TO COMPLETE – What do you want the system to do?
EG: To develop a web based data capture and reporting systems that enables…
4.3 DATA COLLECTION
CLIENT TO COMPLETE –
a) Collection of data from XXX sites?
b) Collection of data for XXX participants?
c) Collection of data for XX visits per participant?
d) Collection of data for XXX duration?
CIDMU_Project Brief V6 Page 3 of 11 Last Updated: 22/3/2013
e) If an RCT, expected recruitment timeframe?
f) What is the expected lifespan of the system?
g) Collection of data on XX forms (e.g. baseline, follow up adverse event). Are any of the forms repetitive (e.g. daily)?
4.4 SYSTEM BUILD
a) Is the proposed database an entirely new system or is it a version of an existing system?
b) If an existing system is available, how different is the proposed system from the existing system?
c) Is there a need to import data from another service? What frequency is the data import expected?
d) How much data do you intend to collect using the proposed database (number of records and number of data elements)?
e) If an RCT, is the system expected to handle randomisation?
f) Are there any reporting requirements? E.g. management reports and clinical reports
g) Any other special requirements?
CIDMU_Project Brief V6 Page 4 of 11 Last Updated: 22/3/2013
4.5 SYSTEM FUNCTIONALITY
CLIENT TO COMPLETE – What are the functionalities you are expecting from this system – e.g.
Data capture from multiple sites On-line error checking Centralised reporting
4.6 INTEGRATION
CLIENT TO COMPLETE - Are there any data feeds or interfaces with other systems to be developed?
4.7 MIGRATION
CLIENT TO COMPLETE – Does any existing data require to be migrated to the new system? If so, is a sample extract available, database schema and/or data dictionary?
4.8 AVAILABILITY
CLIENT TO COMPLETE – When is the service expected to be available? Business Hours, Weekends?
4.9 CAPACITY
CLIENT TO COMPLETE – How many users are expected to connect? How many would connect at a time?
4.10 SUPPORT
CLIENT TO COMPLETE – What after development support is required?
CIDMU_Project Brief V6 Page 5 of 11 Last Updated: 22/3/2013
5. BUSINESS CASE
5.1 EXECUTIVE SUMMARY
CLIENT TO COMPLETE – Please provide a more detailed description and landscape of the project including project problems or issues.
5.2 BUSINESS JUSTIFICATION
CLIENT TO COMPLETE – What are the purpose of this project? What are you trying to achieve?
5.3 PROJECT OUTCOMES
CLIENT TO COMPLETE – What are the benefits you are expecting from this project?
5.4 PROJECT RISK
CLIENT TO COMPLETE - (Identify risks associated with development, delay, stakeholders etc.)
5.5 CONSTRAINTS
CLIENT TO COMPLETE - Are there any constraints to the project that we need to be aware of? e.g. Proposed project time lines i.e. when do you want the system to be available by? Budget i.e. is funding to be provided by a grant application, the outcome of which is as yet, unknown?
5.6 TIME
CLIENT TO COMPLETE – Do you have a deadline to meet or preferred time frame?
CIDMU_Project Brief V6 Page 6 of 11 Last Updated: 22/3/2013
5.7 BUDGET
CLIENT TO COMPLETE –
a) Have you secured a funding? If so, please state what type (NHMRC / Industry)? What budget have you allocated for data management?
b) Is this proposal related to a future grant? If so, what type?
5.8 INTERESTED PARTIES
CLIENT TO COMPLETE – Who else is involved in this project that may want to have a say – other stakeholders?
CIDMU_Project Brief V6 Page 7 of 11 Last Updated: 22/3/2013
6. PROJECT MANAGEMENT TEAM STRUCTURE
6.1 ROLE DESCRIPTIONS
EXECUTIVE
(CLIENT TO COMPLETE - Name the key stakeholders that will sign off on the requirements and approval budget expenditure)
SENIOR SUPPLIER
(This will be the CIDMU Systems Development Manager)
STUDY PROJECT MANAGER
(CLIENT to complete - This will be the Study Project Manager that will be heavily involved in the requirements specifications, application development and user testing)
BUSINESS ANALYST
(This will be the business analyst for the project from CIDMU)
SCRUMMASTER
(This will be the software development team leader for the project from CIDMU)
CIDMU_Project Brief V6 Page 8 of 11 Last Updated: 22/3/2013
Executive:Chris Reid (CIDMU) + Principle Investigator
Senior Supplier:David Morrison
(CIDMU)
Study Project Manager:
(CLIENT Nominee)
Business Analyst: (CIDMU Nominee)
Champion User: (CLIENT Nominee)
Project ScrumMaster: (CIDMU Nominee)
CHAMPION USER
(CLIENT to complete - This will be the main user of the system, that may be heavily involved in the requirements specifications, application development and user testing)
6.2 ROLES AND RESPONSIBILITIES
Executive
Approve the Project including budget
Approve the System Requirements Specification
Confirm acceptance of the projects product
Provide executive support to the project team
Senior Supplier
Verify the System Requirements Specification
Provide resources to undertake project activities
Provide technical expertise and assistance
Oversee project progress
Study Project Manager
Participate in all sprint planning and review meetings
Prepare the System Requirements Specification with Business Analyst
Manage the priorities of the project
Collate system improvements and change requests
Provide acceptance of the project product
Business Analyst
Participate in all workshops, sprint planning and review meetings
Prepare the System Requirements Specification
Manage the Initiation phase of project
Collate system requirements and User Acceptance Tests
Provide systems design documentation
ScrumMaster
Participate in all sprint planning and review meetings
Assist with the System Requirements Specification with Business Analyst
Manage the priorities of the software development team
Manage the Scrum development process
Provide project progress reporting
Champion User
Assist with the User Acceptance Test
Assist with product Usability Test
Provide acceptance of the project product
7.
CIDMU_Project Brief V6 Page 9 of 11 Last Updated: 22/3/2013
8. REFERENCES
CLIENT TO SUPPLY Data Dictionary Project Protocol Any other relevant documentation
CIDMU_Project Brief V6 Page 10 of 11 Last Updated: 22/3/2013