CII CII –– Godrej GBCGodrej GBCHyderabadHyderabad
Optimal Utilization of Ground Optimal Utilization of Ground Water ResourcesWater Resources
Date: 26Date: 26thth AugustAugust’’20092009
Presented by:Presented by:G.PanduG.Pandu RangaRanga RaoRao
Manager (Manager (Safety,OccupationalSafety,Occupational Health & Environment)Health & Environment)
Mahindra & Mahindra Ltd.,Mahindra & Mahindra Ltd.,Automotive Sector, Automotive Sector, ZaheerabadZaheerabad –– A.PA.P
Mahindra & Mahindra Ltd.,Mahindra & Mahindra Ltd.,Automotive SectorAutomotive SectorZaheerabadZaheerabad –– A.PA.P
Organization Profile: Established in 1985 in semi arid region
Total estate area : 343 Acres
Products Mfg. : 3 Wheelers, UVs & LCVs
3
Our ProductsOur ProductsUTILITY VEHICLESUTILITY VEHICLES
InvaderInvader MaxxMaxx SavariSavari CamperCamper
LIGHT LIGHT COMMERCIAL COMMERCIAL
VEHICLEVEHICLE
TouristerTourister School BusesSchool Buses Load KingLoad King
33-- WHEELERWHEELER
ALFA Load carrierALFA Load carrier ALFA PassengerALFA Passenger
TourTour--42 42 strstr BusBus
Struggle for Water•Acute water shortage
•Drying up of open wells and bore wells
•Rationing of water to colonies
•Buying of water from distant locations
•Rising of water demand day by day due to increase in
production demand
•Ground Water strike rate dropped to 450 feet
Year 2000 Areal View of the Year 2000 Areal View of the Mahindra EstateMahindra Estate
Initiatives startedInitiatives started
• Help sought from ICRISAT and Ground Water Department of AP Govt.
• Under ground water maps and the topography of Zaheerabad estate were studied
Under Ground Water Maps & Under Ground Water Maps & Topography of the Mahindra EstateTopography of the Mahindra Estate
Inputs taken from ICRISAT and Ground Inputs taken from ICRISAT and Ground Water Department Water Department
• Based on these inputs a time bound master plan of water augmentation was worked out.
• The activities considered under master plan 1. Rain water harvesting pits,2. New locations for bore wells,3. New location of open wells,4. Planting of trees which requires less water for survival, 5. Locations for new percolation tanks6. Re-usage and Re-cycling of waste water, 7. Channels created for rain water to recharge the under ground
water reservoirs and 8. Massive tree plantation and drip irrigation
Rain Water Harvesting PitsRain Water Harvesting Pits
Open WellsOpen Wells
Open well under construction Open well under usageLOCATION OF OPEN WELL
SIZE: DIA:12MTR.DEPTH:35-40 MTRS.
Green InventoryGreen InventoryS.No Name of the Plant
Area Covered (Acres)
No. of saplings planted
1 Mango Plants 81 23,100
2 Chiku Plants 1 100
3 Nagpur Orange 3 1,500
4 Teak 2 5,000
5 Coconut 1 500
6 Cashew nut 1 500
7 Pomegranate 2 500
8 Goose 7 2,100
9 Flower Plants 2
10 Subabool 20 80,000
Total 120 1,13,300
Green InventoryGreen Inventory
Percolation TanksPercolation Tanks
Before construction photographDt:30/12/2004
After Collection of storm water in percolation tank
Photograph: 21/04/2005 Reservoir Capacity: 120 Lakh Ltrs
(Approx.)
Rain water Inflow to Harvesting Pit & Rain water Inflow to Harvesting Pit & Percolation tankPercolation tank
Video taken on Dt: 17.08.09, Time: 05.00 PM
Percolation Tank Catchment Area
ReRe--cycling of Effluent Watercycling of Effluent WaterEffluent Treatment Plant
(ETP):
Bio-filtration Plant
Total Capacity : 160 Cu. Mt / day.Inflow Capacity: 150 Cu. Mt / day.
Total Capacity : 50 Cu. Mt / day.Inflow Capacity: 50 Cu. Mt / day.
Drip IrrigationDrip Irrigation
Drip Irrigation
Year 2008 Areal View of the Year 2008 Areal View of the Mahindra EstateMahindra Estate
ResultsResults
-350
-290
-250 -250-270
-250-230 -230
-400
-350
-300
-250
-200
-150
-100
-50
0
2001
2002
2003
2004
2005
2006
2007
2008
Year
Gro
und
Wat
er T
able
(in
feet
)
Ground Level Ground Level
GOOD
Ground Water Table
END OF THE PRESENTATION
THANK YOUTHANK YOU