NAMA PROJEK : CADANGAN MEMBEKAL DAN MEMASANG
LAMPU JALAN DI FLAT CEMPAKA 2,FLAT
DAHLIA DAN FLAT IXORA GARDEN AVENUE,
SEREMBAN 2, SEREMBAN N.S.D.K
(PROGRAM BANDAR SELAMAT)
NO. KONTRAK : MPS/104/SH( 104)2015/ELEK(10)
KELAS : G2
TARIKH MULA : 25.05.2015
TARIKH SIAP : 20.07.2015
EOT 1 : 15. 8 .2015
KOS PROJEK : RM 359,925.00
NAMA KONTRAKTOR : RH GIGA POWER ENTERPRISE
KEMAJUAN JADUAL : 100 %
KEMAJUAN SEBENAR : 100 %
Powerpoint TemplatesPage 3
SKOP KERJA YANG DIJALANKAN
• PEMASANGAN 49 UNIT LAMPU JALAN DAN
• 3 UNIT FEEDER PILLAR