Proposal title.
Up gradation of Bwp Airport from national to inter national level
Submitted to Department of Infrastructure and regional development
Broad Subject Aviation Engineering Duration 1 Year Cost 2 Billion Principal in charge Mr. Waqas Ahmad Designation Project Manager Department civil Aviation Contact chemistrybrain@gmail.com
Draft ContractUp gradation of Bwp Airport from national to inter national level
EXECUTIVE SUMMERY OF PROJECT
To up grade the BWP airport from national to international level is a unique idea. Bahawalpure is the longest division of Pakistan which consist 3 distt Bahawalpure, Bahawalnagar, and Rahim yar khan. Bwp also attach with Indian border.
I get this idea when I personally realized that in my area there is no international airport. We have to go to Lahore or Karachi which are at so long distance from us almost 1000 km.
So an international air port is exactly a need of BwpThe outcome of this project is firstly the facilitation of area’s population.Second the progress of BWP and also Pakistan by competing international standard
Up gradation of Bwp Airport from national to inter national level
Pic
Problem Statement
BACKGROUND STUDY
To complete this project I study a lot of literature about construction like these projects. I specially study the project of construction of Jaddah Airport Saudi Arabia.
OBJECTIVE OF PROPOSAL
To facilitate area’s population with modern technology
To take part in progress of Pakistan To promote and develop my area BWP
to international level
PROJECT TEAM
In charge Project Manager Co coordinator Construction Head Budget Controller Audit Officer All worker in all project wings
Method and Resources
To complet this project I shell adopt most suitable method presently used in this age. This is tested by ISO.
Literature survey Collection of material Scripting Developing strategies Construction work Contract with air lines audit
Methodology
The schedule activates
Literature survey 30 daysCollection of material 20 daysScripting 10 daysDeveloping strategies 10 daysConstruction work 8 monthContract with air lines 30 daysAudit 20 days
THE SCHEDULE ACTIVATES BAR DIAGRAM
Literature survey
Collection of material and scripting
construction work
contract with air lines and aduit
0 2 4 6
Series 3
Series 3
Total 2 billion Construction work 60% Salaries and other costs 20% Travel 10% Air lines contract 10%
Budget summery
BUDGET ESTIMATE DIAGRAM
Trave
l
air lin
es con
tract
salari
es an
d othe
r cost
s
constr
uction
01.5
34.5
Series 3
Series 3
OUT COME PRODUCT OF PROPOSAL