Post on 09-Nov-2015
description
BTS3902E WCDMAQuick Installation
Issue: 06Date: 2014-05-30
HUAWEI TECHNOLOGIES CO., LTD.
Guide
This document is applicable to BTS3902E WCDMA Vlater versions (The single-mode base station version m
BTS3902E WCDMA is referred to as BTS3902E in thi
BTS3902E Exterior and Dimensions
BTS3902E
ExteriorBTS3902E has two exteriors.
(1) Upper housing (2) Camouflage shell (3an
Dimensionse s o s
Module Dimensions (H1 x WModule(Without the Housi
BTS3902E working at the 1.9 GHz, 2.1 GHz or AWS frequency band
300 mm120 mm270
BTS3902E working at the 850MHz frequency band 300 mm127 mm270
1
V200R013C00 and later versions / V100R008C00 and mapping to V100R008C00 is: NodeB V200R015C00).is document.
3) BTS3902E with built-in ntenna
(4) BTS3902E with external antennas
W1 x D) Dimensions (H2 x W2 x D) ng) (with the Housing)
0 mm 400 mm145 mm277 mm
0 mm 400 mm170 mm277 mm
1 Copyright Huawei Technologies Co., Ltd. 2014. All rights reserved.
BTS3902E Installation OptionszOn a Metal Pole with zOn a Metal Pole with thezOn a Metal Pole with the Diameter Ranging from 60 mm to 114 mm
zOn a Metal Pole with theDiameter Ranging from 114 mm to 400 mm
BTS3902E Installation Clearance RequzRecommended clearance for installing a single BTS3902
z
zRecommended clearance for installing two BTS3902E side by side
zRecommended clearance for installing two BTS3902E in a vertical line
2
e zOn a Wall zOn a Wood Pole with thee zOn a Wall zOn a Wood Pole with the Diameter Ranging from 200 mm to 400 mm
uirementszMinimum clearance for installing a single BTS3902E
zMinimum clearance for installing two BTS3902E side by side
zMinimum clearance for installing two BTS3902E in a vertical line
2
SPD60D
Two AC surge protection boxes (SPD60D and SPM60A
(Optional) AC Surge Protec
zExterior and Dimensions zRecommendclearance
The outdoor BTS3902E working at the 1.9 GHz or 2.1 GH
Dimensions and Installation Clearance
SPD60D
zOn a Metal Pole with the Diameter Ranging from 60 mm to 114 mm
Installation Options
zOn a Wall
3
A) are available for the BTS3902E.
ction Box
ded installation zMinimum installation clearance
Hz frequency band can use the SPD60D.
Requirements
zOn a Metal Pole with the Diameter Ranging from 114 mm to 400 mm
zOn a Wood Pole with the Diameter Ranging from 200 mm to 400 mm
3
The outdoor BTS3902E working at the 850 MHz frequenc
SPM60A
zExterior and Dimensions zRecommendclearance
The outdoor BTS3902E working at the 850 MHz frequenc
Dimensions and Installation Clearance
zOn a PoleInstallation Options
4
cy band can use the SPM60A
ded installation zMinimum installation clearance
cy band can use the SPM60A.
Requirements
zOn a Wall
4
Installing on a Pole with the1 Installing the angle-adjustable mount
The composing of angle-adjustable mountinLifting eyeAttachment plate Lifting eye
Traction eye
Main mounting bracket
Auxiliary mounting
dhTraction eye
2. Installing the auxiliary mounting bra
Double-headed nutHoist clamp
Ensure that the arrow on the auxiliary bracket points up.
2 Installing the BTS3902E
Tighten the two double-headed nuts synchronously and soand auxiliary brackets are the same.
Upper positioning pin
Lower positioning pin
Put the upper positioning pin through the hole on the ahole on the main mounting bracket.
5
3 Adjusting the installation angle of th
The procedures of adjusting the installation angle
e Diameter of 60 mm to 114 mmting kits
g kits 1. Installing the main mounting bracket
g bracket
double-headed nut
Long bolt
Rubber washerDouble-headed nut
ackets
o that the distances between the two sides of the main
Positioning screw
attachment plate and the lower positioning pin through the
5
he BTS3902E
e, see the page 8.
Installing on a Pole with the1 Installing the mounting brackets
Adapting plate(1) Mounting hole group A
Ad
1. Inst( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate
Mabra
Ada
2. Installing the Hose clamp
Mounting hole group B LeHose clamp
2 Installing the BTS3902E
Upper positioning pin
Lower positioning pin
Put the upper positioning pin through the hole on the ahole on the main mounting bracket.
6
3 Adjusting the installation angle of th
The procedures of adjusting the installation angle
e Diameter of 114 mm to 400 mm
ti l t
talling the adapting plate assembly
ain mounting acket
apting plateScrew
Hose clampevel
Positioning screw
attachment plate and the lower positioning pin through the
6
he BTS3902E
e, see the page 8.
Installing a BTS3902E on a 1 Installing the adapting plate assembl
Adapting plate(1) Mounting hole group A
Ada( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate
Mabra
2 Installing the mounting brackets on t1. Drilling holes and install expansion bolt assembliesp
(1) M10x80 b(2) Nut(3) Spring wa(4) Flat wash(5) Expansio
3 Installing the BTS3902E
Upper positioni
Lower positioning pin
Put the upper positioning pin through the hole on the attac
7
pp p g p ghole on the main mounting bracket.
4 Adjusting the installation angle of thThe procedures of adjusting the installation angle
7
Wallly
apting plateScrew
ain mounting acket
Screw
the Wall2. Fitting the mounting piece onto the expansion boltsp
bolt
asherhern tube
(1) Insulation washer(2) Flat washer( )(3) Spring washer(4) Nut
ng pin Positioning screw
chment plate and the lower positioning pin through the
7
p p g p g
e BTS3902Ee, see the page 8.
7
Installing on a Wood Pole wto 400 mm
1 Installing the adapting plate assembl
Adapting plate(1) Mounting hole group A
Ada( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate
Mabra
2 Installing the mounting piece
Mounting hole group C
BoltSpacer
CMountinghole grou
3 Installing the BTS3902EUpper positioning p
Lower positioning pin
Put the upper positioning pin through the hole on the attachole on the main mounting bracket.
8
4 Adjusting the installation angle of thThe procedures of adjusting the installation angle
with the Diameter of 200 mm
ly
apting plateScrew
ain mounting acket
Screw
Nut
Spacer
g up C
pinPositioning screw
chment plate and the lower positioning pin through the
8
e BTS3902Ee, see the page 8.
Adjusting the installation an
Horizontal angle 30, vertical angle 10.If the positioning pin is tightened too hard, the installatiopositioning screw first
1 Adjusting the horizontal angle
positioning screw first.The horizontal angle and vertical angle can be adjusted either from the plan or elevation view.Ensure that the positioning screws both in the vertical d
2 Adjusting the vertical angle
9
ngle of the BTS3902E
on angle cannot be adjusted. In this case, loosen the
simultaneously. The vertical angle can be determined
irection and horizontal direction have been secured.
P iti iPositioning screw
Positioning screw
9
(Optional) Installing the AC
I t ll SPD60D l
Install an SPD60D
When the diain. to 4.49 in.)protection boxWhen the dia(4.49 in. to 15
Install an SPD60D on a pole
(If the diametesmall, cut the
Install an SPD60D on a wall1. Marking the anchor points 2. Installing an e
(1) M10x65 bolt(2) Spring washer 10(3) Plastic tube(4) Flat washer 10(5) Expansion tube
1. Drilling holes 2. Installing t
Install an SPD60D on a wood pole
1
Surge Protection Box
ameter of the pole ranges from 60 mm to 114 mm (2.36 ), the hose clamps delivered with the AC surge x is used.ameter of the pole ranges from 114 mm to 400 mm 5.75 in.), the hose clamps purchased locally is used.) p p yer of the pole around which the clamp is installed is extra part of the clamp.
expansion bolt 3. Installing the SPD60D
0
he AC surge protection box on the wood pole
0
Install an SPM60A on a pole
Install an SPM60A
Install an SPM60A on a pole
1. Marking the anchor points 2. Installing an e
Install an SPM60A on a wall
(1) M10x65 bolt(2) Spring washer 10(3) Plastic tube(4) Flat washer 10(5) Expansion tube
1
expansion bolt 3. Installing the SPD60D
0
1
Installing a PGND Cable
The cross-sectional area of the PGND cable of the BTS
1 Without AC Surge Protection Box
frequency band is 1.5 mm2 .The cross-sectional area of the PGND cable of the BTS
PGND cablePGND cable
External ground bar
2 With AC Surge Protection Box
Equipotential cable
PGND cable
External ground bar
1
S3902 working at the 1.9 GHz, 2.1 GHz, or AWS
Installing an OT terminal in the correct manner
g , ,
S3902 working at the 850MHz frequency band is 6 mm2 .
Installing an OT terminal in the correct manner
Installing an OT terminal in the correct manner
2
Installing the Power Cable o1 Installing the AC Power Cable of BTS
GHz or 850MHZ Frequency Band)q y )
Without AC Surge Protection Box
Power
With AC Surge Protection Box1.Installing the AC Power Cable of the ACWith AC Surge Protection Box
zInstalling the SPD60D Cable
BTS390
Thread-lock sealing nuof the PG connector
PG connector
Waterproof blockBTS390Blue----Brown-Yellow/zInstalling the SPM60A Cable
Surge protector
Ground
Ca
Waterproof
BTS3902E poBlue----NoutBrown----Lou
1
Waterproof block Yellow/Green
of BTS3902ES3902E(Working at The 1.9 GHz, 2.1
r cable
C Surge Protection Box
02E power cable
External power cableBrown----LinBiue Nin
Insulation layerClip
ut
02E power cable-Nout---Lout/Green ----GND
Biue----NinYellow/Green----GND
terminal
able hole
ower cable
ut
External power cableBrown----LinBiue----Nin
3
n ----GND Yellow/Green----GND
1.Installing the AC Power Cable of the BT
The cross-sectional area of the AC Power cable betwAWS frequency band and an SPD60D is 4.0 mm2 .The cross-sectional area of the AC Power cable betwband and an SPM60A is 2.5 mm2 .There are two types of the AC surge protection box (procedure is the same. The following part uses SPD6
External power cableExternal power cable
BTS3902E power cable
2 Installing the DC Power Cable of BTSBand)
1
TS3902E
ween a BTS3902E working at the 1.9 GHz, 2.1 GHz, or
ween a BTS3902E working at the 850MHz frequency
SPD60D and SPM60A), for which the installing 60D as an example to describe.
S3902E(Working at The AWS Frequency
Power cable
4
Installing the signal Cable1 Installing an FE/GE Fiber Optic Cable
1. Installing the optical module
A fast Ethernet or gigabit Ethernet (FE/GE) cable or fiber
1. R
2.Preparing the FE/GE Optic Cable
1. Rst
2. Tuth
DLC connector
Traction cablescables
3. Installing FE/GE Optic Cable
Clamping jaw
Socket
Clamping jaw
1
e
r optic cable must be installed for BTS3902E as required.
emove the dustproof cap of the optical module andemove the dustproof cap of the optical module and tore it properly for future use.urn the puller of an optical module outwards and insert
he optical module into the OPT0 port on the BTS3902E.
Inner gasket e gas et
1. Sort the optical fibers, remove the dustproof cap from the optical fiber connector, and insert the DLC connector into the optical module.
2. Align the clamping jaw on the inner gasket with thethe inner gasket with the socket of the OPT0 port on the BTS3902E. Insert and fit the clamping jaw into the socket.
3. Push the outer gasket of the round connector upwards and tighten the outer gasket until you hear a click sound
5
until you hear a click sound.
2 Installing an FE/GE Cable
A fast Ethernet or gigabit Ethernet (FE/GE) cable or fiberequired.
3 Installing a Cascading FE/GE Fiber O
When multiple BTS3902Es implement transmission oveinterconnected using a cascading FE/GE fiber optic cablThe OPT1 and ETH ports cannot be both enabled for th
1
er optic cable must be installed for BTS3902E as
Optic Cable
er FE/GE optical ports, the BTS3902Es are le.he same BTS3902E.
6
4 Installing a Cascading FE/GE Cable
When multiple BTS3902Es implement transmission oveinterconnected using a cascading FE/GE cable.The OPT1 and ETH ports cannot be both enabled for th
5 (Optional) Installing the Alarm Cable
1
er FE/GE electrical ports, the BTS3902Es are
he same BTS3902E.
MON port
DB15 male connector
7
(Optional) Installing a BTS3
You must install a radio frequency (RF) jumper when a B
1. Installing the BTS3902E RF jumper
Type N connector
2. Wrap the connector of the BTS3902E
PVCinsulation
Waterproof tapePVCinsulation tape
a. Wrap a layer of PVC insulation tape around the cb. Tightly wrap three layers of waterproof tape aroun
up, the second layer from top down, and the thirdc. Tightly wrap three layers of PVC insulation tape a
bottom up the second layer from top down and tbottom up, the second layer from top down, and td. Bundle cable ties 3 mm to 5 mm away from the e
When wrapping waterproof tape, stretch the tape ev When wrapping insulating tape , do not stretch it. Wrap each layer of tape around the connector tightlyoverlaps more than 50% of the preceding layer.
E th t th id ith dh i t i d
1
Ensure that the side with adhesive tape is covered o When cutting off the cable tie, reserve a surplus leng
3902E RF Jumper
BTS3902E uses an external antenna.
E RF jumper
tape
onnector from bottom up. nd the connector, with the first layer from bottom layer from bottom up.
around the connector with the first layer from the third layer from bottom upthe third layer from bottom up. nd of insulating tape.
enly until it is twice of the original length.
y and neatly, and ensure that each layer of tape
th d t
8
on the wrapped tape.gth of 3 mm to 5 mm.
(Optional) Installing a Camo
There are two types of the BTS3902E. This documen
1. Moving the upper housing
ypinstall the housing.
U
2 Installing the camouflage shell2. Installing the camouflage shell
3. Installing the upper housing
(1) Camouflage shell(2) Slots(3) Tabs
3. Installing the upper housing
HU
1
ouflage Shell
nt uses one type as the example to describe how to yp p
Upper housing
UAWEI TECHNOLOGIES CO., LTD.
9
Huawei Industrial Base Bantian Longgang Shenzhen 518129
Peoples Republic of Chinawww.huawei.com