Blueprint Session 3 Pm Maintenance Work Orders Workshop

Post on 26-Oct-2015

31 views 1 download

Tags:

description

Blueprint Session 3 Pm Maintenance Work Orders Workshop

Transcript of Blueprint Session 3 Pm Maintenance Work Orders Workshop

Workshop: Maintenance Work

Orders

May 9, 2006

Project Goals

Implement SAP Plant Maintenance system

Provide integration with Finance, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Accommodate the use of GIS with SAP Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and

equipment Utilize standard SAP functionality to collect utility usage and cost

information for recharge calculations

Agenda

Introduction

Discussion of Maintenance Work Orders

Preview of Next Blueprinting Session

Other Discussion

What is the SAP Work Order Process?

Work Order This is a financial and work management transaction which is used to

plan and charge labor, stock materials, non-stock purchases, and services

It is integrated with Financials, Materials Management, and Human Resources

It may be created from a Notification or without an existing notification A notification may be automatically created while creating a Work

Order

Why should a work order be used?

To document the costs of an event

To accumulate charges for work which will be recharged to others

For Preventive Maintenance work

What information does a work order capture?

Descriptive information. This includes “long text” which is of unlimited length

A priority for the work A object to be maintained: A functional location (Building, Room) or

piece of Equipment Contact information for the person reporting the problem or requesting

work The ability to assign a responsible person to this work order Planned labor and materials Actual labor and materials costs

What information is required?

SAP requires a description, Functional Location or Equipment, and Work Center

Work Order Types

Order TypeOrganization Description

Recharge Settlement Rule Release

PMC1 CPPD General Maintenance Order Default-Building ManualPMC2 CPPD Preventive Maintenance Order Default-Building AutomaticPMC3 CPPD Recharge Work Order/Project Manual ManualPMM1 MPPD General Maintenance Order Default-Building ManualPMM2 MPPD Preventive Maintenance Order Default-Building AutomaticPMM3 MPPD Recharge Work Order/Project Manual ManualPMM4 MPPD Emergency Work Order (Auto) Default-Building AutomaticPMH1 HOUS General Maintenance Order Default-Building ManualPMH2 HOUS Preventive Maintenance Order Default-Building AutomaticPMH3 HOUS Recharge Work Order/Project Manual ManualPMH4 HOUS Damage/Vandalism Work Order Manual ManualPMU1 UTIL General Maintenance Order Default-Building ManualPMU2 UTIL Preventive Maintenance Order Default-Building AutomaticPMU3 UTIL Recharge Work Order/Project Manual Manual

Some Order Types from Other SAP Installations

Repair Preventive Maintenance Sales (Recharge) Safety Related Capital Project Standing Work Order Emergency

What does the “Priority” do?

It can determine the dates based upon predefined criteria for each priority

The “Start Date” is calculated based on the current date. It may also include a “Start Time”. (Dates and times for this calculation may be in minutes, hours, or days.)

The “End Date” is also calculated based on the current date.

(Note: The Start Date and End Date calculation may be in different units.)

Each Order type may have its own set of priorities or several order types may share the same set of priorities

What are Maintenance Activity Types?

This field is used to further define the type of work being performed. Some examples:

Modify/Convert/Improve Maintain Predictive/Inspection Regulatory Correct/Repair/Replace Training Project support Refurbish Stores Parts Routine Maintenance Lubrication Safety Rework

Each order type may have its own Maintenance Activity Types

What are User Statuses?

SAP tracks the process of a work order via System statuses. Some examples are Created, Released, Technically Completed, Closed

There is the ability to use a separate field “User Status” to add statuses which may be used for additional tracking. Some examples:

Cancelled Transferred to another work group Waiting for Parts Waiting for Contractor Waiting for Customer

A different group of User Statuses may be set up for each order type Some order types may have NO User Statuses

What are Order Scheduling Options?

There are 3 primary scheduling types for orders: No Scheduling, Forward Scheduling, Backward Scheduling

SAP normally performs scheduling by calculating the labor required and either adding to the start date to determine the end date or subtracting from the end date to determine the start date

“No Scheduling” allows control of the dates independently of the labor requirements

Each order type is assigned a scheduling method

What are Shop Papers?

SAP uses the term “Shop Papers” to describe printed work orders A sample is provided with the system. (It is NEVER used—it’s just a

sample!) It is possible to have a different Shop Paper for each order type,

although that is a lot of design work A sample follows

Sample Shop Paper-1

Sample Shop Paper-2

What is the Object Info Box?

The Object Info Box tracks the number of orders or notifications created for a certain building, room, or equipment in a given time period

For example: 3 orders in a year or 2 orders in a month, etc.

Several order types may share the same Object Info Box criteria

A sample display follows

Sample Object Info Box

What is a Sub Order?

A suborder is a work order which has a link to a “superior” order

The costs of suborders my be viewed from the “superior” order

These are typically used to break a project into units by craft or shop. Each shop can estimate its costs on a suborder and these can be tracked at the suborder and superior order level.

The costs of the suborders may either settle to the superior order or directly to the receiving cost object.

Suborders may have suborders!

Work Order Fields

Determine which fields should be eliminated because they will not be used

Determine which fields should be required (if any) Sample screens follow this presentation

Topics For Next Blueprinting Session

Determine Work Order Completion Processes Time Recording for Payroll and Recharge Closing (and Updating) Notifications Closing Orders Time Confirmations and Reversals Non-time Confirmations - Documentation

Work Order Screen Copies - 1

Work Order Screen Copies – 1.1

Work Order Screen Copies – 2

This is the second tab-Operations

Work Order Screen Copies – 3

This is the third tab-Components (Maintenance Materials)

Work Order Screen Copies – 4

This is the fourth tab-Costs

Work Order Screen Copies – 4

This is the sixth tab-Objects. Additional notifications are assigned to the order here.

The other tabs are display only.