balustrading to mezzanine

Post on 16-Oct-2021

5 views 0 download

Transcript of balustrading to mezzanine

GYM AREAPoint fixed SGS double glazed'frameless' system withinexisting opening width

SGS single glazed 'frameless' systemscreen. Panes fixed to glass fins usingstainless spider fittings.

Remove all vegetation rooting, carefullystitch across areas of instability in helifix orcintec carefully maintaining all historic profiles.

Gravity grout voids in lime.

Consolidate structure either side of new westfront in lime mortar retaining the historicprofile where possible.

New feature staircase with SGSglass balustrading and etchedglass treads

SGS frameless glassbalustrading to mezzanine

New opening in stone wall withOak lintols over

GLASS FIN ROOFCONNECTION?

GLASS FIN ROOFCONNECTION?

GLASS FIN FLOORCONNECTION TBC BYGLAZING COMPANY

GLASS FIN FLOORCONNECTION TBC BYGLAZING COMPANY

STUDY 1

Land drain

Investigate location ofopening and reinstate.

Carefully remove infill to all window openings.Assess condition of mullion windows.Repair damage to profiles where essential andstitch cracks, indent stone as necessary andreplace mullions where required.Apply lime shelter coat to stone surround.

New windows set behind surround.

E

E

D

D

C

C

123456

GD 1.2

FD 1.0

GD 1.1

Ø37

Ø37

3967

FFL

to

u/s

jois

ts

2101

Steel framework, purlins &bracing as designed byStructural Engineer.(Refer to drawing 18326/03)

Foundation bottom not lessthan 1000mm below groundlevel and as approvedby Local Authority BuildingControl.

balustrading to mezzanine

250 x 150 x 6mm RHS to structural engineersdesign supported in mortises in extg walls?

Joists fixed to RHS22mm Oak floor boards

100mm mineral wool insulationTy-Mawr Basecoat for Boards 1 x 9mm

(meshed) and 1 x 3mm Topcoat Plaster

Heavy duty joist hanger

SGS 20mm glass balustrading

Stainless steel trimmer

Stop bead to concealedge of plasterRHS paint colour to

be agreed

t.f.e.w.

MR I BURGESS

OLD GWERNYFED,VELINDRE, BRECON,

PROPOSED SECTION B-B

Hook Mason LimitedStudio2 Thorn Office Centre,Rotherwas, Hereford.HR2 6JT

01432 35229901432 352272info@hookmason.co.ukhookmason.co.uk

hookmason consulting

SCALE DATE DRAWING NO.

DRAWN BY CHECKED BY

@ A2

1:50 ApproxSL

10.02.21 5298-7-29DDO NOT SCALE FROM THIS DRAWING FIL

PROPOSED SECTION B-B

SECTION DETAIL 1:10

REVISIONS

C 22.06.21 Drawings updated to structural engineers details. SL

0m 54321SCALE BAR 1:50

D 01.07.21 Drainage updated. SL