DOMOSTATIKES MELETES

ASSIGNMENT NAME

CountryLocationClientStart dateCompletion

Other

Consortium LeaderConstruction Cost (Value of the Services providedpercentageAssignment state

Narrative description of Project

Road tunnel with Length of 1512,95mprovision is made for two parking niches along the road tunnel.

The overpasses of the Livadiahave to be constructed. The structures comprise of two rows of sheet pile wa

Description of services provided within the assignment:

The deliverables included NATM for six categories of support measures (A to F).

As far as the final (inner) lining is concerned, static calculations were perftunnels,

1 000

904.

47

901.

34

893.

27

907.

72

907.

58

907.

26

×È

:1+

019

.79H

:90

7.58

90 7. 12

R=11000.00T=100.41f=0.46

Ó3

3.25

6.2

4

14.

00

sdsl

m

136

2700

Á103

ÐÑÏ Ó

Î ENOÄOXEIO

ANEMÙËIA

K103

ÐÑÏÓ ÄÅË

ÖÏ ÕÓ

DOMOSTATIKES MELETES

ASSIGNMENT NAME

Country: Location: Client: Start date (month / Completion date (month

Other members of partnership

Consortium Leader:Construction Cost (€)Value of the Services providedpercentage: Assignment state:

Narrative description of Project

Road tunnel with Length of 1512,95mprovision is made for two parking niches along the road tunnel.

The overpasses of the Livadiahave to be constructed. The structures comprise of two rows of sheet pile wa

Description of services provided within the assignment:

The deliverables included NATM for six categories of support measures (A to F).

As far as the final (inner) lining is concerned, static calculations were perftunnels, the corresponding niches

1 2001 100

986.

88

979.

73

971.

95

961.

77

949.

04

937.

63

923.

9192

2.83

920.

57

911.

00

911.

59

911.

21

910.

78

910.

31

909.

78

909.

27

908.

8690

8.79

908.

35

907.

95

×È

:1+

127

.76H

:90

9.99

×È

:1+

120

.20H

:90

9.79

75.3

0

68.5

2

61.1

7

51.

46

39.2

6

28.3

6

15.0

6

14.0

4

12.2

2

3.05

ΡQbc

sdsl

fcg

sdsl

fcg

sdsl

sdsl

sdsl

m

?

?

?

?

?

? fcg

134

135

ΜΑΝΔΡΑ ΟΙΚΟΔΟΜΩΝΠΛΑΚΑΚΙΑ

N

ΤΕΧΝΙΚΟ

ΑΝΩ ΔΙΑ

ΒΑΣΗΣ K.O.3 - K.O.2 (ΣΗ

ΡΑΓΓΑΣ) L=63.05m

ΠΑΣΣΑΛ

ΟΤΟΙΧΟΣ

134

135

136Á103

134A

ÐÑÏÓ

AÑAXÙ

BA

DOMOSTATIKES MELETES S.A.

ASSIGNMENT NAME:

/ year): month / year):

of partnership (if any

: €):

Value of the Services provided / Participation

Narrative description of Project:

Road tunnel with Length of 1512,95mprovision is made for two parking niches along the road tunnel.

The overpasses of the Livadia-Arahova at the tunnel entrance (length of 24m) and ohave to be constructed. The structures comprise of two rows of sheet pile wa

Description of services provided within the assignment:

The deliverables included the evaluation of the geotechnical investigations as well as the NATM for six categories of support measures (A to F).

As far as the final (inner) lining is concerned, static calculations were perfthe corresponding niches as well as the cross

1 300

967.

18

975.

06

971.

87

961.

97

972.

21

979.

02

980.

28

983.

27

988.

5098

8.86

912.

72

912.

80

912.

82

912.

79

912.

72

912.

59

912.

41

912.

19

911.

9191

1.87

×È

:1+

289

.79H

:91

2.66

9 14. 30

R=8000.00T=162.03f=1.64

Ó4

54.4

5

62.2

6

59.0

5

49.1

8

59.4

9

66.4

3

67.8

7

71.0

9

76.5

9

77.

00

fcg

sdsl

sdsl

Qbc

Qbc

?

?

??

?

sdsl

sdsl

Ρ

131

132

133

2600

KO3

ΤΕΧΝΙΚΟ

ΑΝΩ ΔΙΑ

ΒΑΣΗΣ K.O.3 - K.O.2 (ΣΗ

ΡΑΓΓΑΣ) L=63.05m

ΤΕΧΝΙΚΟ

ΑΝΩ ΔΙΑ

ΒΑΣΗΣ K.O.3 - K.O.2 (ΣΗ

Ρ . ΔΙΑΦΥΓ

ΗΣ)L=63.05m

132

K03

133

ÐÑÏÓ

AÑAXÙ

BA

if any):

Participation

Road tunnel with Length of 1512,95m and Escape Tunnel with length of 1297,52m, which connect with 4 crossprovision is made for two parking niches along the road tunnel.

Arahova at the tunnel entrance (length of 24m) and ohave to be constructed. The structures comprise of two rows of sheet pile wa

Description of services provided within the assignment:

the evaluation of the geotechnical investigations as well as the NATM for six categories of support measures (A to F).

As far as the final (inner) lining is concerned, static calculations were perfas well as the cross

1 5001 400

989.

49

989.

15

978.

93

976.

17

972.

85

970.

92

969.

99

968.

81

964.

49

910.

54

910.

82

911.

10

911.

37

911.

65

911.

93

912.

20

912.

42

912.

60

×È

:1+

451

.82H

:91

2.05

78.9

5

78.3

3

67.

83

64.8

0

61.

20

58.9

9

57.7

9

56.3

8

51.8

9

Qbc

Qbc

?

sdsl

sdsl

sdsl

sdsl

sdsl

130

KO2

131

600

A

A

ΤΕΧΝΙΚΟ

ΑΝΩ ΔΙΑ

ΒΑΣΗΣ K.O.3 - K.O.2 (ΣΗ

Ρ . ΔΙΑΦΥΓ

ΗΣ)L=63.05m

130

KO2

131

ÐÑÏÓ ËÉÂ

ÁÄÅÉÁ

GREECE Arahova EYDE- HIGHWAY

2009 2011

E/M Design: Hydraulic DesignTopographical Geological DesignGeotechnical

G. Parigoris 12.949.691,40(21) 435.230,03PHASE A’ : Approved

and Escape Tunnel with length of 1297,52m, which connect with 4 crossprovision is made for two parking niches along the road tunnel.

Arahova at the tunnel entrance (length of 24m) and ohave to be constructed. The structures comprise of two rows of sheet pile wa

Description of services provided within the assignment:

the evaluation of the geotechnical investigations as well as the NATM for six categories of support measures (A to F).

As far as the final (inner) lining is concerned, static calculations were perfas well as the cross-passages.

1 7001 600

82

81 10

31.2

8

1024

.16

1017

.41

1012

.18

1004

.95

999.

55

993.

75

987.

45

987.

02

908.

04

908.

31

908.

59

908.

87

909.

15

909.

43

909.

71

909.

98

910.

26

123

.24

115.

85

108

.82

103

.31

95.

80

90.1

2

84.

04

77.4

7

76.

76

Qbc

Qbc

?

sdsl

sdsl

sdsl

sdsl

200

201

Á101

69

0000

0050

ΠΛΑΤΕΙΑ ΧΩΡΟΣ ΠΡΑΣΙΝΟΥ

άγαλμα

πεζοδρόμιοπεζοδρόμιο

ΧΩΡΟΣ ΣΤΑΘΜΕΥΣΗΣ

HIGHWAY – PATHE

Dektis consultantDesign: Dedalos DESIGN

opographical Design: E.T.ME. PEPPAS & ASSOCIATES LTDDesign: Feggaras Georgios

Geotechnical Design: A.D.F.

12.949.691,40€ + 3.303.910,60.435.230,03€ / 40%- (8)

Approved -----------

and Escape Tunnel with length of 1297,52m, which connect with 4 cross

Arahova at the tunnel entrance (length of 24m) and ohave to be constructed. The structures comprise of two rows of sheet pile walls connected via a roof plate.

the evaluation of the geotechnical investigations as well as the

As far as the final (inner) lining is concerned, static calculations were performed The final design of the cover&cut overpasses was also performed.

1 9001 800

1066

.14

1062

.31

1060

.94

1059

.33

1057

.33

1054

.58

1052

.09

1047

.47

1035

.13

1033

.34

905.

53

905.

81

906.

09

906.

37

906.

64

906.

92

907.

20

907.

48

907.

76

907.

86

160.

61

156

.50

154.

86

152

.97

150

.69

147.

66

144

.89

140

.00

127.

37

125.

48

Qbc

Qbc

k7-8

k7-8

??

?

?

sdsl

sdsl

sdsl

sdsl sdsl

69

ΧΩΡΟΣ ΣΤΑΘΜΕΥΣΗΣ ΔΗΜΟΤΙΚΟΣάσφαλτος

άσφαλτος

άσφαλτος

Arahova

consultant engineers LTDDESIGN consultant

E.T.ME. PEPPAS & ASSOCIATES LTDFeggaras Georgios

A.D.F. consultant Geotechnical

+ 3.303.910,60.€ 191.118,00€ +14740,60

-------------PHASE Β’ to be approved

and Escape Tunnel with length of 1297,52m, which connect with 4 cross

Arahova at the tunnel entrance (length of 24m) and of K.O.2 and K.O.3 (length of 60m) roads at the tunnel exit will lls connected via a roof plate.

the evaluation of the geotechnical investigations as well as the final

ormed for the final design of The final design of the cover&cut overpasses was also performed.

2 1002 000

1078

.77

1079

.68

1078

.92

1079

.03

1075

.26

1073

.88

1075

.00

1075

.27

1073

.15

903.

03

903.

30

903.

58

903.

86

904.

14

904.

42

904.

70

904.

97

905.

25

175

.74

176

.37

175.

34

175

.17

171.

12

169

.46

170.

30

170

.29

167

.90

Qbc

k7-8

k7-8

?

??

?

sdslsdsl

Ρ

ΧΩΡΟΣ ΣΤΑΘΜΕΥΣΗΣ ΔΗΜΟΤΙΚΟΣάσφαλτος

Arahova Bypass

engineers LTD consultant engineers LTD

E.T.ME. PEPPAS & ASSOCIATES LTD

Geotechnical engineers LTD

+14740,60 € +43744,10 € to be approved

and Escape Tunnel with length of 1297,52m, which connect with 4 cross-

f K.O.2 and K.O.3 (length of 60m) roads at the tunnel exit will lls connected via a roof plate.

final design for the preliminary support according to the

for the final design of all the crossThe final design of the cover&cut overpasses was also performed.

2 200100

1010

.86

1017

.74

1024

.65

1031

.95

1037

.71

1043

.57

1049

.64

1057

.70

1067

.51

900.

52

900.

80

901.

08

901.

36

901.

63

901.

91

902.

19

902.

47

902.

75

110.

34

116

.94

123

.57

130.

59

136

.08

141

.66

147.

45

155

.24

164.

76

Qbc

k7-8

k7-8

??

sdsl sdsl

sdsl

fshfsh?

Ù4E62

63

engineers LTD E.T.ME. PEPPAS & ASSOCIATES LTD

engineers LTD

€ +43744,10 € /100%

-passages. Due to the tunnel’s length

f K.O.2 and K.O.3 (length of 60m) roads at the tunnel exit will

design for the preliminary support according to the

all the cross-sections of the road and escape The final design of the cover&cut overpasses was also performed.

2 4002 300

962.

00

963.

4796

4.32

968.

10

971.

58

972.

31

981.

09

988.

72

1001

.27

1007

.29

1010

.86

898.

29

898.

5389

8.57

898.

85

899.

13

899.

41

899.

69

899.

96

900.

24

900.

40

900.

52

63.7

1

64.

94

65.

75

69.2

5

72.4

5

72.

90

81.

41

88.

76

101

.03

106.

89

Qbc

k7-8

?

sdsl

fsh

?

57

ΠΡΟΣ ΔΕΛΦΟΥΣ

ΠΡΟΣ ΑΡΑΧΒΩΒΑ

1160

1150

59

58

611200

/100%

passages. Due to the tunnel’s length

f K.O.2 and K.O.3 (length of 60m) roads at the tunnel exit will

design for the preliminary support according to the

sections of the road and escape The final design of the cover&cut overpasses was also performed.

2 6002 500

907.

99

914.

97

921.

33

923.

38

933.

06

936.

59

942.

67

948.

23

952.

19

956.

82

895.

79

896.

07

896.

26

896.

35

896.

62

896.

90

897.

18

897.

46

897.

74

898.

02

10.4

6

12.

21

18.

91

25.

07

27.0

4

36.

44

39.6

9

45.

49

50.7

7

54.4

6

58.

81

Qbc

m

Qbc

?

sdsl

sdsl

sdsl sdsl

fsh

?

?

ΑΜΥΓΔΑΛΙΕΣ

1100

1050

56

Á4E

55

54

53

TG2

Χ.Θ. 1+084.00

ΤΕΧΝΙΚΟ ΑΝ. ΔΙΑΒΑΣΗΣ ΥΦΙΣΤΑΜΕΝΗΣ ΟΔΟΥ L=24.00m

X .Θ

. 0+ 3

14.3

2

ΤΕΛ

ΟΣ ΜΕΛ

ΕΤΗΣ ΔS

R3

ÃÓ1

Y

O

K

L

R

E

A

ΑΡΧΗ ΤΕ

ΧΝΙΚΟΥ Α

.Δ.

Χ.Θ. 1+060.00

L=16.99m

ΑΡΧΗ

ΠΑΣΣΑΛΟΤΟΙΧΟΥ

Χ.Θ. 1

+058

.22

ΤΕΛΟΣ ΠΑΣΣΑΛΟΤΟΙΧΟΥ

Χ.Θ. 1+0

41.23

B

57

passages. Due to the tunnel’s length,

f K.O.2 and K.O.3 (length of 60m) roads at the tunnel exit will

design for the preliminary support according to the

sections of the road and escape

2 700

893.

71

895.

38

896.

04

900.

91

905.

97

894.

29

894.

65

894.

87

895.

23

895.

51

×È

:2+

677

.63H

:89

4.99

0.5

8

0.731.175.

68

fm

Qba

sdsl

Qba

?

Χ.Θ.=1

+027.50

ΤΕΛΟΣ ΓΕΦΥΡΑΣ

Γ2

52

ΤΕΧΝΙΚΟ ΑΝ. ΔΙΑΒΑΣΗΣ ΥΦΙΣΤΑΜΕΝΗΣ ΟΔΟΥ L=24.00m

ΠΡΟΣ ΑΡΑ

ΧΒΩΒΑ