JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Argo StatusArgo TC, M. Belbeoch

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Indicators (Core Argo)Category Indicator Method Target Note

STATUS Activity 108% Nb Active units vs target

3200 3473/3918

Intensity 89% Nb Deployed over last 12 months vs target

800 ? for the core array

715/1027units

Density 56% % of 6x6 well sampled

Certainly not 100 %

To refine metric

DATA Delivery 90%, 95% Nb of platforms distributing data vs registered

GTS , GDACs100%, 100%

3520/ 3918,3749/ 3918

Quality 93%, 88% % Profile with « good » data

TEMP, PSAL3rd Quarter

DM Processing 70% Ratio DM/DM Eligible

100% As of 01/10/2015

Timeliness 89% (GTS)81% (GDACs)

Nb Obs. < 24h vs Total Obs.

100%, 100% September

Delays 7h, 25h (GTS)11h, 35h (GDACs)

Median , Average Delay

24h September

INSTRUMENTATION Reliability 85% Average age of latest dead floats

1500 days 1281 days3rd quarter

Half-life 91% % surviving 750 days

100% 901/985Deployed [T-1115;T-750]

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

ActivityWith 3473 floats the activity indicator for the core Argo array is 108%

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

NetworksFirst deep Argo floats (ARVOR_D, NINJA_D, SOLO_D) are operating

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density (core)56% of the core array is well (or over) sampled

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density/Age (core)49% if we consider decimal floats (weighted by their probability to die)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density/Age (core)Spatial analysis allows to identify hot/cold spots and highlight gaps.Below 45°S in Indian and Atlantic in particular.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Member States28 Countries operate floats, and Argo is reaching new record with 3918 active floats.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Member StatesActually more than 150 additional floats are registered but no data is available yet. Argo has certainly more than 4000 units in the ocean.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Member States (zoom)France just the 2nd float operator after USA.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Market

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Market« New » float manufacturers (SBE and NKE in particular) keep increasing their market.Iridium (and BioArgo) seem stabilizing

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

All Deployments (<2015)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

New Floats (2015)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

All Deployments (<2016)750 units deployed so far in 2015

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

AgeFloat age distribution (in years)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Age (inactive floats)All inactive floats deployment locations by age class indicating how long float perform according to their launch location.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Age (inactive floats)Spatial Analysis

We can try identify cold/hot spots where floats seem surviving shorter (blue - marginal sreas, high latitudes) or longer (red -Karahoa deployments ?)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Kaharoha’s contribution~20% of the active Argo array is implemented by one NZ ship (charter)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Age

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

AgeSpatial analysis to detect geographical hot/cold spots. Blue or young zone vs red/old zone.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density (SIO)Percentage of the density upon full implementation by Scripps

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density 6° x 6°For the Global array, southern ocean remains the challenge

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density/Age 6°x 6°

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Density/Age vs Plans

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Deployment Plans ScoreUse teh follwoing map to optimize your deployment locations if required.

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

PlansPlease provide yoru draft plans as soon as possible and in any format.Standrda JCOMMOPS txt format is gradually used by all programmes:

ID (any);WMO (if exists);LAT;LON;DATE;SHIP;CRUISE

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

ProfilesDelayed mode quality control still remain a challenge (% achived keeps decrfeasing slowly)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Profiles Quality (Sep. 2015)A quick virew on 2015 3rd quarter profiles quality.90% of profiles produced are « good ».

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Delays GTS

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Delays GDACs

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

GDACs Timeliness, DACs

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

GDACs Delays, DACs

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

GTS Timeliness (June)90% of GTS profiles are distribute within 24H. Missing Canadian stats for September (changed header), missing Indian stats (being resolved)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

GTS Delays (Sep. 2015)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Reliability

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Argo Global Design (draft)

JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015

Links

• Report• ftp.jcommops.org/Argo/Doc/2015-09-AIC.xlsx • ftp.jcommops.org/Argo/Doc/2015-09-AIC.pdf

• Maps• http://argo.jcommops.org/maps• ftp.jcommops.org/Argo/maps/LATEST/

• News• http://www.twitter.com/jcommops