Post on 04-Jun-2018
8/13/2019 Arena Proposal
1/14
Existing Building/ Area
Proposed for Future Development
Existing Building/ Area
Proposed for Future Development
Existing Building
Proposed for
Future Development
8/13/2019 Arena Proposal
2/14
OUTLINE OF PRACT
FACILITIES ABOVE
EXISTING PARKING
PLAYER ACCESS PARKING
UP
VIP ENTRY
EVENTLOADING EXIT
RAMP
PRESS/EMPLOYEE ENTRY
OUTLINE OF CURB
VIP ENTRY PARKING RAMP
VIP P1 EXITPARKING RAMP
EVENT LOADINGENTRY RAMP
PLAYER AND COAC
ENTRY LOBBY AND
CONNECTION
PROPOSED PLAYER
COACHES AND VIP
PARKING. TOTAL O
LEVELS +/- 200 STA
PROPOSED VIP, BE
GRADE PARKING. T
TWO LEVELS +/- 75
PLAYERS,COACHES & VIPENTRY & EXIT
PARKING RAMP
VIP ENTRY & EXIT
PARKING RAMP
OUTLINE OF BUILDI
ARENA EVENT LEV
VIP ENTRY
SECTIO
N1
SECTION
2
SECTION3
VIP ENTRY
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Event Level Parking Plan
8/13/2019 Arena Proposal
3/14
22
23
23
22
22
22
22
24
25
25
25
26
26
2626
8
8
8
11
11
11
1
16
17
18
18
19
19
19
18
21
11
11
20
3
31
22
20
23 17
30
36
37
38
13
12
15
50
41
18
3
11
9
7
8
47
42
47
8
35
43 44
25
45
29
21
49
34
8
8
9
9
46
8 810
8
8
5
10
4
12
40
14
16
17
1924
26
17
19
32
27
8
48
33
19
39
32
51
52
52
EXISTING
PLAYER AC
52
47
47
PLAYER
PAR
19
SECTIO
N1
SECTION
2
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Event Level Plan
8/13/2019 Arena Proposal
4/14
22
23
23
22
22
22
22
24
25
25
25
26
26
2626
8
8
8
11
11
11
1
16
17
18
18
19
19
19
18
21
11
11
20
3
54
4
3
6
7 8 9 10
1
1
2
3
1
1
2
13
DN
PA
GA
14
SEC
TION1
SECTION
2
DN
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Lower Mezzanine Plan
8/13/2019 Arena Proposal
5/14
1
1
4
9
9
9
9
9
99
9
9
98
9
10
13
11
11
11
15
16
17
15
15
12
1418
3
5
7
6
5
3
3
3
7
5 5 6 5
44
4
4
5
5
4
45
5
4
45 5
4
5
4
5
4
4
813
12
4
11
10
5
5
4
9
9
9
9
9
TRUCK RAMP
10
9
9
99
4
EVENT PLAZA
ARENA ENTRANCE
SEC
TION1
SECTION
2
ARENA ENT
14
14
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Main Concourse Level Plan
8/13/2019 Arena Proposal
6/14
1
3
3
2
2
2
1
1
1
1
3
3
OPEN
TO
BELOW
OPEN
TOBELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
2
2
SECTIO
N1
SECTION
2
3
3
5
6
7
8
9
10
10
11
5
5
5
5
5
5
4
33
3
3
33
1
1
1 1
12
12
12
12
2
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Loge Level Plan
8/13/2019 Arena Proposal
7/14
12
3
3
4
9
6
6
6 6
6
6
8
10
7
7
OPEN TO BELOW
OPENTOBELOW
OPEN TO
BELOW
OPEN TO BELOW
OPEN TO BELOW
OPENTOBE
LOW
11
11
9
6
6
5
13
13
13
DN
DN
SECTIO
N1
SECTION
2
1
3
2
6
6
6
6
6
10
10
10
6 9
9
6
6
6
7
11
5
5
5
4
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Suite Level Plan
8/13/2019 Arena Proposal
8/14
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
SECTIO
N1
SECTION
2
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Practice Facilities Admin Level
8/13/2019 Arena Proposal
9/14
6
6
6
6
3
3
3 6 65
6
6
6
6
6
6
6
3
3
3
5
6
6
3
3
3 35 5 5
OPEN
TO
BELOW
4
DN
DN
7
7
SECTIO
N1
SECTION
2
3/ SITE PLAN, PLANS, AND BUILDING SECTIONS
DRAFT - FOR DIS CUSSION AND INFORMATIONAL PURPOSES ONLYConfidential - Neither this document nor the contents hereof shall be disclosed, distributed or reproduced without the prior writ
3B// Upper Concourse Level Plan
8/13/2019 Arena Proposal
10/14
ElevationsLandscape Plan
Roof Planemolition Plan
(to be added later)
8/13/2019 Arena Proposal
11/14
DESIGN CONCEPT
The Entertainment and Sports Center (ESC) project involves the construction of an indoor, multi-use
arena at the location of the existing Downtown Plaza shopping center. The arena wouldaccommodate sporting events and entertainment events such as professional and collegiate sports,
concerts, ice shows, indoor rodeo and motor sports, trade shows, large graduations, and other
indoor entertainment shows.
The design concept for the ESC has evolved based on the following objectives:
To create a regional destination and central gathering place;
To create an iconic civic open space;
To create an active entertainment and sports center district that is uniquely Sacramento;
To design and build the countrys mosttechnologically innovative and advanced
entertainment venue that is capable of accommodating the Sacramento Kings and a broad
array of other events in a unique and enjoyable experience for fans and performers;
To develop a sustainable ESC complex that supports smart growth principles and encourages
multi-modal transit options;
To enhance Downtown Sacramento and connect to existing landmarks in the City;
The ESC building design will generally be circular in nature with rectilinear edge buildings that create
streetwalls along surrounding streets. The ESC building would be a multi-level structure clad withmetal, glass and other materials to be determined. Glazing would be concentrated in a manner to
allow views into the ESC concourse levels from the courtyard area, and views into the upper terrace
levels from the surrounding streets. Distinctive lighting and signage would be positioned inside the
facades with glazing and would be visible from inside and outside the ESC, making the facades
visually distinctive and highly visible. A canopy structure composed of columns and framing would be
added on terrace level to provide shade in public plaza areas. The building will be design for
optimum energy efficiency through strategies such as:
The use of thermal displacement ventilation and radiant strategies within the public spaces;
The potential use of onsite thermal energy storage to reduce peak cooling and electricaldemands;
The use of low flow plumbing water fixtures throughout the building;
Sustainable roofing techniques to reduce urban heat island effect, such as roof mounted pv
solar panels, green roof etc; and
Local plant species to reduce irrigation needs.
3-1
8/13/2019 Arena Proposal
12/14
Finally, we are still receiving input and finalizing design accordingly. Therefore, additional information
will be forthcoming as the public process concludes.
3-2
8/13/2019 Arena Proposal
13/14
ColorMaterials Samples(to be added later)
-
8/13/2019 Arena Proposal
14/14
StreetscapeDrawings
(to be added later)
3-17