Annette project shift

Post on 18-Jun-2015

182 views 0 download

Tags:

Transcript of Annette project shift

Annette Friberg, Europeana

Project Life Cycle and Sustainability Projects Group Assembly, 26 September 2013

“Sustainability is the capacity of the project to

continue its existence and functioning

beyond its end. The project results are used

and exploited continuously. Sustainability of

results implies use and exploitation of results in

the long term.”

European Commission – Directorate-General for Education and Culture

Europeana Project Ecosystem

– Chapter 1

– Chapter 2

– Chapter 3

Europeana Project Shift Plan • Important to continue and preserve the work

carried out by the projects during 2-3 years

• Needed a plan that addressed specifically content, partnerships, knowledge once a project ends

• Project Shift Plan – The three scenarios

– Surveys

– A triangle collaboration between project partners, project coordinator and Europeana

Consultation and Surveys

A core group of projects was consulted in the

development of the Project Shift Plan in 2011:

Elocal (Mary/Rob/Runar/Olga), Athena (Maria-Teresa)

EU Screen (Johan Oomen), Carare (Stuart Jeffery &

Henrik Jarl Hansen) EFG (Georg Eckes and Kerstin Herlt)

Use cases;

EuropeanaLocal (ending May 2011)

Athena (ended April 2011)

Projects Lifecycle

Year 1 Year 2 Year 3

Content &

Partners

Current Project

Ending 2011: Athena, Elocal, Ev1,

EFG, EConnect, ApeNet, ETravel,

MIMO, Judaica , Arrow, BHL Europe

Year 5 Year 4 Year 6

?

Scenario1 - Project Ends

Year 1 Year 2 Year 3

Content &

Partners Project

Scenario 2 - Follow up project

Year 1 Year 2 Year 3

Content &

Partners Project 1 Project 2

Year 1 Year 2 Year 3

Scenario 3 - Aggregator

Year 1 Year 2 Year 3

Content &

Partners Project

Dark

aggregator

Aggregator

with portal

“And now…”

Evaluate, min. 6 months before the projects

ends, which scenario your project will choose

Get in contact with Europeana and let us know

************************************

Projects ending, we suggest to use the process

outlined in the PROJECT SHIFT PLAN

Project Shift Plan Process by

Scenario 1 - Projects End

• Survey

• Re-routing

• Data Exchange Agreement

• Europeana Network Membership

– Task forces, AGM, Linkedin, Interest Groups

– Communications (newsletter, social media)

– Ingestion and tech updates, workshops

FOR MORE DETAILS ON THE PROJECT SHIFT

PLAN, PLEASE CONTACT NICOLE,

Thank you,

Annette.Friberg@kb.nl