ALLEGANY-LIMESTONE CENTRAL SCHOOL

2020 CAPITAL IMPROVEMENT PROJECT

KEY FEATURESELEMENTARY BUILDING RENOVATIONS- SIDEWALK AND RAMP REPLACEMENT- RADIANT HEAT SIDEWALKS- MULTIPURPOSE ROOM RENOVATIONS- GYMNASIUM RENOVATIONS- LOCKER ROOM RENOVATIONS- CORRIDOR FINISH UPGRADES- CORRIDOR DISPLAY CABINETS- STEAM SPACE UPGRADES- CLASSROOM FINISH AND HVAC UPGRADES- KITCHEN AND CAFE RENOVATIONS- LIBRARY FINISHES- TOILET ROOM UPGRADES- BOILER REPLACEMENT- PLUMBING RENOVATIONS- LED LIGHTING UPGRADES- ROOFING UPGRADES

BUS GARAGE RENOVATIONS- BUS LIFT REPLACEMENT- OIL SEPARATOR UPGRADES- TRENCH DRAIN REPLACEMENT- WINDOW REPLACEMENT

PROJECT ALTERNATES- PLAYGROUND SURFACE UPGRADES- COURTYARD RENOVATIONS- SOLAR RENOVATIONS

The Board of Education and our District Leadership Team have worked hard to ensure the items in this project will support our mission to provide our students with access and opportunities for a well-rounded school experience. We understand that our school facilities serve an important role to our community as a place where families and townspeople come together. Over time, items need to be replaced, repaired, or upgraded to meet the many needs of our students, families, and community members.

CLASSROOM1098

CLASSROOM1093

CLASSROOM1099

CLASSROOM1089

CLASSROOM1090

CLASSROOM1102

CLASSROOM1088

TOILET1096

SINK1097

TOILET1092

SINK1091

SINK1101

TOILET1100

CLASSROOM1087

CLASSROOM1086

SPECIALED.

CLASSROOM1084

VESTIBULE1083A

CLASSROOM1095

RESOURCE1103

STAIR1104

DATA1105

STOR.1107

GIRLS1108

BOYS1109

COMPUTER1110

BOYS1116

GIRLS1111

JANITOR1117

SHOWER1118

TOILET1121

SHOWER1120

OFFICE1122

DRY1119

STORAGE1115

TOILET1124STORAGE

1126LOCKERROOM

1123

MULTIPURPOSE1127

VESTIBULE1128

VESTIBULE1141

TOILET1140

STORAGE1142

OFFICE1129

TOILET1130

DRY1137

SHOWER1138

BOYSLOCKERROOM

1139

DATA1131

OFFICE1132

SPECIALED.

ANCILLARY1135

CLASSROOM1143

GYMNASIUM1145

CORRIDOR1173

ARTROOM

1147

STORAGE1148

TOILET1150

VESTIBULE1149

CONFERENCETEACHER

1151

TOILET1153

TOILET1154

CLASSROOM1152

CLASSROOM1155

CLASSROOM1156

VESTIBULE1157

TOILET1158

CLASSROOM1159

CORRIDOR1164

CLASSROOM1160

VESTIBULE1162

TOILET1161

DATA1166

JANITOR1167

MENS1165

WOMENS1168

CLASSROOM1163

CLASSROOM1169

CLASSROOM1172

SPECIALED.

CLASSROOM1000

CLASSROOM1001

CLASSROOM1002

CLASSROOM1003

CLASSROOM1004

CLASSROOM1005

SERVICEROOM

1005A

CORRIDOR1006

CLASSROOM1017

CLASSROOM1018

ELECTRIC1020

ANCILLARY1016

RESOURCE1015

RESOURCE1014

COMPUTERROOM

1021

GIRLS1022

BOYS1025

JANITOR1023

MENS1024

COPIER1009

BOYS1013

WOMENS1012

JANITOR1011

GIRLS1010

SERVER1008

OFFICE1007

CLASSROOM1027

CLASSROOM1028

CLASSROOM1029

CLASSROOM1030

SCIENCECLASSROOM

1031RESOURCE

1032

CLASSROOM179

CLASSROOM178

PRINCIPALSOFFICE

1006

CORRIDOR1036

CORRIDOR1033

CLASSROOM1037

DATA1039

WOMENS1133

MENS1134

VESTIBULE1050

NURSEOFFICE

1054

TOILET1052

ARTROOM

1056

STORAGE1059

STORAGE1058

KILN1057

MUSIC1060

STORAGE1061

MUSICPRACTICE

1062

CORRIDOR1055

CAFETERIA1083

SERVING1082

JANITOR1081

JANITOR1080

OFFICE1079

LKRS1070

VESTIBULE1114AELECTRIC

1114

RESOURCE1112

RESOURCE1113

CORRIDOR1146

CORRIDOR1094

VESTIBULE1106

CORRIDOR1144

CORRIDOR1085

RECEIVING1077

TOILET1076

KITCHENSTORAGE

1073

GENERALSTORAGE

1072

VESTIBULE1067

MUSIC1065

ELECTRICROOM

1069

BOILERROOM

1068

CORRIDOR1071

KITCHEN1078

PT/OT1038

STORAGE1053

MAILROOM

1002

VAULT1004

OPENOFFICE

1001

EXISTINGVESTIBULE

1008

LIBRARY1026

CORRIDOR1164

TOILETROOM

1003

CORRIDOR1055

CORRIDORS: • REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN

LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL.• PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT

ABOVE.• PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL

SOFFITS, ETC.• AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED

AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT.• REPLACE WALK OFF MAT WITH NEW WALK OFF MAT.• REPAIR ANY DAMAGED TERRAZZO.• PROVIDE FLEXIBLE FURNITURE FOR PREK GATHERINGS IN SENSORY CORRIDOR.• REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN

CORRIDORS.• PAINT EXISTING LOCKERS SCHOOL COLORS.• REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING AND

FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS.

GYMNASIUM: • REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING.• INSTALL NEW ROCK WALL WITH TALLER AREA.• INSTALL NEW DROP-DOWN CENTER CURTAIN.• UPDATE SOUND SYSTEM.• PROVIDE PROJECTION SCREEN.• PA SYSTEM UPGRADES.

MULTIPURPOSE ROOM: • REPLACE BLEACHERS WITH POSSIBLE BLEACHER/RETRACTABLE SEAT SYSTEM.• ADD RETRACTABLE SEATING ON EACH SIDE TO MAXIMIZE NUMBER OF SEATS.• REMOVE BASKETBALL HOOPS.• REMOVE ROCK CLIMBING WALL (NEW TO BE INSTALLED IN GYMNASIUM).• PROVIDE NEW SOUND SYSTEM AND PROJECTION SCREENS.• REFINISH HARDWOOD FLOOR WITH NEW STRIPING.• ACOUSTICAL UPGRADES.• PA SYSTEM UPGRADES, CURRENTLY NOT LOUD ENOUGH.• NEW BATTING CAGE FOR SOFTBALL.

SITEWORK: • REPLACE CRACKED AND DAMAGED SIDEWALKS ADJACENT TO PARKING LOT.• REMOVE WOOD CHIPS FROM PLAYGROUND AND POUR RUBBER SURFACING.• REPLACE RAMP TO PLAYGROUND.• PAINT ALL CHIPPED HANDRAILS.• PROVIDE HEATED SIDEWALKS AT ENTRANCES.

COURTYARD: • REMOVE (2) TREES IN THEIR ENTIRETY.• REMOVE CONCRETE PAVERS AND PARTIAL WALL.• LANDSCAPE ENTIRE COURTYARD WITH NEW SHRUBS, TREES, GRASS AND HARD

SURFACING.• PROVIDE RUBBER SURFACING WITH TIER SEATING FOR CLASSROOM SETTINGS IN

ADDITION TO PICNIC TABLES, BENCHES, AND FLEXIBLE FURNITURE.• PROVIDE ACCESS, INTEREST, AND CONNECTION FROM PLAYGROUND TO

COURTYARD.• PROVIDE DIGITAL GRAPHIC MURAL ON LARGE BRICK WALL.• PROVIDE SUNSHADE FEATURES.

MAKER SPACE (ROOM ADJACENT TO LIBRARY): • UPDATE DIMMABLE LED LIGHT FIXTURES.• PAINT WALLS.• PROVIDE EPOXY RESINOUS FLOORING WITH RESILIENT BASE.• PROVIDE COIL REELS FROM CEILING.• PROVIDE FLEXIBLE, ADJUSTABLE, STEAM STYLE FURNITURE.• INSTALL NEW WINDOWS TO CREATE A PRINT ROOM BETWEEN LIBRARY AND MAKER

SPACE.• PROVIDE STORAGE FOR LIBRARY WITHIN PRINT ROOM.

CLASSROOMS: • INSTALL NEW LVT/SVT FLOORING IN (8) CLASSROOMS THAT HAVE NOT RECEIVED

UPDATES.

LOCKER ROOMS: • RENOVATE LOCKER ROOMS OFF GYMNASIUM FOR USE DURING MODIFIED GAMES

AND OTHER TEAM NEEDS, ALSO LOCATION FOR PE CHANGING AS NEEDED.

KITCHEN/CAFETERIA: • REMOVE EXISTING STOVE AND PROVIDE A NEW 4 BURNER STOVE.• REWORK EMERGENCY GAS SHUT OFF.• ADJUST SERVING LINE BY ANOTHER 5'-0". REMOVE CENTER WALLS BY MILK. PROVIDE

DUAL SIDED CASE FOR ICE CREAM AND MILK.• PROVIDE A/C TO KITCHEN/CAFE AREA.

LIBRARY: • UPGRADE CARPET AND PAINT COLORS.• PROVIDE THEMING.

HVAC: • REPLACE EXISTING CLASSROOM UV's WITH ROOF TOP UNITS WITH A/C.• PROVIDE ISOLATION VALVES AT HEATING SYSTEM TO ALLOW FOR MAINTENANCE ON

SPECIFIC AREAS OF THE BUILDING.• UPGRADE NURSES ROOM VENTILATION.

PLUMBING: • REPLACE EXISTING BACKFLOW PREVENTION DEVICES, POSSIBLE METER UPGRADES.• RELOCATE KITCHEN GAS SOLENOID VALVE TO WALL.• PROVIDE PLUMBING TO POSSIBLE SINK IN STEM LAB.• COURTYARD STORM DRAINAGE UPGRADES AS NEEDED TO ACCOMMODATE NEW

ARRANGEMENT.• PROVIDE ISOLATION VALVES ON DOMESTIC WATER LINES TO ALLOW FOR

MAINTENANCE ON SPECIFIC AREAS OF THE BUILDING.

TOILET ROOMS: • REPLACEMENT OF TOILET PARTITIONS AND FIXTURES.• NEW FINISHES.• CONFIRM SPACES MEET ADA REQUIREMENTS.

ELECTRICAL: • PROVIDE LED LIGHTING REPLACEMENT THROUGHOUT THE BUILDING.

11/12/20192020 CAPITAL IMPROVEMENTS PROJECT SCOPE PLAN

TOTAL CAPITALIMPROVEMENTS REFERENDUM:

$10MPUBLIC VOTE DATE - FEB 11, 2020 12PM-9PM

IN THE MS/HS BUILDING DISTRICT OFFICEPUBLIC INFORMATIONAL MEETING - JAN 14, 2020 6PM

IN THE ELEMENTARY MULTI-PURPOSE ROOM

• UPGRADE EXISTING SPACE TO BE A NEW MAKER STEAM SPACE. • SPACE WILL RECEIVE A FULL WALL OF CABINETRY WITH A SINK.• NEW PAINT, NEW FLOORING & ELECTRICAL UPGRADES TO CREATE A SPACE

WHERE STUDENTS CAN LEARN, CREATE AND COLLABORATE.

• REPLACE WALK OFF MAT WITH NEW WALK OFF MAT.• REPAIR ANY DAMAGED TERRAZZO.• PROVIDE FLEXIBLE FURNITURE FOR PRE-K GATHERINGS IN SENSORY

CORRIDOR.• REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN

CORRIDORS.• PAINT EXISTING LOCKERS SCHOOL COLORS.• REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING

AND FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS.

• REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING.• INSTALL NEW ROCK WALL WITH TALLER AREA.• INSTALL NEW DROP-DOWN CENTER CURTAIN.• UPDATE SOUND SYSTEM.• PROVIDE PROJECTION SCREEN.• PA SYSTEM UPGRADES.

• REPLACEMENT OF TOILET PARTITIONS AND FIXTURES.• NEW FINISHES.• CONFIRM SPACES MEET ADA REQUIREMENTS.

STEAM - SCIENCE, TECHNOLOGY, ENGINEERING, THE ARTS, AND MATHEMATICS

EXISTING

CORRIDOR

CORRIDOREXISTING

TOILET ROOM

BOILER ROOM SIDEWALK

MULTIPURPOSE ROOM

EXISTING

EXISTING

• REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL.

• PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT ABOVE.

• PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL SOFFITS, ETC.

• AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT.

REVENUE SOURCES

CAPITAL RESERVE & FUND BALANCE

25%NYS

BUILDING AID

75%

LOCAL SHARE/TAXES

0%

NOANTICIPATED TAX IMPACT!

PUBLIC VOTE FEB 11, 2020 12PM-9PM

PROJECT DESIGN FEB 2020 – JULY 2020

SED SUBMISSION/REVIEWAUG 2020 – JAN 2021

BIDDING SPRING 2021

CONSTRUCTION SUMMER 2021 – SUMMER 2022

ELEMENTARY SCHOOL

• REPLACEMENT OF 4 EXISTING BOILERS WITH NEW HIGH EFFICIENCY BOILERS• PLUMBING UPGRADES INCLUDED ADDED ISOLATION VALVES AND NEW GAS PIPING• ELECTRICAL PANEL REPLACEMENT

• CRACKED SIDEWALK REPLACEMENT • RADIANT HEATED SIDEWALKS AT FRONT AND PLAYGROUND ENTRANCE