1

FRANK VERHOEVEN

MEMBER OF THE BOARD OF BOSKALIS

ROTTERDAM

JUNE 26, 2012

A CHANGING WORLD

\

2

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

3

Leading global dredging & maritime expert

With 14,000 employees and 1,100 vessels

Active in 75 countries across 6 continents

Customers in Energy, Ports and Infra

Headquarters in Papendrecht, The Netherlands

Record revenue 2011: EUR 2.8 billion

Net profit 2011: EUR 254 million

EBITDA 2011: EUR 591 million

Order book end 2011: EUR 3.5 billion

Listed on NYSE Euronext Amsterdam Exchange

COMPANY

OVERVIEW

\

4

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

5

ASSETS

DREDGING FLEET

\

6

ASSETS

TRANSPORT, TUGS, DSV & HEAVY LIFT

\

7

ASSETS

ENERGY FLEET

Dynamic Positioned Fallpipe vessel – Rockpiper

\

8

STRATEGY

Cost Competitive

Create Added Value

Complexity

Cost

\

9

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

10

SAFETY DEVELOPMENTS

THEN NOW

SAFETY: TOP PRIORITY SAFETY CORE VALUE

REACTIVE APPROACH >

DRIVEN BY PROJECTS

PROACTIVE APPROACH

> DRIVEN BY

CONTRACTOR

TOO THEORETICAL LESS PAPERWORK

\

11

HOW TO DECREASE LTI?

Technology

Systems & policies

Awareness / Behavior

Accid

ent/

incid

ent ra

tes

Time

\

12

\

13

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

14

ENVIRONMENTAL DEVELOPMENTS

THEN NOW

REACTIVE APPROACH >

DRIVEN BY ENV.

PROTECTION AGENCIES

PROACTIVE APPROACH

FIT WORK METHOD TO

PERMITS

ASSIST IN PREPARATION

OF PERMITS

BUILDING WITH NATURE

\

15

BUILDING WITH NATURE

OBJECTIVES

Innovation Program 2008-2012

The mission of BwN: "To show it is possible to develop infrastructure, while

creating opportunities for nature and, where possible, utilizing natural

processes.“

Budget 30 Million Euro

PROGRAM OBJECTIVES

1. Develop ecosystem knowledge enabling ‘Building with Nature (BwN)’

2. Establish how to bring the BwN-concept forward in society and make it

happen

3. Develop scientifically sound design rules and norms

4. Develop expertise to apply the BwN-concept

5. Make the concept tangible using practical BwN-examples

\

16

BUILDING WITH NATURE

PROGRAMME BASED ON 3 PILLARS

\

17

Power Plant

\

18

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

19

CONTRACTUAL DEVELOPMENTS

THEN NOW

EXTENSIVE DESIGN

WORKS BY CLIENT

EXTENSIVE DESIGN

WORKS BY

CONTRACTOR

SINGLE ACTIVITY

CONTRACTS

EPC / TURN-KEY

CONTRACTS

FIT WORK METHOD TO

DESIGN

FIT DESIGN TO

WORKMETHOD

INTERFACE

MANAGEMENT

Cost Effective and Short time to Market

\

20

Design Build Maintain Finance Operate

Traditional

Innovative

D B M F O

D B M

D B M F

D B M F O

D & B

Alliance

CONTRACT TYPES

ECI

\

21

Focus on project outcomes (best for

project)

An emphasis on openness and

communication between participants

A balanced risk/reward balance that

aligns the commercial interest of the

parties

KEY TO SUCCESSFUL PARTNERING

\

22

MELBOURNE CHANNEL DEEPENING

Australia

ALLIANCE EXAMPLE

When: during selection phase

Main goal: economic feasibility & environmental permitting / public opinion Port Phillip Heads

Port of

Melbourne

Vessel route

\

23

MELBOURNE CHANNEL DEEPENING

Australia

ALLIANCE EXAMPLE

Result : project completed ahead of schedule

actual costs far below budget

high compliance with environmental limits

IPA National Infrastructure Project of 2010

\

24

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

25

TECHNICAL DEVELOPMENTS

THEN NOW

PRODUCTION DRIVEN PRODUCT DRIVEN:

FOCUS ON QUALITY

• ENVIRONMENT

• HIGHER ACCURACIES

• DEEPER WATER

• ARCTIC CONDITIONS

\

26

LONGER SHIPS TO DREDGE DEEPER

100M+ WATERDEPTH WITH CM ACCURACY

\

27

PUSHING FOR LARGER DEPTHS

60

0m

+

Dre

dg

ing

30

00

m +

Ro

ck

In

sta

lla

tio

n

\

28

CHANNEL DEEPENING PROJECT PORT OF MELBOURNE

Dredging soft rock with a hopper dredger: high workability and maneuverability

EXTENDING THE WORKING RANGE OF

TRAILING SUCTION HOPPER DREDGERS

\

29

POSTLAY TRENCHING

• Mumbai High Fields to Uran Trunkline, India

• 20km pre-trenching and backfilling

• 420km post-lay trenching in one month

• Suitable for soft soils

\

30

DECIMETER ACCURACY DREDGING AT

100M+ WATER DEPTHS

CENTIMETER ACCURACY ROCK

PLACEMENT AT 1000M+ WATER DEPTHS

LOWER VOLUMES > COST EFFECTIVE

UNSURPASSED QUALITY

ACCURACY AND TOLERANCES

Multibeam visualisation of Nordstream

pipe & trench

\

31

\

32

FALLPIPE ROV WITH INTEGRATED SURVEY ROV:

ROCK INSTALLATION & SURVEYING IN A

SINGLE RUN

Baby ROV for Surveying

Fallpipe ROV to control Fallpipe

\

33

TRENCHERS

Rock

Clay

Sand

Trencher 1

Trencher 2

Trencher 3

< 400 km >

Highly Variable Soil Conditions

Trenchers have a

limited operability

range

What to choose? > Multifunctional Trencher with

Attachments

\

34

• FROM DIVERS TO DIVERLESS INSPECTION

ACTIVITIES

• TREND TOWARDS WORK CLASS ROV’S

• ANCHORED VESSELS TO DP2/3 VESSELS

SUBSEA

\

35

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

\

36

CHANGING ROLE

THEN NOW

DREDGING

(SUB)CONTRACTOR

MAIN CONTRACTOR OR

LARGE

SUBCONTRACTOR

LOWER EDUCATION M.SC. & PH.D.

SUPERINTENDENTS PROJECT DIRECTOR

FOCUS ON DREDGING QS, MARINE BIOLOGIST,

PROCUREMENT,

GENERAL MNGMT

CONSTRUCTION

ENGINEERING ONLY

FIT-FOR-PURPOSE

DESIGN

\

37

PIPELINE RUSSIA TO GERMANY:

NORDSTREAM

• Subcontractor for Saipem

• Pre and Post lay rock works

• German Landfall

• Over 35 Ships involved

• Natura 2000 Reserve

\

38

STRAIT OF MAGELLAN CROSSING,

ARGENTINA

• Main Contractor

• 2 Landfalls

• Trenching & Backfilling

• Long Swells, 10m+ tidal range, 6+ knots current

\

39