Visual 320.2Visual 600-2
Activity 610 – Flood warning and responseActivity 620 – LeveesActivity 630 – Dams
Manual Page 600-2600 – Warning and Response
Visual 320.3Visual 600-3
Activity 610 – Flood warning and responseElements:a. Flood threat recognition system (FTR)b. Emergency warning dissemination (EWD)c. Flood response operations (FRO)d. Critical facilities planning (CFP)e. StormReady community (SRC)f. TsunamiReady community (TRC)
Manual Page 600-2600 – Warning and Response
Visual 320.4Visual 600-4
600 – Warning and Response
Threat recognition
Warning
Operations
Critical facilities
Manual Page 600-2600 – Warning and Response
1 2
3 4
1/13/2021
2
Visual 320.5Visual 600-5
610 Flood Warning and Response
611.b Activity credit criteria
(1) First four elements: must have credit from each
(2) Description of the flood hazard
(Could be in floodplain management/mitigation plan)
(3) Flood inundation map
(4) Adopted warning and response plan
(5) Outreach project
Manual Pages 610-3 – 4610 – Flood Warning and Response
Visual 320.6Visual 600-6
(5) Outreach project
(a) Annual notice to everyone in the community
(b) Annual notice to everyone in the floodplain
(c) Another approach developed in the PPI
(d) If > 3 days advance notice → watches & warnings OK
(e) Different flooding sources → different types of projects
Manual Pages 610-4 – 5610 – Flood Warning and Response
Visual 320.7Visual 600-7
611.b Activity credit criteria
(1) First four elements: must have credit from each
(2) Description of the flood hazard
(Could be in floodplain management/mitigation plan)
(3) Flood inundation map
(4) Adopted warning and response plan
(5) Outreach project
(6) Annual exercise and evaluation
Manual Page 610-5610 – Flood Warning and Response
Visual 320.8Visual 600-8
610 – Flood Warning and Response
5 6
7 8
1/13/2021
3
Visual 320.9Visual 600-9
610 – Flood Warning and Response
www.weather.gov/ahps/ Visual 320.10Visual 600-10www.weather.gov/ahps/
610 – Flood Warning and Response
Visual 320.11Visual 600-11
National Hurricane Center
610 – Flood Warning and Response
Visual 320.12Visual 600-12
612.a Flood threat recognition system (FTR)
Level 1: Manual system
Level 2: Automated alarm: flood is coming
Level 3: Automated warning: predicted time and crest
Credit criteria
(1) Meet activity credit criteria
(2) System for at least one place in community
(3) Keyed to flood inundation map, showing what will be affected
Manual Pages 610-5 – 6610 – Flood Warning and Response
9 10
11 12
1/13/2021
4
Visual 320.13Visual 600-13
612.a Flood threat recognition system (FTR)
Documentation
(1) At visit(i) Hazard description(ii) Flood inundation map(iii) Plan (and adoption documentation)(iv) Description of the FTR system(v) Maintenance procedures (vi) Impact adjustment map
(2) At visit and recertification:(a) Outreach project(b) Report on annual exercise
Manual Pages 610-7 – 8610 – Flood Warning and Response
Visual 320.14Visual 600-14
Get
the warning out
610 – Flood Warning and Response
Visual 320.15Visual 600-15
612.b Emergency warning dissemination (EWD)
Credit criteria
(1) Meet activity credit criteria
(2) Must reach people in a timely manner
(3) Testing
Credit points
Cumulative
Max: 75
Manual Pages 610-8 – 9610 – Flood Warning and Response
Visual 320.16Visual 600-16
610 – Flood Warning and Response
13 14
15 16
1/13/2021
5
Visual 320.17Visual 600-17
Flood Inundation Map
610 – Flood Warning and Response
Visual 320.18Visual 600-18
610 – Flood Warning and Response
Visual 320.19Visual 600-19
610 – Flood Warning and Response
Visual 320.20Visual 600-20
610 – Flood Warning and Response
17 18
19 20
1/13/2021
6
Visual 320.21Visual 600-21
612.c Flood response operations (FRO)
Credit criteria
Describe the tasks to be taken at each flood level
Credit points
More details = more points
Manual Pages 610-12 – 14610 – Flood Warning and Response
Visual 320.22Visual 600-22
610 – Flood Warning and Response
Visual 320.23Visual 600-23
612.d Critical Facilities Planning (CFP)
Credit criteria
CFP1 is a prerequisite
CFP1: List of critical facilities, warning needs
CFP2: Coordinated warning and response plans
Credit points
CFP1 = up to 25 points
CFP2 = up to 50 points
Manual Pages 610-15 – 16610 – Flood Warning and Response
Visual 320.24Visual 600-24
612.e StormReady community (SRC)
Credit criteria
(1) Meet activity credit criteria
(2) Be designated by the National Weather Service
www.nws.noaa.gov/stormready/Credit points
SRC = 25 points
Manual Pages 610-17 – 18610 – Flood Warning and Response
21 22
23 24
1/13/2021
7
Visual 320.25Visual 600-25
612.f TsunamiReady community (TRC)
Credit criteria
(1) Meet activity credit criteria
(2) Be designated by the National Weather Service
(3) Meet the hazard mapping requirements in CRS Credit for Mitigation of Tsunami Hazards
(4) Adopted tsunami hazards operations plan
Credit points
SRC = 30 points
Manual Page 610-18610 – Flood Warning and Response
Visual 320.26Visual 600-26
613 Impact adjustment
r = number of buildings affected by the elementnumber of buildings in the SFHA (bSF)
Manual Page 610-19610 – Flood Warning and Response
Visual 320.27Visual 600-27
Questions?
Threat recognition
Warning
Operations
Critical facilities
610 – Flood Warning and Response
Visual 320.28Visual 600-28
Poll Questions
610 – Flood Warning and Response
25 26
27 28
1/13/2021
8
Visual 320.29Visual 600-29
620 – Levees
Visual 320.30Visual 600-30
620 – Levees
Visual 320.31Visual 600-31
Activity 620 – LeveesElements:a. Levee maintenance (LM)b. Levee failure threat recognition system (LFR)c. Levee failure warning (LFW)d. Levee failure response operations (LFO)e. Levee failure critical facilities planning (LCF)
Manual Page 620-2
620 – Levees
Visual 320.32Visual 600-32
621.b Activity Credit Criteria
(1) Designed and constructed as a levee
(2) Operated and maintained by a public agency
(3) Map and data on the area affected
145 homesNo critical facilities
Manual Page 620-3620 – Levees
29 30
31 32
1/13/2021
9
Visual 320.33Visual 600-33
621.b Activity Credit Criteria
(1) Designed and constructed as a levee
(2) Operated and maintained by a public agency
(3) Map and data on the area affected
(4) Levee maintenance plan with annual inspections
(5) Outreach project
Manual Page 620-4620 – Levees
Visual 320.34Visual 600-34
(5) Outreach project
(a) Notice to everyone in protected area
(b) Another approach developed in the PPI
Gets Activity 330 (Outreach Projects) credit
Manual Page 620-4620 – Levees
Visual 320.35Visual 600-35
621.b Activity Credit Criteria
(1) Designed and constructed as a levee
(2) Operated and maintained by a public agency
(3) Map and data on the area affected
(4) Levee maintenance plan with annual inspections
(5) Outreach project
(6) Must obtain some credit in LFR, LFW, LFO, LCF
(7) Adopted levee failure flood warning and response plan
(8) Annual exercise
Manual Pages 620-3 – 5620 – Levees
Visual 320.36Visual 600-36
621.c Map of the Affected Area
Accredited levees: B Zone/shaded X Zone
Manual Pages 620-5 – 6620 – Levees
33 34
35 36
1/13/2021
10
Visual 320.37Visual 600-37
621.c Map of the Affected Area
Accredited levees: B Zone/shaded X Zone
Non-accredited levees: area lower than top of levee
Manual Pages 620-5 – 6620 – Levees
Visual 320.38Visual 600-38
621.c Map of the Affected Area
Manual Pages 620-5 – 6620 – Levees
Visual 320.39Visual 600-39
622.a Levee maintenance (LM)
(1) LM1: Annual inspection and maintenance
(2) LM2: Levee agency’s emergency action plan
Need both for LM credit and need LM credit for 620 credit
Manual Pages 620-6 – 8620 – Levees
Visual 320.40Visual 600-40
Levee failure warning and response plan
622.b Levee failure threat recognition system (LFR)
622.c Levee failure warning (LFW)
622.d Levee failure response operations (LFO)
622.e Levee failure critical facilities planning (LCF)
Manual Pages 620-10 – 18620 – Levees
37 38
39 40
1/13/2021
11
Visual 320.41Visual 600-41
623 Impact adjustment
r = number of buildings affected by the element .number of buildings affected by levee failure (bLF)
Manual Pages 620-18 – 19620 – Levees
Visual 320.42Visual 600-42
Questions?
620 – Levees
Visual 320.43Visual 600-43
630 – Dams
Visual 320.44Visual 600-44
630 – Dams
41 42
43 44
1/13/2021
12
Visual 320.45Visual 600-45
Activity 630 – DamsElements:a. State dam safety program (SDS)b. Dam failure threat recognition system (DFR)c. Dam failure warning (DFW)d. Dam failure response operations (DFO)e. Dam failure critical facilities planning (DCF)
Manual Page 630-2
630 – Dams
Visual 320.46Visual 600-46
632.a State dam safety program (SDS)
State self-assesses its program for:
• Assessment of condition of dams in the state
• Risk communication and public awareness
• Promotion of emergency action plans by operators
Community must be impacted by a high hazard dam failure
Community must be in compliance with state program
Credit points
SDS = up to 45 points
Manual Page 630-5630 – Dams
Visual 320.47Visual 600-47
630 – Dams
Visual 320.48Visual 600-48
632.a State dam safety program (SDS)
Documenting impact by a dam failure
• Provide a copy of a dam failure inundation map
• Show ISO a copy of the map
• Get a letter from the state dam safety office
http://crsresources.org/600-2/
Manual Page 630-5630 – Dams
45 46
47 48
1/13/2021
13
Visual 320.49Visual 600-49
631.b Activity Credit Criteria
(1) > 1 building subject to dam failure flooding
(2) Description of the dam failure threat
1,453 homes75 businesses
22 critical facilities
Manual Page 630-3630 – Dams
Visual 320.50Visual 600-50
631.b Activity Credit Criteria
(1) > 1 building subject to dam failure flooding
(2) Description of the dam failure threat
(3) Must obtain some credit in DFR, DFW, DFO, DCF
(4) Adopted dam failure flood warning and response plan
(5) Outreach project
(6) Annual exercise
Manual Pages 630-3 – 5630 – Dams
Visual 320.51Visual 600-51
Dam failure warning and response plan
632.b Dam failure threat recognition system (DFR)
632.c Dam failure warning (DFW)
632.d Dam failure response operations (DFO)
632.e Dam failure critical facilities planning (DCF)
Manual Pages 630-6 – 13630 – Dams
Visual 320.52Visual 600-52
633 Impact adjustment
r = number of buildings affected by the element .number of buildings affected by dam failure (bDF)