CONTRACT IMPLEMENTATION STATUS OF SUPPLY OF SOLAR PV SYSTEM

UNDER REPLOT 2-LOT 5

Eastern DR (Lot 5)

PanchtharTaplejungSankhuwasabhaOkhaldhunga

Central DR (Lot 4)

DhadingDolakhaRamechhap

Western DR (Lot 4)

GorkhaMyagdiMustang

MidWestern DR (Lot 3)

HumlaJumlaMuguDolpaSalyan

Far Western DR (Lot 2)

BaitadiDotiAcchamBajuraBhajangDarchula

CONTRACT IMPLEMENTATION AREA

PROJECT DESCRIPTION

Health

Post

School 1

School 2

Community Computer

Liter

acy

Community En

tertai

nment

Community Communica

tion Center

0

50

100

150

200

250

206238

140

29 59124

To t a l N u m b e r o f Pa c k a g e s ( 7 9 6 : 6 5 3 + 1 4 3 a d d i ti o n a l )

Lot 2 (234) Lot 3 (156) Lot 4 (193) Lot 5 (213)0

10

20

30

40

50

60

70

80

68

3942

57

74

4547

72

3129

34

46

12

6

11

16 1721

5

33

20

38

33

Health Post

School 1

School 2

Community Computer Literacy

Community Enter-tainment

Community Commu-nication Center

PROJECT DESCRIPTION (contd…)

N u m b e r o f Pa c k a g e s ( Lo t w i s e i n c l u d i n g 1 4 3 a d d i ti o n a l sy s te m s )

CommissioningTrainingInstallationTransportation to Site Hub

Clearance and Sorting

Distribution to End User

Equipment Collection

SCOPE OF WORK

A Sorting and Packing in Centralized Facility

B Delivery Planning

C Coordination Meeting with REP and CO’s before Installation

D Installation

E Training and Commissioning

IMPLEMENTATION STRATEGY

Butwal for Lot 2, Biratnagar for Lot 5, Surkhet for Lot 3, Pokhara and Kathmandu for Lot 4

SORTING AND PACKING IN CENTRALIZED FACILITY

Transportation to Road-Head via Truck(over the blacktopped and primary road)

Transportation to Sites (secondary roads and foot trails) in Coordination with CO’s and End Users

Distribution of Equipments to the End Users by Porters Mobilization of Local People for Transportation

DELIVERY PLANNING

Deployment of Installation Team after Delivery of Equipments At least One Local Person to Assist and Receive Basic

Installation Training

INSTALLATION

Combined Operation Maintenance Training to End Users, Member of CO and Local People

TRAINING

4

Maintaining Coordination among CO’s, End Users and Installation Team

3

Deployment of Huge Installation Team

2

Delivery of Equipments to Respective Sites

1

Sorting and Packing Huge Volume of Equipments

CHALLENGES

IMPLEMENTED SCHEDULE

IMPLEMENTED SCHEDULE ( LOT 2 & LOT 5 )

IMPLEMENTATION SCHEDULE ( LOT 3 & LOT 4 )

PROJECT HIGHLIGHTS

Time Consumed in Custom

Temporary Inaccessibility During Rainy

Season Temporary Inaccessibility During Winter

Season

UNFORSEEN PROBLEM

CONCLUSION We have implemented the project on time as per the schedule

We are committed to complete the initial allocated projects as well as additional projects with little deviation in allocated time as the number of projects have been increased by 25%

We have maintained the high level quality standards as per the contract

We have tried to provide maximum benefits to the Locals by providing them opportunities like temporary employment and valuable trainings

THANK-YOU